B08_Amendment_9_Attachment_3_SF1442_Submittal_Register_0009.pdf

PDF 204 KB Posted

Attached to
SEMO 218940, Develop Selma Interpretive Center at Federal contract opportunity
Solicitation number
140P2023R0022
Issued by
Department of the Interior National Park Service National Office

About this file

This submittal register outlines products and services required for the SEMO 218940 federal contract opportunity to rehabilitate the Selma Interpretive Center in Selma, Alabama. The National Park Service solicitation involves construction activities including concrete, masonry, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, equipment, furnishings, special construction, conveyance systems, mechanical, and electrical work. The submittal register specifies required submittals for each section such as product data, shop drawings, samples, quality control plans, operation and maintenance manuals, and closeout documents. Submittals are due prior to the preconstruction conference with responses and resubmittals to be provided within specified timeframes.

View the file

Other files for this federal contract opportunity

Other files attached to SEMO 218940, Develop Selma Interpretive Center at, newest first.
File Type Posted
Sol_140P2023R0022_Amd_0009.pdf PDF
B08_Amendment_9_Attachment_1_SF1442_Conformed_Solicitation_140P2023R0022_0009.pdf PDF
B08_RFP_140P2023R0022_Amendment_0009-6_20_23_0009.pdf PDF
B08_Amendment_9_Attachment_2__Section_J_Attachment_4_Contract_Price_Schedule_SEMO_218940_0009.xlsx XLSX spreadsheet
B08_Amendment_0008_Attachment_1_Pre-Bid_RFIs_and_NPS_Responses_6_15_23_0008.pdf PDF
B08_RFP_140P2023R0022_Amendment_0008-6_15_23_0008.pdf PDF
B08_Amendment_0008_Attachment_2_Pre-Bid_RFIs_and_NPS_Responses_6_15_23_Attachment_for_RFI_15_0008.pdf PDF
Sol_140P2023R0022_Amd_0008.pdf PDF
B08_RFP_140P2023R0022_Amendment_0007-6_7_23_0007.pdf PDF
B08_Amendment_7_Attachment_1_SF1442_Conformed_Solicitation_140P2023R0022_0007.pdf PDF
Sol_140P2023R0022_Amd_0007.pdf PDF
Sol_140P2023R0022_Amd_0006.pdf PDF
B08_Amendment_0006_Attachment_2_SPECIFICATIONS_ADDENDUM_1_6_6_23_0006.pdf PDF
B08_RFP_140P2023R0022_Amendment_0006-6_6_23_0006.pdf PDF
B08_Amendment_0006_Attachment_1_SEMO_218940_Late_RFIs_and_NPS_Responses_6_6_23_0006.pdf PDF
B08_RFP_140P2023R0022_Amendment_0005-5_30_23_0005.pdf PDF
Sol_140P2023R0022_Amd_0005.pdf PDF
B08_RFP_140P2023R0022_Amendment_0004-5_15_23_0004.pdf PDF
Sol_140P2023R0022_Amd_0004.pdf PDF
RFI_30_Attachment_0004.pdf PDF
B08_Amendment_0003_Attachment_1_Pre-Bid_RFI_and_NPS_Responses_Round_2_Received_by_5_10_23_0003.pdf PDF
B08_RFP_140P2023R0022_Amendment_0003-5_12_23_0003.pdf PDF
Sol_140P2023R0022_Amd_0003.pdf PDF
B08_Amendment_0002_Attachment_1_Pre-Bid_RFI_and_NPS_Responses_0002.pdf PDF
Sol_140P2023R0022_Amd_0002.pdf PDF
B08_RFP_140P2023R0022_Amendment_0002-4_27_23_0002.pdf PDF
B08_RFP_140P2023R0022_Amendment_0001-4_18_23_0001.pdf PDF
B08_Amendment_0001_Attachment_1_Pre-Bid_Site_Visit_Sign-In_0001.pdf PDF
Sol_140P2023R0022_Amd_0001.pdf PDF
B08_Amendment_0001_Attachment_2_Pre-Bid_Site_Visit_Powerpoint_Presentation_0001.pptx PPTX presentation
B08_Solicitation_140P2023R0022_SEMO_218940.pdf PDF
B08_Section_J_Attachment_1_Specifications_Volume_1.pdf PDF
B08_Section_J_Attachment_6_Proposal_Submission_Package_Forms.pdf PDF
B08_Section_J_Attachment_5_General_Decision_Number___AL20230080.pdf PDF
B08_Section_J_Attachment_4_Contract_Price_Schedule_SEMO_218940.xlsx XLSX spreadsheet
B08_Section_J_Attachment_3_Drawings.pdf PDF
B08_Section_J_Attachment_2_Specifications_Volume_2.pdf PDF
Sol_140P2023R0022.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REHABILITATE SELMA INTERPRETIVE CENTER

