1011 SW Klickitat Way, Suite 104, Seattle, Washington 98134
Phone 206-381-1128
Toll Free 800-666-2959
Fax 206-254-4279
Environmental Consulting
Hazardous Materials Management
Industrial Hygiene Services
Construction Management
Indoor Air Quality
LIMITED LEAD AND ASBESTOS SURVEY REPORT
NATIONAL PARK SERVICE - OLYMPIC NATIONAL PARK
LAKE QUINAULT - CLAYTON PROPERTY
8 Viewpoint Lane
Amanda Park, Washington 98526
November 22nd, 2017
Prepared For:
Jeff Doryland
Deputy Chief of Facility Management
Olympic National Park
600 E. Park Avenue, Port Angeles, WA 98273 ii
Limited Lead and Asbestos Survey Report
National Park Service – Olympic National Park
Lake Quinault - Clayton Property
8 Viewpoint Lane
Amanda Park, Washington
EHSI Project No.: # 11035
The material and data in this report were prepared under the supervision and direction of the undersigned.
Rory Peterson
Lead AHERA Building Inspector
Derica Escamilla
Principal of Hazardous Materials
Services iii
TABLE OF CONTENTS
Acronym List .................................................................................... iv
1.0 EXECUTIVE SUMMARY
1.1 BACKGROUND
1.2 EXTENT OF CURRENT SURVEY
1.3 ACM MATERIALS FOUND
1.4 OPINIONS AND RECOMMENDATIONS
1.5 LIMITATIONS/DISCLAIMER
2.0 LIMITED LEAD AND ASBESTOS SURVEY REPORT
2.1 BACKGROUND
2.2 BUILDING DESCRIPTION
2.3 SAMPLING METHODOLOGY
2.3.1 Asbestos-Containing Materials
2.3.2 Lead-Containing Paint/Lead-Containing Materials
2.4 SAMPLING RESULTS
2.4.1 Asbestos-Containing Materials
2.4.2 Lead-Containing Paint and Building Materials
2.4.3 Toxicity Characteristic Leaching Procedure Sampling
2.4.4 Polychlorinated Biphenyls
2.4.5 Mercury-Containing Fluorescent Light Tubes and CFL Bulbs
3.0 LIMITATIONS
4.0 STANDARD OF CARE
5.0 CERTIFIED AHERA BUILDING INSPECTORS
APPENDICES
A........................ Asbestos Laboratory Reports and Field Data Forms
B........................ Lead Laboratory Reports and Field Data Forms
C........................ Certified AHERA Building Inspector Certificates
D ....................... Laboratory Certifications for Asbestos and Lead Analysis
E ........................ Sample Location Drawings for Asbestos, Lead, and TCLP
F ........................ Lead TCLP Laboratory Reports and Field Data Forms
G ....................... Abatement Cost Estimate iv
ACRONYM LIST
ACM.......................Asbestos-Containing Material
ACT ....................... Acoustic Ceiling Tile AHERA ................... Asbestos Hazard Emergency Response Act
AIHA ...................... American Industrial Hygiene Association CFL ........................ Compact Fluorescent Light
CFR ....................... Code of Federal Regulations
DOSH.....................Washington State Department of Labor and Industries, Division of Occupational Safety and Health
EA ......................... Each Ecology .................. Washington State Department of Ecology
EHSI ...................... EHS-International, Inc.
ELLAP .....................Environmental Lead Laboratory Accreditation Program
GWB ...................... Gypsum Wall Board Hg ......................... Mercury
JC..........................Joint Compound
LCM ....................... Lead-Containing Material LCP........................Lead-Containing Paint
L&I ........................ Washington State Department of Labor and Industries mg/cm2 .................. Milligrams Per Square Centimeters mg/L......................Milligrams Per Liter N/A ........................Not Applicable
ND.........................None Detected NVL ....................... NVL Laboratories, Inc.
NVLAP .................... National Voluntary Laboratory Accreditation Program
OSHA ..................... US Occupational Safety and Health Administration ORCAA ................... Olympic Clean Air Agency
Pb ......................... Lead PCBs ...................... Polychlorinated Biphenyls
PLM ....................... Polarized Light Microscopy ppm.......................Parts per Million
QA ......................... Quality Assurance RCW ...................... Revised Code of Washington
SAT ....................... Seattle Asbestos Test, LLC
SF ......................... Square Feet SVF........................Sheet Vinyl Flooring
TCLP ...................... Toxicity Characteristic Leaching Procedure VCT ....................... Vinyl Composite Tile
WAC ...................... Washington Administrative Code WT ........................ Weight w/ ......................... With XRF ....................... x-ray fluorescence
NPS – Lake Quinault - Clayton Property
EHSI Project 11035 November 22nd, 2017
1.0 EXECUTIVE SUMMARY
1.1 BACKGROUND
The National Park Service (NPS) plans to demolish the existing structures on the Clayton
Property located on Lake Quinault at 8 Viewpoint Lane, Amanda Park, Washington. The NPS has contracted EHS-International, Inc. (EHSI), a hazardous materials and industrial hygiene consulting firm, to conduct a Limited Lead and Asbestos Survey of the Clayton Property in preparation for this project. The intent of the survey is to specifically identify and quantify asbestos-containing building materials (ACM), lead-containing paint (LCP), other lead-containing building materials (LCM), to collect a lead toxicity characteristic leaching procedure
(TCLP) sample representative of all materials that may be in the assumed waste stream, and to inspect and quantify fluorescent light fixtures that may contain polychlorinated biphenyl
(PCB)-containing ballasts, and mercury (Hg)-containing fluorescent light tubes, compact fluorescent light (CFL) bulbs, and high intensity discharge (HID) lamps, that may be impacted by the demolition.
1.2 EXTENT OF CURRENT SURVEY
EHSI inspected all accessible interior and exterior materials potentially impacted by the proposed project. Accessible suspect materials were sampled including, but not limited to:
interior and exterior wall systems, window systems, and mechanical systems. EHSI accomplished a representative destructive inspection.
1.3 ACM MATERIALS FOUND
SUMMARY OF ASBESTOS-CONTAINING MATERIALS
NATIONAL PARK SERVICE
LAKE QUINAULT – CLAYTON PROPERTY
ASBESTOS MATERIAL DESCRIPTION LOCATION
ACM popcorn ceiling texturing on non-ACM wood fiber ceiling panels (on unfinished GWB) [Sample #s 32, 33, 34] 1st Floor, Living Room
ACM popcorn ceiling texturing on non-ACM GWB ceilings [Sample #s 35, 36, 37]
1st Floor, Bedroom, Dining Room, Bathroom, Hallway
Non-ACM yellow foam carpet pad on ACM remnant beige/gray SVF paper backing on non-ACM yellow mastic on non-ACM 9”x9” brown VCT w/ non-ACM black/brown mastic on wood [Sample # 38]
1st Floor, Living Room
Non-ACM yellow foam carpet pad on non-ACM dark red SVF (w/ brick pattern) w/ ACM white/gray paper backing w/
ACM beige mastic on wood [Sample # 40]
1st Floor, Dining Room
ACM off-white window glazing putty (on 3’x1’6” old wood window) [Sample # 85]
House, Basement, Exterior East Side
Small electrical panel w/ assumed ACM internal components
(6”x10”) Well House
Electrical panels w/ assumed ACM internal components (various sizes)
Basement, Playroom Exterior, N. Side
Studio, Living Room
EHSI Project 11035 November 22nd, 2017
SUMMARY OF ASBESTOS-CONTAINING MATERIALS
NATIONAL PARK SERVICE
LAKE QUINAULT – CLAYTON PROPERTY
ASBESTOS MATERIAL DESCRIPTION LOCATION
ACM popcorn ceiling texturing on non-ACM wood fiber ceiling panels (on unfinished GWB) [Sample #s 32, 33, 34]
1st Floor, Living Room
KEY: ACM = asbestos containing material, bold = bold text indicates asbestos-containing layer, GWB
= gypsum wall board, SVF = sheet vinyl flooring, VCT = vinyl composite tile, w/ = with
1.4 OPINIONS AND RECOMMENDATIONS
The project includes demolition of the existing structures at the Clayton Property; therefore, EHSI recommends that all impacted ACM identified in paragraph 1.3 be removed and disposed of prior to renovation and demolition activities.
