Attchmt_3_Scope_of_Work.pdf

PDF 51 KB Posted

Attached to
Hazardous Materials Abatement, OLYM Federal contract opportunity
Solicitation number
140P8318Q0051
Issued by
Department of the Interior National Park Service

About this file

Attachment 3 - Scope of Work

View the file

Other files for this federal contract opportunity

Other files attached to Hazardous Materials Abatement, OLYM, newest first.
File Type Posted
Attchmt 23_Option 8-Kleiva Property Report.pdf PDF
Attchmt 19_Option 4-Kennedy Property Report.pdf PDF
Attchmt 17_Option 2-Hoiness Property Report.pdf PDF
Attchmt 21_Option 6-Walker Property Report.pdf PDF
Attchmt 16_Option 1-Clayton Property Report.pdf PDF
Attchmt 20_Option 5-Perrigo Property Report.pdf PDF
Attchmt 18_Option 3-Hopkins Property Report.pdf PDF
Attchmt 22_Option 7-Haubrich Property Report.pdf PDF
Attchmt 8_ Dinkleman Property Reportl.pdf PDF
Attchmt 15_Quinault Resort Property Report.pdf PDF
Attchmt 9_Erspamer Property Report.pdf PDF
Attchmt 12_Bemis Property Report.pdf PDF
Attchmt 11_Wolfe Property Report.pdf PDF
Zip_File_1_of_2_Attachments_7_to_15_Property_Reports.zip ZIP file
Attchmt 10_Tinkham Property Report.pdf PDF
Attchmt 14_Gilroy Property Report.pdf PDF
Attchmt 7_Bird and Bird Guest Property Report.pdf PDF
Zip_File_1_of_2_Attachments_7_to_15_Property_Reports.zip ZIP file
Attchmt 13_Fulleton Property Report.pdf PDF
Attchmt_4_Summary_Table_of_HazMat_Sites.pdf PDF
Attchmt_5_Site_Maps.pdf PDF
Attchmt_1_Combined_Synopsis-Solicitation_Full_Text.pdf PDF
Attchmt_2_DOL_Wage_15-5545.pdf PDF
Attchmt_6_Site_Photos.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation no. 140P8318Q0051, Attachment 3 (5/4/18) Hazardous Materials Abatement, Olympic National Park

SCOPE OF WORK

General Description

This project consists of hazardous materials removal, including asbestos abatement, from structures on ten properties within the boundaries of Olympic National Park. Most of the properties include multiple structures. Six of the properties are located at Lake Crescent and four properties are located in Quinault. Eight additional properties are included in this RFQ as option items. Quoter will include prices for all line items, base and options, which shall remain as firm fixed prices after award, so that if funds do become available, the government can elect to exercise any of the priced optional line items as post-award modification(s). The following documents are included as supplemental attachments to this Scope of Work:

• A summary worksheet of the hazardous materials found on each property (Solicitation Attachment no. 4)

• Maps of the subject property locations (Solicitation Attachment no. 5)

• Photographs of the structures on the subject properties (Solicitation Attachment no. 6)

• Lead and Asbestos Survey reports for the subject properties (Solicitation Attachments no.

7 – 15 comprise the basic requirement (guaranteed at time of award) and Attachments no.

16 – 23 comprise the optional properties, subject to availability of funds at time of or after award)

The hazardous materials to be removed by this contract include asbestos containing materials, mercury-containing light tubes and bulbs, PCB-containing magnetic light ballasts, and building elements containing high concentrations of lead, such as stained glass windows. Though the included surveys identify lead paint in many of the structures, lead abatement, other than specific items is not an element of this contract. Specific lead containing items for removal, as part of this contract, are identified on the excel spreadsheet.

The contractor is responsible for determining specific work methods and practices to be utilized for all work. All work methods and practices will be in compliance with all applicable Federal, State, and Local laws and regulations. The contractor will field verify all dimensions affecting the work of this contract. All identified asbestos containing material will be removed and disposed of in accordance with Washington State Regulations. Washington State Department of Labor and Industries and ORCCA require that the abatement be performed using Certified Asbestos Workers under the direct on site supervision of a Certified Asbestos Supervisor.

All work, including work practices, is subject to inspection and approval by the Contracting Officer or Representative. Work and work practices are also subject to inspection by regulatory personnel.

Work hours will be between 7:00AM and 5:30PM, Monday through Friday. The Contracting Officer or Contracting Officer’s Representative must authorize any exceptions.

The contractor is responsible for acquiring all required permits for the project. Copies of all permits, disposal documentation and clearance sample documentation will be submitted to the

Solicitation no. 140P8318Q0051, Attachment 3 (5/4/18) Hazardous Materials Abatement, Olympic National Park

Park in a completion report supplied by the contractor. The contractor will also supply the Park with documentation of appropriate certification of all workers prior to start of work.

File details come from the government source that posted it.