A0003_Att_S101_Foundation_Plan_0003.pdf

PDF 491 KB Posted

Attached to
DETO 228872 - Replace Obsolete Housing with Multip Federal contract opportunity
Solicitation number
140P2025R0002
Issued by
Department of the Interior National Park Service National Office

About this file

This is a Foundation Plan (S101) structural drawing for Housing 109 at Devils Tower National Monument, prepared by Croft & Associates in Kennesaw, Georgia. The drawing details a 112-foot-long building foundation with seven distinct sections (labeled A through H), featuring a 4-inch concrete slab-on-ground reinforced with wire mesh, placed over 6 inches of WYDOT grading W aggregate base. The plan includes specific technical specifications such as footing depths at -3'-2", patio slab elevations, and instructions for the general contractor to coordinate foundation locations with plumbing and utilities, requiring foundation location change requests to be forwarded to the Contracting Officer for review and approval. The document is dated 02/28/2025, with design involvement from A. Brammer, M. Didier, and T. Paul, and includes a detailed foundation plan and a typical patio foundation plan for Option E - CLIN #10.

View the file

Other files for this federal contract opportunity

Other files attached to DETO 228872 - Replace Obsolete Housing with Multip, newest first.
File Type Posted
B09_A0004_Att_Solicitation_QandA_as_of_9-3-2025_0004.pdf PDF
Sol_140P2025R0002_Amd_0004.pdf PDF
B09_A0004_Att_01_91_14_Total_Building_Comm_8-27-25_0004.pdf PDF
A0003_Att_Electrical_Report_of_Contact_0003.pdf PDF
A0003_Att_Geotechnical_Report_0003.pdf PDF
A0003_Att_01_41_50_Special_Inspections_0003.pdf PDF
A0003_Att_Hydrant_Location_0003.pdf PDF
A0003_Att_StatementStructuralTestsSpecialInspections_0003.pdf PDF
Sol_140P2025R0002_Amd_0003.pdf PDF
A0003_Att_32_33_00_Site_Furnishings_0003.pdf PDF
A0003_Att_Hazmat_Report_0003.pdf PDF
A0003_Att_Hydrant_Flow_Chart_Graph_0003.pdf PDF
A0003_Att_Hydrant_Flow_Report_0003.pdf PDF
A0003_Att_01_91_14_Total_Building_Commissioning_0003.pdf PDF
A0003_Att_Hydrant_Test_Location_0003.pdf PDF
Sol_140P2025R0002_Amd_0002.pdf PDF
B09_A0002_Att_Proposal_Submission_Package_DETO_228872_0002.docx DOCX document
Sol_140P2025R0002_Amd_0001.pdf PDF
B09_A0001_Att_Prebid_Sign-in_Sheet_(6-17-25)_0001.pdf PDF
B09_A0001_Att_Prebid_Slides_(6-17-25)_0001.pdf PDF
B09_A0001_Att_Q-and-A_as_of_6-23-25_0001.pdf PDF
B08_Att_2_Drawings_(7-24-25).pdf PDF
B08_Att_8_Hazmat_Report_2023-06-06.pdf PDF
B08_Att_10_Hydrant_Flow_Test_1-29-21.pdf PDF
B08_Att_3_WD_WY20250003_(01-03-25).pdf PDF
B08_Att_7_Wildfire_Report_2023-06-06.pdf PDF
Sol_140P2025R0002.pdf PDF
B08_Att_1_Specs_(7-24-25).pdf PDF
B08_Att_5_Geotechnical_Report_2020_12_08.pdf PDF
B08_Att_9_Floodplain_Hydrologic_Hydraulic_8-15-24.pdf PDF
B08_140P2025R0002_(7-31-25).pdf PDF
B08_Att_4_Structural_Test_Special_Inspections_12-3-24.pdf PDF
B08_Att_6_Electrical_Report_of_Contact.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B

G

C D E FA H

14' - 0" 14' - 0" 14' - 0" 28' - 0" 14' - 0" 14' - 0" 14' - 0"

112' - 0"

SOG4 SOG46

S301

S301

S301

S301

S312

TYP

S312

TYP

S301

S301

T/FTG

-3' - 2"

T/FTG

-3' - 2"

T/FTG

-3' - 2"

T/FTG

-3' - 2"

T/FTG

-3' - 2"

T/FTG

-3' - 2"

T/FTG

-3' - 2"

4" SANITARY INVERT AT -2.89' BFF

(SEE CIVIL) (SEE 7/S301)

T/FTG

-3' - 2"

S301

____________ 6 S301

TYP ALONG

EXTERIOR WALL

OPTION E - CLIN #10

CONCRETE PATIOS

(SEE ARCH FOR

EXTENTS) (TYP)

S301

TYP ALONG EXTERIOR

WALL AT PATIOS

(TYP AT

PATIOS)

S301

____________TYP @ PATIOS

S301

S101

S301

____________TYP

S301

____________TYP

FOUNDATION PLAN NOTES:

5.