Any suspect materials not identified as having been surveyed in this report must be treated as an ACM until determined otherwise by a Certified Asbestos Building Inspector and NVLAP certified laboratory.
Washington State Department of Labor and Industries (L&I) Division of Occupational Safety and Health (DOSH) and the US Occupational Safety and Health Administration (OSHA) require employers to conduct a hazard assessment and take appropriate worker protection precautions whenever building materials are disturbed that have detectable quantities of lead. Since the type of work planned (e.g., demolition) will disturb the LCP, the contractor should perform an initial exposure assessment to determine if the additional personal protective measures and work practices are required beyond that of initial assessment. Special care should be taken to reduce potential employee exposure to lead when demolishing porcelain bathroom fixtures and painted metal, including reducing airborne dust (eq., water misting and use of hand tools, and/or local exhaust ventilation).
Fluorescent light fixtures inspected have magnetic ballasts which are assumed to contain greater than two parts per million (> 2 ppm) PCB-dielectric fluid. Magnetic ballasts must be removed from fixtures and disposed of as Washington Department of Ecology (Ecology) Dangerous Waste. All fluorescent light tubes and CFL bulbs contain mercury; any fluorescent tubes/bulb to be disturbed during the project must be recycled as (Ecology) Universal Waste.
1.5 LIMITATIONS/DISCLAIMER
This report does not represent a comprehensive hazardous materials investigation for the subject property. This investigation has been conducted by EHSI under a specific scope of work authorized by the NPS for a specific purpose. Energized electrical panels were not sampled but were assumed to have ACM internal components based on the inspector’s experience with similar systems on other projects. This report and accompanying appendices include the supporting information for this executive summary.
EHSI Project 11035 November 22nd, 2017
2.0 LIMITED LEAD AND ASBESTOS SURVEY REPORT
2.1 BACKGROUND
The NPS plans to demolish the existing structures at the Clayton Property. In conjunction with the planned demolition, the NPS has contracted EHSI to accomplish a pre-demolition limited lead and asbestos survey of the existing structures and to collect a lead-TCLP sample representative of the anticipated demolition debris. For the limited lead and asbestos survey, EHSI was tasked to use applicable federal, state, and local guidelines in the accomplishment of its survey. EHSI was further tasked to provide a written survey report including:
identification of all suspect materials; a determination of whether suspect materials were:
ACM, LCP, and LCM, and to provide analytical reports indicating the presence and quantity of the hazardous materials.
From October 16th and 17th, 2017, EHSI conducted a Limited Lead and Asbestos Survey that meets the Washington State “Good Faith Survey” requirements as cited in Revised Code of
Washington (RCW) 49.26.016 and implemented by L&I DOSH regulation, Washington Administrative Code (WAC) 296-62-07721, and Regulation Section 570 of the Olympic Region
Clean Air Agency (ORCAA).
2.2 BUILDING DESCRIPTION
The Clayton Property is located on Lake Quinault at 8 Viewpoint Lane, Amanda Park, Washington. Structures on the property include a three-story single occupancy residential house, a detached one-story studio apartment, a well pump house, and a collapsed shed.
The main building is a wood-framed structure with a concrete foundation and a slab on grade foundation in the basement. The building has a wood shingle roof. Interior floor finishes include: carpet, vinyl composite tile (VCT), ceramic floor tiles, and sheet vinyl flooring (SVF).
Interior wall finishes include: gypsum wallboard (GWB), ceramic wall tiles, wood wall panels, and wood wall panels on GWB. Interior ceiling finishes include: 2’x4’ suspended acoustical ceiling tiles (SACT), GWB, and wood ceiling panels. All windows are vinyl framed and operable.
Hot water is provided by an electric domestic hot water tank. Heating is provided by electric baseboard units. Interior lighting consists of incandescent and fluorescent ceiling fixtures and natural light from the windows.
The detached studio apartment is a single-story structure with poured concrete slab foundation and 3-tab roofing. Interior finishes include GWB walls and wood walls. Hot water is provided by an electric domestic hot water tank. Heating is provided by electric baseboard units.
The well pump house is a wood-framed structure with wood shingle siding. Power is provided for the water pump. There is no heating or plumbing for this structure.
The collapsed shed is a wood-framed structure with wood siding. There was no electrical, heating, or plumbing for this structure.
EHSI Project 11035 November 22nd, 2017
2.3 SAMPLING METHODOLOGY
2.3.1 Asbestos-Containing Materials
The EHSI field inspectors are asbestos Building Inspectors, certified under the requirements of the United States Environmental Protection Agency (USEPA) AHERA regulation 40 Code of Federal Regulations (CFR) 763, Subpart E. Copies of their certificates are provided in Appendix
C. The number of bulk samples collected and their locations are based on the AHERA regulation and the guidelines provided by the USEPA Document 560/5-85-030a, October
1985, Asbestos in Buildings: Simplified Sampling Scheme for Friable Surfacing Materials.
EHSI collected samples and obtained analytical data for suspect ACM identified on the property. Once collected, each bulk sample was sealed in an unadulterated plastic bag to eliminate the possibility of cross-contamination. “Chain-of-Custody” tracking was followed to maintain sample integrity during handling and data reporting at EHSI and the analytical laboratory. As specified in 40 CFR Chapter 1 (1-1-87 edition) Part 763, Subpart F, and
Appendix A, each sample was analyzed using polarized light microscopy (PLM) / dispersion staining techniques, in accordance with USEPA Method 600/R-93/116. Samples were analyzed for asbestos content by Seattle Asbestos Test, LLC (SAT) located in Seattle, Washington. SAT participates in the National Institute for Standards and Technology (NIST) National Voluntary
Laboratory Accreditation Plan (NVLAP). Only materials containing more than 1% total asbestos were classified as “asbestos-containing” based on USEPA, state, and local regulations.
Samples in the report labeled as ##QA are quality assurance (QA) samples. Split samples were taken from the same location and they were sent to separate laboratories. QA samples were submitted to, NVL Laboratories, Inc. (NVL) in Seattle, WA, another NVLAP laboratory.
Copies of both laboratories’ NVLAP certifications are included in Appendix D.