SELMA, ALABAMA

SEMO 218940

Section Number

Section Name Paragraph Submittal Type Detail

01 31 00 PROJECT MANAGEMENT AND COORDINATION 1.4.E. SUBMITTALS Provide items listed to Contracting Officer before Pre‐Construction Conference. If all documents have not been received one week prior to scheduled Pre‐Construction Conference date, conference may be cancelled, Notice to Proceed may not be issued, and Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued.

01 33 23 SUBMITTAL PROCEDURES 1.3.E. GENERAL SUBMITTAL PROCEDURES Approved Equals

01 35 91 HISTORIC PRESERVATION TREATMENT PROCEDURES 1.3.A. SUBMITTALS Historic Preservation Treatment Plan

01 40 00 QUALITY REQUIREMENTS 1.4.A. SUBMITTALS Quality Control Plan 01 40 00 QUALITY REQUIREMENTS 1.4.D. SUBMITTALS Test Reports 01 40 00 QUALITY REQUIREMENTS 1.4.E. SUBMITTALS Accessibility Inspection Report 01 40 00 QUALITY REQUIREMENTS 1.4.G. SUBMITTALS If Contractor Quality Control plan and Quality Control Daily Reports are not submitted as specified, Contracting Officer may retain payments until such time plan(s) is/are accepted and implemented, or may retain payments for work completed on days with no Quality Control Daily Reports.

01 57 19.11 INDOOR AIR QUALITY MANAGEMENT 1.4.B. SUBMITTALS Product Data 01 57 19.11 INDOOR AIR QUALITY MANAGEMENT 1.4.C. SUBMITTALS Inspection and Test Reports 01 57 23 UNDER‐AN‐ACRE POLLUTION PREVENTION 1.3.A. SUBMITTALS After contract award and before pre‐ construction conference, prepare and submit

01 67 00 PRODUCT REQUIREMENTS 1.3.A. SUBMITTALS Record Submittals as specified in – Sustainable Design Close‐Out Documentation, submit

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 1.4.H. SUBMITTALS LEED™ letter template signed by Contractor, tabulating total waste material, quantities diverted and means by which it is diverted.

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 1.4.K. SUBMITTALS Progress payment requirements

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 1.4.L. SUBMITTALS Closeout Submittals

01 77 00 CLOSEOUT PROCEDURES 1.3.A. CLOSEOUT SUBMITTALS A list of closeout requirements has been attached at the end of the Division 1 Specifications for your convenience. The intent is to provide an overall summary of requirements and not a comprehensive list. Terms and conditions of the contract require satisfaction of requirements of individual specification sections regardless of what is shown on the list. Submit the following before requesting final inspection

SEMO ‐ 218940

SUBMITTAL REGISTER

SEMO 218940

Section Number

Section Name Paragraph Submittal Type Detail

01 81 13 SUSTAINABLE DESIGN REQUIREMENTS FOR NON‐LEED

PROJECTS

1.3.A. FEDERAL SUSTAINABILITY

DOCUMENTATION SUBMITTALS

Most of Federal sustainability documentation submittals are aggregations of submittals already required in relevant technical specifications. They are mentioned here to ensure they are collected and organized together to efficiently document compliance with sustainability requirements.

