These are pre-proposal conference slides for a National Park Service project to replace an obsolete housing unit with a multiplex unit. The project (DETO 228872) involves constructing a one-story 6-plex building based on NPS Prototype building number three, which will include six one-bedroom units, a laundry unit, a modular community area, two RV spaces, and an outdoor gathering area. The existing 6-plex will be demolished.

The procurement is a Total Small Business Set-Aside under NAICS code 236116, with a 410-calendar day performance period. The solicitation will use a Best Value/Tradeoff source selection method, with evaluation factors including project experience, technical approach, schedule, key personnel, and past performance. Proposals must be submitted electronically, with a 10-page maximum technical approach and 4-page maximum schedule narrative. A bid bond is required, and proposals will be evaluated considering both price and non-price factors, with the government reserving the right to award without discussions.

View the file

Other files

File Type Posted
B09_A0004_Att_01_91_14_Total_Building_Comm_8-27-25_0004.pdf PDF
B09_A0004_Att_Solicitation_QandA_as_of_9-3-2025_0004.pdf PDF
Sol_140P2025R0002_Amd_0004.pdf PDF
A0003_Att_StatementStructuralTestsSpecialInspections_0003.pdf PDF
A0003_Att_Hydrant_Test_Location_0003.pdf PDF
A0003_Att_Electrical_Report_of_Contact_0003.pdf PDF
A0003_Att_Hazmat_Report_0003.pdf PDF
A0003_Att_Hydrant_Flow_Report_0003.pdf PDF
A0003_Att_S101_Foundation_Plan_0003.pdf PDF
A0003_Att_Hydrant_Location_0003.pdf PDF
A0003_Att_Geotechnical_Report_0003.pdf PDF
Sol_140P2025R0002_Amd_0003.pdf PDF
A0003_Att_01_41_50_Special_Inspections_0003.pdf PDF
A0003_Att_32_33_00_Site_Furnishings_0003.pdf PDF
A0003_Att_Hydrant_Flow_Chart_Graph_0003.pdf PDF
A0003_Att_01_91_14_Total_Building_Commissioning_0003.pdf PDF
Sol_140P2025R0002_Amd_0002.pdf PDF
B09_A0002_Att_Proposal_Submission_Package_DETO_228872_0002.docx DOCX document
B09_A0001_Att_Prebid_Sign-in_Sheet_(6-17-25)_0001.pdf PDF
Sol_140P2025R0002_Amd_0001.pdf PDF
B09_A0001_Att_Q-and-A_as_of_6-23-25_0001.pdf PDF
B08_140P2025R0002_(7-31-25).pdf PDF
B08_Att_3_WD_WY20250003_(01-03-25).pdf PDF
B08_Att_4_Structural_Test_Special_Inspections_12-3-24.pdf PDF
B08_Att_6_Electrical_Report_of_Contact.pdf PDF
B08_Att_8_Hazmat_Report_2023-06-06.pdf PDF
B08_Att_10_Hydrant_Flow_Test_1-29-21.pdf PDF
B08_Att_7_Wildfire_Report_2023-06-06.pdf PDF
B08_Att_2_Drawings_(7-24-25).pdf PDF
Sol_140P2025R0002.pdf PDF
B08_Att_9_Floodplain_Hydrologic_Hydraulic_8-15-24.pdf PDF
B08_Att_5_Geotechnical_Report_2020_12_08.pdf PDF
B08_Att_1_Specs_(7-24-25).pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-proposal Conference - June 17th, 2024

DETO 228872: REPLACE OBSOLETE HOUSING

UNIT WITH MULTIPLEX UNIT

Request for Proposals No.1443N5010070901

INTRODUCTIONS

• NPS DETO STAFF

• Tony Jasper Contracting Officer - NPS Denver Service Center

• Jason Riharb - Project Manager – NPS Denver Service Center

Request for Proposals No.1443N5010070901

TODAY’S GOAL

• Provide offerors an opportunity to gain a better understanding of the project via a meeting with NPS Staff and a site visit

• Provide potential offerors an opportunity for a thorough site investigation and to visit the site in order to better understand some of the logistical constraints of the project.