2.3.2 Lead-Containing Paint/Lead-Containing Materials
EHSI used a Niton Model XLp x-ray fluorescence (XRF) Spectrum Analyzer to measure lead content on interior and exterior paint coatings and other suspect LCM. Measurements were representative of all layers of paint and/or LCM. A summary of Lead Paint XRF results is provided in Table 3. Bulk quality assurance samples were taken for a representative number of LBP and LCM and were sent to NVL located in Seattle, Washington, an accredited laboratory for Atomic Absorption Spectroscopy (USEPA Method-7000B) by the American Industrial
Hygiene Association (AIHA) under the Environmental Lead Laboratory Accreditation Program (ELLAP). Copies of laboratory reports and field data forms for lead are in Appendix B.
2.4 SAMPLING RESULTS
2.4.1 Asbestos-Containing Materials
Eighty-five (85) bulk samples of suspect ACM were collected as part of the survey. Five (5) of those samples were split for quality assurance analyses. Limited destructive inspection was conducted to identify hidden and/or concealed materials. Copies of the asbestos analytical laboratory results are included in Appendix A. Asbestos and lead sample location drawings are provided in Appendix E. Asbestos sampling information including: sample number, EHSI Project 11035 November 22nd, 2017 material description, sample location, and analytical results are summarized in Table 1. The
ACM and assumed ACM identified during this survey, including the quantity and location, is summarized in Table 2. Suspect materials not sampled were assumed to be ACM.
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE - CLAYTON PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-
CLA-01
Pump
House Exterior
Off-white window glazing putty w/ paint (in 2’x3’ wood-framed window)
ND N/A
11035-
CLA-02
Pump
House Exterior
Black asphaltic vapor barrier (under wood shingle on wood)
ND N/A
11035-
CLA-03
Studio
Exterior South Side
Layer 1: Black asphaltic corrugated roofing Layer 2: Black asphaltic tab roofing
Layer 3: Black asphaltic tar Layer 4: Black asphaltic tab roofing Layer 5: White Styrofoam™ (on wood)
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
N/A
N/A
N/A N/A
N/A
11035-
CLA-04
Studio
Exterior North Side
Layer 1: Black asphaltic corrugated roofing
Layer 2: Black asphaltic tab roofing
Layer 3: Black asphaltic tar Layer 4: Black asphaltic tab roofing
Layer 5: White Styrofoam™ (on wood)
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
N/A
N/A
N/A N/A
N/A
11035-
CLA-05
Studio
Exterior East Side
Layer 1: Beige window glazing putty (on 8”x1’ window in wood door)
Layer 2: Wood door
L1: ND
L2: ND
N/A
N/A
11035-
CLA-06
Studio
Bedroom
Layer 1: Off-white sprayed on texturing skim coat w/ paint
Layer 2: Joint tape Layer 3: Off-white GWB wall w/ paper (at seam)
L1: ND
L2: ND
L3: ND
N/A
N/A N/A
11035-
CLA-07
Studio
Bedroom
Layer 1: White sprayed on texturing skim coat w/ paint and paper Layer 2: Off-white GWB wall w/ paper (mid wall)
L1: ND
L2: ND
N/A
EHSI Project 11035 November 22nd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE - CLAYTON PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-
CLA-08
Studio Living
Room
Layer 1: Trace white sprayed on texturing skim coat w/ paint and paper
Layer 2: Off-white GWB wall w/ paper (mid wall)
L1: ND
L2: ND
N/A
N/A
11035-
CLA-09
Studio Living
Room
Layer 1: Black foam window glazing gasket Layer 2: Black rubber gasket
(on 6’x3’ and 3’x3’ metal-framed windows)
L1: ND
L2: ND
N/A
N/A
11035-
CLA-10
Studio
Kitchen
Layer 1: Red SVF
Layer 2: Light gray/gray paper backing w/ tan mastic
Layer 3: Older beige paper backing w/ brown mastic Layer 4: Wood
L1: ND
L2: ND
L3: ND
L4: ND
N/A
N/A
N/A
N/A
11035-
CLA-11
Studio Living
Room
Layer 1: Blue/red carpet
Layer 2: Clear woven plastic Layer 3: Beige mastic
Layer 4: Beige mesh backing w/clear plastic
Layer 5: Yellow foam pad Layer 6: Old yellow SVF
Layer 7: Beige paper backing w/ brown mastic
Layer 8: Wood
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
L6: ND
L7: ND
L8: ND
N/A
N/A N/A
N/A
N/A N/A
N/A
N/A
11035-
CLA-12
Studio Bedroom
Layer 1: Blue/gray carpet Layer 2: Clear woven plastic mesh backing
Layer 3: Beige mastic (on texturing overspray on wood)
L1: ND
L2: ND
L3: ND
N/A N/A
N/A
11035-
CLA-13QA
Studio
Kitchen
Teal/green sink undercoat (on stainless steel sink)
ND N/A
11035-
CLA-14
Studio Kitchen
Layer 1: Black sink drain gasket
Layer 2: Tan putty (on stainless steel sink)
L1: ND
L2: ND
N/A
N/A
11035-
CLA-15
Studio Living
Room
Layer 1: 2” Light brown/tan cove base
Layer 2: Brown mastic (on wood)
L1: ND
L2: ND
N/A
N/A
11035-
CLA-16
Studio
Exterior, East Side
Black asphaltic vapor barrier
(behind wood siding on wood)
ND N/A
EHSI Project 11035 November 22nd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE - CLAYTON PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-
CLA-17
Studio
Exterior, North Side
Black asphaltic vapor barrier
(behind wood siding on wood)
ND N/A
11035-
CLA-18
House, 1st
Floor, Living
Room
Layer 1: Off-white wall paper
(w/ floral pattern) Layer 2: GWB wall w/ paper
(1/2 behind mechanically fastened wood wall panels)
L1: ND
L2: ND
N/A
N/A
11035-
CLA-19
House, 1st
Floor, Kitchen
Layer 1: Beige/off-white wall paper (w/ floral pattern) Layer 2: GWB wall w/ paper
(behind wood wall panels)
L1: ND
L2: ND
N/A
N/A
11035-
CLA-20
House, 1st
Floor, Diving Room
Layer 1: Off-white wall paper (w/ floral pattern w/ vertical lines) Layer 2: GWB wall w/ paper
L1: ND
L2: ND
N/A
N/A
11035-
CLA-21
House, 1st
Floor, Kitchen
Layer 1: 4” Blue ceramic wall tiles Layer 2: Blue grout
Layer 3: White mortar
Layer 4: Brown GWB paper w/ paint
L1: ND
L2: ND
L3: ND
L4: ND
N/A
N/A
N/A
N/A
11035-
CLA-22
House, Basement, Main Room
Layer 1: 12”x12” Brown stone pattern vinyl covering Layer 2: Gray VCT
Layer 3: Clear mastic Layer 4: Blue/black vinyl covering Layer 5: Gray VCT
Layer 6: Clear mastic (on concrete)
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
L6: ND
N/A
N/A
N/A N/A
N/A
N/A
11035-
CLA-23
House, Basement, Entry
Layer 1: 12”x12” Brown stone pattern vinyl covering Layer 2: Gray VCT
Layer 3: Clear mastic
Layer 4: Blue/black vinyl covering
Layer 5: Gray VCT Layer 6: Clear mastic
Layer 7: Wood
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
L6: ND