FOR TRENCHES ADJACENT TO FOUNDATIONS - SEE 1/S301

FOR PIPING PASSING UNDER WALL FOUNDATIONS - SEE 2/S301

PIPING PASSING UNDER FOOTING SHALL BE PLACED AND

INSPECTED BEFORE FOUNDATIONS ARE PREPARED.

GENERAL CONTRACTOR SHALL COORDINATE PLUMBING AND

UTILITIES LOCATIONS WITH FOUNDATIONS AS NEEDED.

ADDITIONALLY GC SHALL COORDINATE FOUNDATION

ELEVATIONS WITH PLUMBING AND UTILITIES AS NEEDED.

FORWARD ANY FOUNDATION LOCATION CHANGE REQUESTS TO

CONTRACTING OFFICER FOR REVIEW AND APPROVAL.

6.

7.

2.

4.

3.

8.

SUBMIT PROPOSED SLAB-ON-GROUND CONSTRUCTION OR

CONTRACTION JOINT LOCATIONS. FOR SCHEMATIC CJ PLAN -

SEE 1/S311

SEE ARCHITECTURAL DRAWINGS FOR:

• ALL SLOPED SLAB AREAS.

(MAINTAIN SLAB THICKNESS NOTED ON PLAN AS A MINIMUM IN

ALL AREAS).

• ALL DEPRESSED SLAB AND/OR RAISED SLAB AREAS.

(MAINTAIN SLAB THICKNESS NOTED ON PLAN AS A MINIMUM IN

ALL AREAS).

• ALL DIMENSIONS NOT SHOWN. VERIFY ALL DIMENSIONS SHOWN

IN STRUCTURAL DRAWINGS WITH ARCHITECTURAL DRAWINGS

AND REPORT ANY DISCREPANCIES OR DIMENSIONS NOT

SHOWN ON ARCHITECTURAL DRAWINGS FOR CLARIFICATION.

INSTALL THICKENED SLAB UNDER STAIR STRINGER - SEE 4/S331

INSTALL REINFORCING AT CONCRETE WALL CORNERS

AND INTERSECTIONS - SEE 4/S301

INSTALL REINFORCING AT OPENINGS IN CONCRETE WALLS -

SEE 7/S301

FOR CONSTRUCTION AND CONTRACTION JOINT REQUIREMENTS

FOR CONCRETE WALLS SEE 5/S301

9.

10. DENOTES STEP IN TOP OF SLAB - SEE 3/S312

1. 4" CONCRETE SLAB-ON-GROUND REINFORCED W/

WWR 6x6-W2.1xW2.1 @ 1-1/2" BELOW T/SLAB OVER

6" OF WYDOT GRADING W AGGREGATE BASE (SEE

ARCH FOR VAPOR RETARDER LOCATIONS).

T/SLAB = SEE CIVIL

REF T/SLAB = 0'-0"

SOG4

SOG5

S301

S301

S301

T/PATIO SLAB = -1/2"

T/PATIO SLAB = -2 1/8"

BUILDING FOOTINGS (SEE 1/S101)

-1 /2

S L

O P

E S

L A

B

AT EXT

AT BLDG

T/FTG

-3' - 2"

DATE:

TECH REVIEW:

DESIGNED: SUB SHEET NO. DRAWING NO.

PMIS/PKG NO.

SHEET

OF

LOCATION WITHIN PARK

TITLE OF SHEET

A/E FIRM

CROFT &

ASSOCIATES

KENNESAW,

GEORGIA

/1

/2

:3

:5

P M

A u to d e s k D o c s /2

-4

D E

T O

H o u s in g /0

-N

P S

D E

T O

-R -S

T R

U C

T .r v t

FOUNDATION PLAN

S101 02/28/2025

A. BRAMMER

M. DIDIER

T. PAUL

67 112

HOUSING 109

175429

228872

DEVILS TOWER NATIONAL MONUMENT

HOUSING

SCALE AS101

1 FOUNDATION PLAN

SCALE

4 0 4 128

SCALE OF FEET

A

B L D

G

SCALE BS101

2 TYP PATIO FOUNDATION PLAN - OPTION E - CLIN #10

SCALE

2 0 2 64

SCALE OF FEET

B

02/27/202502/28/2025

8 ________

08/20/202508/20/2025

File details come from the government source that posted it. Updated .