01 81 13 SUSTAINABLE DESIGN REQUIREMENTS FOR NON‐LEED

PROJECTS

1.3.B. FEDERAL SUSTAINABILITY

DOCUMENTATION SUBMITTALS

Provide preliminary submittals to NPS indicating how the following Federal requirements will be met

01 91 14 TOTAL BUILDING COMMISSIONING 1.6.B. SUBMITTALS Certificates of readiness.

01 91 14 TOTAL BUILDING COMMISSIONING 1.6.C. SUBMITTALS Contractor’s Commissioning

Representative Qualifications.

01 91 14 TOTAL BUILDING COMMISSIONING 1.6.E. SUBMITTALS Pre functional checklists.

01 91 14 TOTAL BUILDING COMMISSIONING 1.6.F. SUBMITTALS Government’s project requirements.

01 91 14 TOTAL BUILDING COMMISSIONING 1.6.H. SUBMITTALS List of test instrumentation, equipment, and monitoring devices.

Include

01 91 14 TOTAL BUILDING COMMISSIONING 1.6.J. SUBMITTALS Closeout Documentation 03 05 00 CONCRETE 1.4.A. SUBMITTALS Shop Drawings 03 05 00 CONCRETE 1.4.B. SUBMITTALS Product Data 03 05 00 CONCRETE 1.4.C. SUBMITTALS Samples 03 05 00 CONCRETE 1.4.D. SUBMITTALS Project Information 03 08 13 CONCRETE TESTING AND EVALUATION ‐ OWNER 1.3.A. SUBMITTALS Product Data 03 08 13 CONCRETE TESTING AND EVALUATION ‐ OWNER 1.3.B. SUBMITTALS Project Information 03 15 23 EXPANSION JOINT SEALS IN CONCRETE 1.3.A. SUBMITTALS Product Data 03 15 23 EXPANSION JOINT SEALS IN CONCRETE 1.3.B. SUBMITTALS Project Information 03 15 23 EXPANSION JOINT SEALS IN CONCRETE 1.3.C. SUBMITTALS Contract Closeout Information 03 20 00 CONCRETE REINFORCING 1.3.A. SUBMITTALS Product Data 03 20 00 CONCRETE REINFORCING 1.3.B. SUBMITTALS Shop Drawings 03 20 00 CONCRETE REINFORCING 1.3.C. SUBMITTALS Project Information 03 31 00 CONCRETE MATERIALS AND PROPORTIONING 1.3.A. SUBMITTALS Product Data 03 31 10 CONCRETE MIXING, PLACING, JOINTING, AND CURING 1.3.A. SUBMITTALS Shop Drawings 03 31 10 CONCRETE MIXING, PLACING, JOINTING, AND CURING 1.3.B. SUBMITTALS Product Data 03 31 10 CONCRETE MIXING, PLACING, JOINTING, AND CURING 1.3.C. SUBMITTALS Project Information 04 05 10 MASONRY CLEANING 1.2.A. SUBMITTALS Product Data 04 05 10 MASONRY CLEANING 1.2.B. SUBMITTALS Project Information 04 05 16 MASONRY GROUTING 1.3.A. SUBMITTALS Product Data 04 05 23 MASONRY ACCESSORIES 1.3.A. SUBMITTALS Product Data 04 05 23 MASONRY ACCESSORIES 1.3.B. SUBMITTALS Samples 04 05 23 MASONRY ACCESSORIES 1.3.C. SUBMITTALS Project Information 04 21 13 BRICK MASONRY 1.3.A. SUBMITTALS Product Data 04 21 13 BRICK MASONRY 1.3.B. SUBMITTALS Samples 04 21 13 BRICK MASONRY 1.3.C. SUBMITTALS Project Information 04 21 13 BRICK MASONRY 1.3.D. SUBMITTALS Contract Closeout Information 04 21 14 EXTERIOR THIN BRICK ‐ MORTAR SET 1.3.A. SUBMITTALS Shop Drawings.