L7: ND
N/A
N/A
N/A
N/A
N/A
EHSI Project 11035 November 22nd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE - CLAYTON PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-
CLA-24
House, Basement, Play Room
Layer 1: Red carpet
Layer 2: Clear plastic mesh backing
Layer 3: Off-white mastic Layer 4: Yellow foam backing
(on wood)
L1: ND
L2: ND
L3: ND
L4: ND
N/A
N/A
N/A N/A
11035-
CLA-25
House, Basement, Hallway
Layer 1: 6” White ceramic floor tile
Layer 2: Blue grout Layer 3: White mortar
Layer 4: Trace white mesh
Layer 5: Dark gray/gray mortar
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
N/A
N/A N/A
N/A
N/A
11035-
CLA-26
House, 2nd
Floor, South
Bedroom
Layer 1: Beige/brown wall paper
(w/ floral and dot pattern) w/ white coating Layer 2: GWB wall w/ paper
L1: ND
L2: ND
N/A
N/A
11035-
CLA-27
House, 1st
Floor, Hall
Layer 1: Wood wall paneling
Layer 2: Clear mastic Layer 3: White/brown GWB paper
L1: ND
L2: ND
L3: ND
N/A
N/A N/A
11035-
CLA-28
House, 1st
Floor, Bathroom
Layer 1: White texturing skim coat w/ paint and paper
Layer 2: Brown GWB wall w/ paper (corner)
L1: ND
L2: ND
N/A
N/A
11035-
CLA-29
House, 1st
Floor, Bathroom
Layer 1: White texturing skim coat w/ paint and paper Layer 2: Brown GWB wall w/ paper (mid wall)
L1: ND
L2: ND
N/A
N/A
11035-
CLA-30
House, 1st
Floor, Bathroom
Layer 1: White texturing skim coat w/ paint and paper
Layer 2: Brown GWB wall w/ paper (mid wall)
L1: ND
L2: ND
N/A
N/A
11035-
CLA-31
House, Basement, Stairwell
Layer 1: Green multi-color carpet Layer 2: Beige mastic
Layer 3: Beige/off-white mesh backing
Layer 4: Yellow foam backing
(on wood)
L1: ND
L2: ND
L3: ND
L4: ND
N/A
N/A
N/A
N/A
11035-
CLA-32
House, 1st
Floor, Living Room
Layer 1: Off-white popcorn ceiling texturing w/ paint
Layer 2: Wood fiber ceiling panels (on unfinished GWB, edge)
L1: 2%
L2: ND
Chrysotile
EHSI Project 11035 November 22nd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE - CLAYTON PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-
CLA-
33QAX
House, 1st
Floor, Living
Room
Layer 1: Off-white popcorn ceiling texturing w/ paint Layer 2: Wood fiber ceiling panels w/paint (on unfinished GWB, mid ceiling)
L1: 5%
L2: ND
Chrysotile
N/A
11035-
CLA-34
House, 1st
Floor, Living Room
Layer 1: Off-white popcorn ceiling texturing w/ paint Layer 2: Wood fiber ceiling panels (on unfinished GWB, mid ceiling)
L1: 2%
L2: ND
Chrysotile
N/A
11035-
CLA-35
House, 1st
Floor, Bedroom
Layer 1: Off-white popcorn ceiling texturing w/ paint Layer 2: GWB ceiling w/ paper
(edge)
L1: 2%
L2: ND
Chrysotile
N/A
11035-
CLA-36
House, 1st
Floor, Hall
Layer 1: Off-white popcorn ceiling texturing w/ paint
Layer 2: GWB ceiling w/ paper
(mid ceiling)
L1: 2%
L2: ND
Chrysotile
N/A
11035-
CLA-37
House, 1st
Floor, Bathroom
Layer 1: White popcorn ceiling texturing w/ paint
Layer 2: GWB ceiling w/ paper (mid ceiling)
L1: ND
L2: ND
N/A
N/A
11035-
CLA-38
House, First Floor, Living Room
Layer 1: Yellow foam carpet pad
Layer 2: Remnant beige/gray SVF paper backing
Layer 3: Trace yellow mastic Layer 4: 9”x9” Brown VCT
Layer 5: Black/brown mastic Layer 6: Wood
L1: ND
L2: 60%
L3: ND
L4: ND
L5: ND
L6: ND
N/A
Chrysotile
N/A N/A
N/A N/A
11035-
CLA-39
House, 1st
Floor, Kitchen
2’x4’ Wood fiber ACT w/ white paint (w/ work track and pinhole pattern)
ND N/A
11035-
CLA-40
House, 1st
Floor, Diving Room
Layer 1: Yellow foam carpet pad
Layer 2: Dark red SVF (w/ brick pattern)
Layer 3: White/gray paper backing w/ beige mastic
Layer 4: Wood w/ gray paint
L1: ND
L2: ND
L3: 52%
L4: ND
N/A
N/A
Chrysotile
N/A
11035-
CLA-41
House, 2nd
Floor, North Bedroom
Layer 1: White texturing skim coat w/ paint
Layer 2: Wood ceiling panels w/ paint
L1: ND
L2: ND
EHSI Project 11035 November 22nd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE - CLAYTON PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-
CLA-42
House, 2nd
Floor, North Bedroom
Layer 1: White texturing skim coat w/ paint Layer 2: Wood ceiling panels w/ paint
L1: ND
L2: ND
N/A
N/A
11035-
CLA-43
House, 2nd
Floor, North
Bedroom
Layer 1: Trace white texturing skim coat w/ paint
Layer 2: Wood wall panels w/ paint
L1: ND
L2: ND
N/A
N/A
11035-
CLA-44
House, 1st
Floor, Bedroom
Layer 1: Red carpet
Layer 2: Off-white mastic Layer 3: Yellow foam backing
Layer 4: Brown/green/beige SVF w/ paint
Layer 5: Black asphaltic paper backing Layer 6: Red brittle backing (on wood)
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
L6: ND
N/A
N/A N/A
N/A
N/A
N/A
11035-
CLA-45
House, Basement, Main Room
Layer 1: White popcorn ceiling texturing w/ paint
Layer 2: JC w/ joint tape and paint
Layer 3: GWB ceiling w/ paper (at seam)
L1: ND
L2: ND
L3: ND
N/A
N/A
N/A
11035-
CLA-46
House, Basement, Main Room
Layer 1: White popcorn ceiling texturing w/ paint Layer 2: GWB ceiling w/ paper
(mid ceiling)
L1: ND
L2: ND
N/A
N/A
11035-
CLA-47
House, Basement, Bedroom
Layer 1: White popcorn ceiling texturing w/ paint
Layer 2: GWB ceiling w/ paper (mid ceiling)
L1: ND
L2: ND
N/A
N/A
11035-
CLA-48
House, Basement, Play Room
Layer 1: Newer white texturing skim coat w/ joint tape and paint
Layer 2: GWB ceiling w/ paper
(at seam)
L1: ND
L2: ND
N/A
N/A
11035-
CLA-49
House, Basement, Play Room
Layer 1: Newer white texturing skim coat w/ paint
Layer 2: GWB ceiling w/ paper (mid ceiling)
L1: ND
L2: ND
N/A
N/A
11035-
CLA-50
House, Basement, Play Room
Layer 1: Newer white texturing skim coat w/ paint Layer 2: GWB ceiling w/ paper
(mid ceiling)
L1: ND
L2: ND
EHSI Project 11035 November 22nd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE - CLAYTON PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-
CLA-51
House, 1st
Floor, Dining
Room
Gray leveling compound (under foam carpet pad)
ND N/A
11035-
CLA-52
House, 1st
Floor, Hallway
Layer 1: Off-white carpet Layer 2: Off-white/white mesh w/plastic Layer 3: Off-white mastic
Layer 4: Yellow foam carpet pad Layer 5: 9”x9” Light brown VCT
Layer 6: Brown mastic
Layer 7: Trace wood
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
L6: ND
L7: ND
N/A N/A
N/A
N/A N/A
N/A
N/A
11035-
CLA-53
House, 1st
Floor, Bathroom
Layer 1: Dark blue/white ceramic floor tile
Layer 2: Gray grout Layer 3: White mortar
Layer 4: White mesh Layer 5: Gray concrete board
Layer 6: White mesh (on sample # 54)
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