• Questions are encouraged.

Questions shall be asked in the open for the entire group to hear.

Please no side-bar conversations.

Questions that can not be answered today will be answered via a solicitation amendment.

Request for Proposals No.1443N5010070901

Agenda

9:00 to 10:00 – Meeting at Park Headquarter for a project overview, introduction.

10:00 to 11:00 – Meeting at the project site

PROJECT SCOPE

• Construction of a one story 6-plex building that will be based on the NPS Prototype building number three, which is an 8-plex. The modified building three will be a one story 6-plex building consisting of (6) one bedroom units, which will also include a laundry unit and a modular community area. The site will also include two RV spaces, an outdoor gathering area, and an evaluation of existing utilities and topography. The existing 6-plex will be demolished.

Request for Proposals No.1443N5010070901

SOLICITATION KEY POINTS

• Procurement is being conducted as a Total Small Business Set-Aside under NAICS code 236116.

• Period of Performance 410 calendar days after NTP

• One Firm-Fixed-Price contract will be awarded

• Source selection will be made using Best Value/Tradeoff method (see FAR 15.101-1)

CLIN STRUCTURE

Request for Proposals No.1443N5010070901

Key Solicitation Clauses

• Special Requirement 1 - Option for Additional Services

– States that optional CLINs may be exercised unilaterally up to 120 days after contract award

• Special Requirement 2 - Key Personnel

– PM, Superintendent, QC Manager and Safety Manager – no substitutions for first 120 days)

• Liquidated Damages ($1,576/day)

• Davis Bacon Wage Requirements apply – see Attachment 3

PROPOSAL INSTRUCTIONS

• Please read Section L thoroughly

• Email submissions to CO/CS on or before the due date

– Tony_Jasper@nps.gov, and CS_DSC_Proposal_Submission@nps.gov

• Make sure you verify receipt from NPS

• Pay attention to detailed page limitation requirements (10 page max technical approach, 4 page max schedule narrative)

• Offer Guarantee/Bid Bond is required – valid for 90 days

• Please submit your proposal as two separate pdf files – Volume 1:

Technical; Volume 2: Price

Request for Proposals No.1443N5010070901

PROPOSAL EVALUATION

Basis of Award

• Evaluation process is explained in Section M

• The Contracting Officer (CO) will obligate and award a contract to the offeror who submits a proposal that conforms to solicitation requirements; is fair and reasonable; and provides the best value to the government considering all evaluation factors combined

• The Government may accept other than the lowest priced proposal when the perceived benefits of a higher priced proposal merit the price differential.

• All evaluation factors other than price (Factors 1-5), when combined are approximately equally important to price.

PROPOSAL EVALUATION

Basis of Award (Continued)

• NPS will evaluate the total base plus all options pricing for award consideration.

• NPS reserves the right to award a contract without entering into discussions. If NPS chooses to enter into discussions, a competitive range will be established and the process described under FAR 15.306 will be followed.

Request for Proposals No.1443N5010070901

PROPOSAL EVALUATION (Technical Volume)

• Technical Volume must contain the following five sections pertaining to each evaluation factor. These are listed in descending order of importance

Factor 1 – Project Experience

Factor 2 – Technical Approach

Factor 3 – Schedule

Factor 4 – Key Personnel

Factor 5 – Past Performance

PROPOSAL EVALUATION

Volume 2 – Business and Price Proposal

• Signed SF1442

• Acknowledgement of Solicitation Amendments

• Completed Contract Price Schedule

• Bid Bond

• Section K: Reps & Certs

• General References

• Subcontracting Percentage Worksheet

Request for Proposals No.1443N5010070901

REMINDER

• Questions are due to the CO 14 days prior to bid deadline. It is the Offeror’s responsibility to take notes and submit questions in writing by the deadline.

• Submit questions only to Tony_Jasper@nps.gov

• Email proposals on or before XXXXXX, 2024.

• Solicitation and project documents are only changed with a formal amendment.

• Direct all inquiries to contracting until contract award. All inquiries will be redirected to contracting.

QUESTIONS?