L6: ND
N/A
N/A
N/A N/A
N/A N/A
11035-
CLA-54QA
House, 1st
Floor, Bathroom
Layer 1: Beige SVF (w/ broken rock pattern) Layer 2: Gray paper backing w/ off-white mastic Layer 3: Fiberboard subfloor
L1: ND
L2: ND
L3: ND
N/A
N/A
N/A
11035-
CLA-55
House, 1st
Floor, Kitchen
Layer 1: Beige gray SVF (w/
12”x12” pattern) Layer 2: Gray paper backing w/ off-white mastic
Layer 3: Wood w/ trace mastic
L1: ND
L2: ND
L3: ND
N/A
N/A
N/A
11035-
CLA-56
House, 1st
Floor, Living
Room
Layer 1: Red chimney/fireplace brick
Layer 2: Gray mortar
L1: ND
L2: ND
N/A
N/A
11035-
CLA-57
House, 2nd
Floor, Center
Room
Layer 1: Off-white carpet
Layer 2: Off-white mastic
Layer 3: White mesh w/ plastic Layer 4: Yellow foam carpet pad
Layer 5: Brown mastic Layer 6: Wood w/ trace mastic
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
L6: ND
N/A
N/A
N/A N/A
N/A N/A
11035-
CLA-58
House, Basement, Bathroom
Layer 1: White texturing w/ paint Layer 2: Blue/gray wall paper w/ coating Layer 3: Wood wall panels
L1: ND
L2: ND
L3: ND
N/A
EHSI Project 11035 November 22nd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE - CLAYTON PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-
CLA-59
House, Basement, Bathroom
Layer 1: White texturing w/ paint Layer 2: Blue/gray wall paper
Layer 3: Wood wall panels
L1: ND
L2: ND
L3: ND
N/A
N/A
N/A
11035-
CLA-60
House, Basement, Bedroom
Layer 1: White texturing w/ paint
Layer 2: White JC w/ joint tape and paint
Layer 3: GWB wall w/ paper (corner)
L1: ND
L2: ND
L3: ND
N/A
N/A
N/A
11035-
CLA-61
House, Basement, Bedroom
Layer 1: White texturing w/ paint Layer 2: Gray texturing w/ paint
Layer 3: JC w/ paper
Layer 4: GWB wall w/ paper (mid wall)
L1: ND
L2: ND
L3: ND
L4: ND
N/A
N/A
N/A
N/A
11035-
CLA-62
House, Basement, Main Room
Layer 1: Green wall paper
Layer 2: White texturing w/ paint
Layer 3: Green/blue wall paper Layer 4: GWB wall w/ paper
(mid wall)
L1: ND
L2: ND
L3: ND
L4: ND
N/A
N/A
N/A N/A
11035-
CLA-63
House, Basement, Play Room
Layer 1: Off-white wall paper Layer 2: Wood wall panels
L1: ND
L2: ND
N/A N/A
11035-
CLA-64
House, Basement, Hallway
Layer 1: White/pink wall paper (w/ floral pattern) w/coating
Layer 2: White/light green wall paper w/white coating
Layer 3: GWB wall w/ paper Layer 4: Off-white mastic
Layer 5: White/light green wall paper w/coating Layer 6: White wall paper w/ brown coating Layer 7: Wood wall panel w/ black coating (on wood framing)
L1: ND
L2: ND
L3: ND
L4: ND
L5: ND
L6: ND
L7: ND
N/A
N/A
N/A N/A
N/A
N/A
N/A
11035-
CLA-65
Exterior
East
Layer 1: White window frame caulking w/ paint (between frame and decorative storm shutters on 4’x5’ window)
Layer 2: Wood window frame
L1: ND
L2: ND
EHSI Project 11035 November 22nd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE - CLAYTON PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-
CLA-66
Exterior East
Layer 1: Off-white/beige window frame caulking w/ paint (between wood frame and vinyl windows, on 4’x5’ window) Layer 2: Wood window frame
L1: ND
L2: ND
N/A
N/A
11035-
CLA-67
Exterior
South
White window frame caulking
(4’x4’ vinyl-framed windows)
ND N/A
11035-
CLA-68
Exterior West
Gray sealant (along chimney cracks)
ND N/A
11035-
CLA-69
House, 1st
Floor, Living Room
Layer 1: White/brown silicon window frame caulking (same system as sample #67)
Layer 2: Wood window frame
L1: ND
L2: ND
N/A
N/A
11035-
CLA-70
Exterior
West
Layer 1: Gray patching material Layer 2: White patching material w/ paint Layer 3: White patching material w/ paint Layer 4: Gray mortar w/ paint
(on chimney)
L1: ND
L2: ND
L3: ND
L4: ND
N/A N/A
N/A
N/A
11035-
CLA-71
House, Basement, Entry
Layer 1: White door frame caulking (around single vinyl door)
Layer 2: Wood trim
L1: ND
L2: ND
N/A
N/A
11035-
CLA-72
House, 2nd
Floor, Inside Attic of North
Bedroom
Layer 1: Black fiberglass batt insulation
Layer 2: Brown paper vapor barrier
L1: ND
L2: ND
N/A
N/A
11035-
CLA-73
House, Basement, Main Room
Layer 1: Yellow fiberglass batt insulation
Layer 2: Brown paper vapor barrier w/ black mastic
L1: ND
L2: ND
N/A
N/A
11035-
CLA-74
House, 2nd
Floor, Above
Ceiling in South
Bedroom
Layer 1: Black fiberglass batt insulation Layer 2: Black asphaltic paper vapor barrier w/ black mastic
Layer 3: Wood w/ trace mastic
L1: ND
L2: ND
L3: ND
N/A
N/A
N/A
11035-
CLA-75QA
House, First Floor, Dining Room
Black asphaltic vapor barrier
(underneath wood window sill)
ND N/A
EHSI Project 11035 November 22nd, 2017
TABLE 1
SUMMARY OF ASBESTOS BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE - CLAYTON PROPERTY
SAMPLE
NUMBER
SAMPLE
LOCATION
MATERIAL DESCRIPTION
ASBESTOS
TYPE OF
ASBESTOS
11035-
CLA-76
Exterior
South
Black asphaltic vapor barrier w/ paint (under metal and wood siding)
ND N/A
11035-
CLA-77
Roof
Layer 1: Black asphaltic vapor barrier (under wood shingle roofing)
Layer 2: Wood shingles
L1: ND
L2: ND
N/A
N/A
11035-
CLA-78
House, 1st
Floor, Entry
Black asphaltic vapor barrier w/ trace mastic (behind wood siding)
ND N/A
11035-
CLA-79
Roof Black asphaltic vapor barrier (under wood shingle roofing)
ND N/A
11035-
CLA-80
Basement Exterior
Layer 1: White window glazing putty Layer 2: White window glazing putty (in 6”x1’ window in door)
L1: ND
L2: ND
N/A
N/A
11035-
CLA-81
House, Basement
Roof
Layer 1: Black asphaltic vapor barrier (beneath corrugated metal roof) Layer 2: Wood
L1: ND
L2: ND
N/A
N/A
11035-
CLA-82
House
Basement Roof
Black asphaltic vapor barrier
(beneath corrugated metal roof)
ND N/A
11035-
CLA-83
House, Basement
Exterior
Layer 1: Black asphaltic vapor barrier (beneath wood siding on wood)
Layer 2: Wood
L1: ND
L2: ND
N/A
N/A
11035-
CLA-84
House, Basement Exterior
Layer 1: Black asphaltic vapor barrier (beneath wood siding on wood) Layer 2: Trace white fibrous material
L1: ND
L2: ND
N/A
N/A
11035-
CLA-
85QAX1
House, Basement
Exterior
East Side
Off-white window glazing putty w/ paint (on 3’x1’6” old wood-framed windows)
1.3% Chrysotile
KEY: ACT = acoustic ceiling tile, GWB = gypsum wallboard, JC = joint compound, ND = non-detect, N/A = not applicable, SVF = sheet vinyl flooring, VCT = vinyl composite tile, w/ = with, X When QA lab and primary lab sample results differed, EHSI reported the most restrictive (e.g., highest % asbestos) in Table 1. Analytical results for all analyses are provided in
Appendix A.
1 Point Counted Results. Preliminary analytical reports indicated that one (1) sample on off-white window glazing putty contained approximately 2% chrysotile asbestos (Sample #s
EHSI Project 11035 November 22nd, 2017
11035-CLA-85QA). EHSI re-submitted the sample reported to have greater than 1% asbestos concentration for re-analysis using the more precise EPA “Point Count” method. The “Point Count” analytical method is recommended by the EPA for samples with less than 10% asbestos.
Based on the results of that re-analysis, the material was confirmed to contain >1% asbestos and is therefore an ACM. Materials found to contain greater than 1% asbestos are identified and quantified in Table 2 of this report. Only the “Point Count” re-analysis concentrations are listed in Table 1. Analytical results for all analyses are provided in Appendix A.
Table 2 summarizes materials identified by EHSI as containing greater than 1% asbestos fibers during its survey, and un-sampled materials assumed to be ACM. The Table 2 Summary of Asbestos Containing Materials is for engineering cost estimating purposes and is not intended for bid quantifications.
TABLE 2
SUMMARY OF ASBESTOS-CONTAINING MATERIALS
NATIONAL PARK SERVICE
LAKE QUINAULT – CLAYTON PROPERTY
ASBESTOS MATERIAL DESCRIPTION LOCATION QUANTITY
ACM popcorn ceiling texturing on non-ACM wood fiber ceiling panels (on unfinished GWB)
[Sample #s 32, 33, 34]
1st Floor, Living Room 400 SF
ACM popcorn ceiling texturing on non-ACM GWB ceilings [Sample #s 35, 36]
1st Floor, Bedroom, Dining Room, Bathroom, Hallway
450 SF
Non-ACM yellow foam carpet pad on ACM remnant beige/gray SVF paper backing on non-ACM yellow mastic on non-ACM 9”x9” brown VCT w/ non-ACM black/brown mastic on wood [Sample # 38]
1st Floor, Living Room 15 SF
Non-ACM yellow foam carpet pad on non-ACM dark red SVF (w/ brick pattern) w/ ACM white/gray paper backing w/ ACM beige mastic on wood [Sample # 40]
1st Floor, Dining Room 140 SF
ACM off-white window glazing putty (on 3’x1’6” old wood window) [Sample # 85]
House, Basement, Exterior East Side
1 EA
Small electrical panel w/ assumed ACM internal components (6”x10”) Well House 1 EA
Electrical panels w/ assumed ACM internal components (various sizes)
Basement, Playroom Exterior, N. Side
Studio, Living Room
5 EA
KEY: ACM = asbestos containing material, bold = bold text indicates asbestos-containing layer, EA = each, GWB = gypsum wallboard, SF = square feet, SVF = sheet vinyl flooring, VCT = vinyl composite tile, w/ = with
ACM identified in this survey should not be disturbed unless handled by personnel who are properly trained and certified in asbestos work. Demolition and/or renovation activities by contractors may expose concealed suspect ACM. Contractors should be aware of the potential for concealed suspect ACM and have pre-planned contingencies for the handling of suspect
ACM discovered during renovation and/or demolition work. Any concealed suspect ACM material that was not sampled or was assumed to be ACM and included in this report, must be treated as ACM until proven otherwise by a Certified AHERA Building Inspector and a certified laboratory. Contingency plans should include stopping work on identification of
EHSI Project 11035 November 22nd, 2017 concealed suspect ACM, evacuation of the area, and sampling by a Certified AHERA Building
Inspector. Concealed suspect material may include, but is not limited to: non-fiberglass pipe or roof drain insulation; spray-applied coatings; cementitious board; asphalt or paper vapor barriers; vinyl floorings and mastics.
2.4.2 Lead-Containing Paint and Building Materials
Eighty (80) samples were analyzed for lead using the X-Ray fluorescence (XRF) analyzer. XRF paint sample results ranged from 28.5 milligrams of lead per square centimeter (mg Pb/cm2) to 0 mg Pb/cm2. Bolded results indicate materials coated with “lead-based paint” (e.g., >1.0 mg/cm2) as defined by USEPA regulation 40CFR745 and Washington
State Commerce regulation WAC 365-230. The results are provided in Table 3 of this report.
Table 3 summarizes XRF lead samples, including sample number, material description, substrate, color, location and analytical results.
TABLE 3
XRF SAMPLING
SUMMARY OF PAINTED COMPONENTS AND MATERIALS
NATIONAL PARK SERVICE
LAKE QUINAULT – CLAYTON PROPERTY
Read
Component Substrate Color Building Room Lead Conc.
(mg/cm2)
SELF
CALIBRATION
N/A N/A N/A N/A 6.28
2 CALIBRATION N/A RED N/A N/A 1.0
3 CALIBRATION N/A RED N/A N/A 1.0
4 CALIBRATION N/A RED N/A N/A 1.0
5 WALL DRYWALL BEIGE SECOND NORTH < LOD
6 TRIM WOOD BROWN SECOND NORTH < LOD
7 WALL DRYWALL WHITE SECOND CENTER < LOD
8 CEILING DRYWALL WHITE SECOND SOUTH < LOD
9 WALL WOOD LIGHT BLUE SECOND SOUTH < LOD
10 COVE BASE WOOD BLUE SECOND SOUTH < LOD
11 COVE BASE WOOD BLUE SECOND SOUTH < LOD
12 WALL DRYWALL LIGHT GRAY FIRST LIVING ROOM < LOD
13 DOOR WOOD BROWN FIRST LIVING ROOM < LOD
14 CEILING DRYWALL WHITE FIRST LIVING ROOM < LOD
15 CEILING DRYWALL WHITE FIRST LIVING ROOM < LOD
16 COUNTERTOP CERAMIC BLUE FIRST KITCHEN < LOD
17 CABINET WOOD WHITE FIRST KITCHEN < LOD
18 WALL WOOD BROWN FIRST LIVING ROOM < LOD
19 BEAM WOOD BROWN FIRST LIVING ROOM < LOD
20 WALL WOOD BROWN FIRST KITCHEN 0.06
EHSI Project 11035 November 22nd, 2017
TABLE 3
XRF SAMPLING
SUMMARY OF PAINTED COMPONENTS AND MATERIALS
NATIONAL PARK SERVICE
LAKE QUINAULT – CLAYTON PROPERTY
Read
Component Substrate Color Building Room Lead Conc.
(mg/cm2)
21 WINDOW SILL WOOD BROWN FIRST DINING ROOM < LOD
22 WALL DRYWALL BEIGE FIRST BEDROOM < LOD
23 WALL WOOD BROWN FIRST HALLWAY < LOD
24 FLOOR CERAMIC WHITE FIRST BATHROOM < LOD
25 FLOOR CERAMIC BLUE FIRST BATHROOM < LOD
26 SINK CERAMIC WHITE FIRST BATHROOM < LOD
27 WALL DRYWALL WHITE FIRST BATHROOM < LOD
28 WALL DRYWALL WHITE BASEMENT PLAY ROOM < LOD
29 CEILING DRYWALL WHITE BASEMENT PLAY ROOM < LOD
30 DOOR WOOD BROWN BASEMENT PLAY ROOM < LOD
31 WALL WOOD WHITE BASEMENT ENTRY CLOSET < LOD
32 WALL WOOD BROWN BASEMENT MAIN ROOM < LOD
33 BEAM WOOD BROWN BASEMENT MAIN ROOM < LOD
34 WALL DRYWALL WHITE BASEMENT BEDROOM < LOD
35 WALL DRYWALL PINK BASEMENT HALLWAY < LOD
36 FLOOR CERAMIC WHITE BASEMENT HALLWAY 0.04
37 WALL WOOD WHITE BASEMENT HALLWAY < LOD
38 COUNTERTOP CERAMIC GREEN BASEMENT BATHROOM < LOD
39 SINK CERAMIC WHITE BASEMENT BATHROOM 28.5
40 TOILER CERAMIC WHITE BASEMENT BATHROOM < LOD
41 BATH TUB CERAMIC WHITE BASEMENT BATHROOM < LOD
42 CEILING SACT WHITE BASEMENT BATHROOM < LOD
43 CHIMNEY CONCRETE GRAY FIRST EXTERIOR < LOD
44 SIDING WOOD BROWN FIRST EXTERIOR < LOD
45 WINDOW FRAME WOOD WHITE FIRST EXTERIOR < LOD
46 FLOOR WOOD RED FIRST PORCH ENTRY < LOD
47 WALL WOOD LIGHT YELLOW FIRST PORCH ENTRY < LOD
48 DOORFRAME WOOD WHITE FIRST PORCH ENTRY 1.5
49 SIDING WOOD BROWN BASEMENT EXTERIOR < LOD
50 FASCIA WOOD WHITE FIRST EXTERIOR < LOD
51 WINDOW FRAME WOOD WHITE FIRST EXTERIOR 13.8
52 WINDOW WOOD WHITE FIRST EXTERIOR 3.9
53 DOOR FRAME WOOD RED FIRST EXTERIOR 0.1
54 BUILDING TRIM WOOD RED FIRST EXTERIOR 0.06
EHSI Project 11035 November 22nd, 2017
TABLE 3
XRF SAMPLING
SUMMARY OF PAINTED COMPONENTS AND MATERIALS
NATIONAL PARK SERVICE
LAKE QUINAULT – CLAYTON PROPERTY
Read
Component Substrate Color Building Room Lead Conc.
(mg/cm2)
55 TANK METAL WHITE FIRST INTERIOR < LOD
56 WELL PUMP METAL DARK BLUE FIRST INTERIOR < LOD
57 WELL PUMP METAL BLACK FIRST INTERIOR < LOD
58 WELL PUMP METAL BLACK FIRST INTERIOR < LOD
59 WALL WOOD BROWN STUDIO LIVING ROOM < LOD
60 WALL WOOD GOLD STUDIO LIVING ROOM < LOD
61 WINDOW SILL WOOD WHITE STUDIO LIVING ROOM < LOD
62 WALL DRYWALL WHITE STUDIO LIVING ROOM < LOD
63 DOOR WOOD WHITE STUDIO LIVING ROOM < LOD
64 DOOR FRAME WOOD WHITE STUDIO LIVING ROOM < LOD
65 DOOR WOOD WHITE STUDIO LIVING ROOM < LOD
66 COVE BASE WOOD YELLOW STUDIO LIVING ROOM 0.07
67 SINK CERAMIC YELLOW STUDIO BATHROOM < LOD
68 TOILET CERAMIC WHITE STUDIO BATHROOM < LOD
69 BEAM WOOD BROWN STUDIO LIVING ROOM < LOD
70 SIDING WOOD RED STUDIO EXTERIOR < LOD
71 DOOR TRIM WOOD RED STUDIO EXTERIOR < LOD
72 SOFFIT WOOD RED STUDIO EXTERIOR < LOD
73 FASCIA WOOD RED STUDIO EXTERIOR < LOD
74 SIDING WOOD RED FIRST COLLAPSED SHED < LOD
75 TRIM WOOD WHITE FIRST COLLAPSED SHED < LOD
76 FOUNDATION WOOD YELLOW FIRST COLLAPSED SHED 0.06
77 FOUNDATION WOOD YELLOW FIRST COLLAPSED SHED 0.08
78 CALIBRATION N/A RED N/A N/A 1.0
79 CALIBRATION N/A RED N/A N/A 1.0
80 CALIBRATION N/A RED N/A N/A 1.0
Key: N/A = not applicable
In addition to the XRF samples, EHSI collected two (2) bulk QA samples for laboratory analysis. The bulk sample results were both <0.0053 percent lead by weight (below the reporting limit). Building materials and paint containing detectable levels of lead are considered regulated by DOSH. Any contractors disturbing materials with detectable amounts of lead should conduct training and a negative exposure assessment in accordance with DOSH regulations.
Table 4 summarizes bulk QA lead samples, including sample number, material description, substrate, color, location, and analytical results.
EHSI Project 11035 November 22nd, 2017
Copies of the analytical laboratory report and field data forms for lead paint are included in Appendix B of this report.
TABLE 4
SUMMARY OF LEAD BULK SAMPLING AND ANALYTICAL RESULTS
NATIONAL PARK SERVICE
LAKE QUINAULT – CLAYTON PROPERTY
SAMPLE
NUMBER
LOCATION
COMPONENT/
SUBSTRATE
COLOR
RESULTS
% Pb by
WT
11035-CLA-
Pb01
Main Building, Exterior 1st
Floor
Window Frame /
Wood White <0.0053
11035-CLA-
Pb02
Main Building, Exterior 1st
Floor Siding / Metal Brown on Red <0.0053
Key: Pb = lead, WT = weight
DOSH requires employers to conduct a hazard assessment and take appropriate worker protection precautions whenever disturbing materials that have detectable quantities of lead.
Since the type of work planned (e.g., sawing, grinding, demolition) will disturb the lead-containing materials, the contractor should perform an initial exposure assessment to determine if additional personal protective measures and work practices are required beyond the initial exposure assessment.
2.4.3 Toxicity Characteristic Leaching Procedure Sampling
Ecology requires testing using the “toxicity characteristic leaching procedure” (TCLP) and segregation of construction debris if it is potentially contaminated with dangerous waste (e.g., lead-containing paint/lead-containing materials). Ecology has set a dangerous waste threshold for leachable lead at 5.0 milligrams of lead per liter (mg/L).
At the request of NPS, a TCLP was conducted by EHSI as part of the Limited Lead and Asbestos
Survey. The results of that lead-TCLP analysis indicate no leachable lead was present in the anticipated demolition waste stream above the laboratories reporting limit at a concentration of <0.5 mg/L. A detailed list of the materials included in the TCLP sample are provided in Appendix F.
It should be noted that this TCLP was done on behalf of NPS for disposal cost estimating purposes. It is recommended that the contractor take their own TCLP test of their demolition waste stream including the option to not TCLP specific materials based on the ability to recycle metal and concrete painted building materials.
2.4.4 Polychlorinated Biphenyls
Ballasts EHSI inspected each type of fluorescent fixture for PCB-containing ballasts. All fixtures inspected were found to contain magnetic ballasts and must be assumed to contain PCB containing dialectic fluid; therefore, they must be disposed/recycled as Ecology Dangerous
Waste. A Summary of ballasts and Hg-containing light tubes is provided in Table 5.
EHSI Project 11035 November 22nd, 2017
2.4.5 Mercury-Containing Fluorescent Light Tubes and CFL Bulbs
All fluorescent light tubes and CFL bulbs quantified in Table 5 contain Hg. Hg wastes are regulated as “universal wastes” under Ecology’s regulation WAC 173-303. Hg-containing building materials must be recycled or disposed of as hazardous waste. One Hg-containing thermostat was identified in the structures.
TABLE 5
SUMMARY OF LIGHT FIXTURE INSPECTION RESULTS
NATIONAL PARK SERVICE
LAKE QUINAULT – CLAYTON PROPERTY
LIGHT TYPE FIXTURES
TUBES/
BULBS
MAGNETIC
BALLASTS
6”x4’ Mounted light fixture w/ 2 bulbs and 1 magnetic ballast 13 26 13
CFL bulbs 5 5 0
Total Clayton Property 18 31 13 Key: CFL = compact fluorescent light, w/ = with
3.0 LIMITATIONS
This survey was limited to those materials accessible using standard survey methods. Limited representative destructive inspection was accomplished; however, energized electrical panels, were not sampled but were assumed to have ACM internal components. All suspect materials present were accessible for sampling.
This survey was limited to the chemicals and materials identified herein. No effort was made to identify hazardous materials in soil, water, or air, other than those listed herein. Any survey regardless of how extensive can miss concealed materials. Contractors should be aware of the potential that demolition activities may expose concealed suspect ACM and should have preplanned contingencies for handling these materials when discovered during demolition work. Any concealed, suspect ACM material that was not sampled or that was assumed to be
ACM by this survey report when encountered must be treated as ACM until sampled by a
Certified AHERA Building Inspector and analyzed by a certified laboratory.
4.0 STANDARD OF CARE
The recommendations and conclusions contained in this report represent the professional opinions of EHSI. These opinions are derived in accordance with federal, state, and local environmental and health and safety laws and regulations. This survey was accomplished in accordance with applicable federal, state, and local regulations and industry standards in effect at the time. Other than this, no other warranty is implied or intended.
EHSI Project 11035 November 22nd, 2017
5.0 CERTIFIED AHERA BUILDING INSPECTORS
The Certified AHERA Building Inspectors listed below surveyed on October 16th and 17th, 2017, in accordance with federal, state, and local requirements.
Rory Peterson Micki Towler Certified AHERA Building Inspector Certified AHERA Building Inspector
Certificate Number: 1628987 Certificate Number: 2016-12-09-01
Expiration Date: August 23, 2018 Expiration Date: December 9, 2017
Appendix A
APPENDIX A
Asbestos Analytical Laboratory Report and Field Data Forms
Nick Ly, Technical Director
Client Project: 11035-03
Location: Clayton Property
Dear Mr. Peterson, Enclosed please find test results for the 5 sample(s) submitted to our laboratory for analysis on
10/23/2017.
Examination of these samples was conducted for the presence of identifiable asbestos fibers using polarized light microscopy (PLM) with dispersion staining in accordance with both EPA 600/M4-82-020, Interim Method for the Determination of Asbestos in Bulk Insulation Samples and EPA 600/R-93/116
Method for the Determination of Asbestos in Bulk Building Materials.
For samples containing more than one separable layer of materials, the report will include findings for each layer (labeled Layer 1 and Layer 2, etc. for each individual layer). The asbestos concentration in the sample is determined by calibrated visual estimation.
For those samples with asbestos concentrations between 1 and 10 percent based on visual estimation, the EPA recommends a procedure known as point counting (NESHAPS, 40 CFR Part 61). Point counting is a statistically more accurate means of quantification for samples with low concentrations of asbestos.
The detection limit for the calibrated visual estimation is <1%, 400 point counts is 0.25% and 1000 point counts is 0.1%
Samples are archived for two weeks following analysis. Samples that are not retrieved by the client are discarded after two weeks.
Thank you for using our laboratory services. Please do not hesitate to call if there is anything further we can assist you with.
Sincerely, Enc.: Sample Results
October 27, 2017
Nick L T hnical D
Rory Peterson
EHS International
1011 SW Klickitat Way. Suite 104
Seattle, WA 98134
RE: Bulk Asbestos Fiber Analysis; NVL Batch # 1718890.00
< Client:
Address:
Attention: Mr. Rory Peterson
Clayton Property
Client Project #: 11035-03
Samples Received: 5
By Polarized Light Microscopy
Bulk Asbestos Fibers Analysis
EHS International
1011 SW Klickitat Way. Suite 104
Seattle, WA 98134
Method: EPA/600/R-93/116
& EPA/600/M4-82-020
Samples Analyzed: 5
Project Location:
Batch #: 1718890.00
Date Received: 10/23/2017
17102839Lab ID: Client Sample #:
Location: Clayton Property
11035-CLA-13QA
Layer 1 of 1 Description: Green flaky loose material
Non-Fibrous Materials: Other Fibrous Materials:% Asbestos Type: %
Binder/Filler, Fine particles, Mica <1%Cellulose None Detected ND
17102840Lab ID: Client Sample #:
Location: Clayton Property
11035-CLA-33QA
Layer 1 of 2 Description: White lumpy foamy material with paint
Non-Fibrous Materials: Other Fibrous Materials:% Asbestos Type: %
Calcareous binder, Synthetic foam, Paint NDNone Detected Chrysotile 5%
Layer 2 of 2 Description: Tan fibrous material with paint
Non-Fibrous Materials: Other Fibrous Materials:% Asbestos Type: %
Binder/Filler, Paint 83%Cellulose None Detected ND
17102841Lab ID: Client Sample #:
Location: Clayton Property
11035-CLA-54QA
Layer 1 of 2 Description: Beige sheet vinyl
Non-Fibrous Materials: Other Fibrous Materials:% Asbestos Type: %
Vinyl/Binder <1%Cellulose None Detected ND
Layer 2 of 2 Description: Light gray fibrous backing with mastic (on wood)
Non-Fibrous Materials: Other Fibrous Materials:% Asbestos Type: %
Mastic/Binder, Fine particles, Binder/Filler 40%Cellulose None…