04 21 14 EXTERIOR THIN BRICK ‐ MORTAR SET 1.3.B. SUBMITTALS Product Data 04 21 14 EXTERIOR THIN BRICK ‐ MORTAR SET 1.3.C. SUBMITTALS Samples 04 21 14 EXTERIOR THIN BRICK ‐ MORTAR SET 1.3.D. SUBMITTALS Project Information 04 21 14 EXTERIOR THIN BRICK ‐ MORTAR SET 1.3.E. SUBMITTALS Contract Closeout Information 04 22 00 CONCRETE UNIT MASONRY (CMU) 1.3.A. SUBMITTALS Product Data 05 12 00 STRUCTURAL STEEL ‐ SHORT FORM 1.3.A. SUBMITTALS Product Data 05 12 00 STRUCTURAL STEEL ‐ SHORT FORM 1.3.B. SUBMITTALS Shop drawings 05 21 00 STEEL JOISTS ‐ SHORT FORM 1.3.A. SUBMITTALS Product Data 05 21 00 STEEL JOISTS ‐ SHORT FORM 1.3.B. SUBMITTALS Shop Drawings 05 21 00 STEEL JOISTS ‐ SHORT FORM 1.3.C. SUBMITTALS Project Information 05 31 23 METAL ROOF DECKING 1.3.A. SUBMITTALS Shop Drawings 05 31 23 METAL ROOF DECKING 1.3.B. SUBMITTALS Product Data 05 40 00 COLD‐FORMED METAL FRAMING 1.3.A. SUBMITTALS Product Data

SEMO ‐ 218940

SEMO 218940

Section Number

Section Name Paragraph Submittal Type Detail

05 40 00 COLD‐FORMED METAL FRAMING 1.3.B. SUBMITTALS Shop Drawings 05 40 00 COLD‐FORMED METAL FRAMING 1.3.C. SUBMITTALS Project Information 05 51 00 METAL STAIRS AND RAILINGS 1.3.A. SUBMITTALS Product Data 05 51 00 METAL STAIRS AND RAILINGS 1.3.B. SUBMITTALS Shop Drawings 05 51 00 METAL STAIRS AND RAILINGS 1.3.C. SUBMITTALS Project Information 06 10 00 ROUGH CARPENTRY 1.3.A. SUBMITTALS Product Data 06 10 00 ROUGH CARPENTRY 1.3.B. SUBMITTALS Project Information 06 11 10 WOOD FRAMING AND SHEATHING 1.3.A. SUBMITTALS Product Data 06 11 10 WOOD FRAMING AND SHEATHING 1.3.B. SUBMITTALS Project Information 06 11 10 WOOD FRAMING AND SHEATHING 1.3.C. SUBMITTALS Contract Closeout Information 06 16 43 GYPSUM SHEATHING 1.3.A. SUBMITTALS Product Data 06 18 00 GLUE LAMINATED CONSTRUCTION 1.3.A. SUBMITTALS Shop drawings 06 18 00 GLUE LAMINATED CONSTRUCTION 1.3.B. SUBMITTALS Product data 06 18 00 GLUE LAMINATED CONSTRUCTION 1.3.C. SUBMITTALS Contract Closeout Information

06 20 00 FINISH CARPENTRY 1.3.A. FOREST STEWARDSHIP COUNCIL

(FSC).SUBMITTALS

Shop Drawings

07 21 00 THERMAL INSULATION 1.3.A. SUBMITTALS Shop Drawings 07 21 00 THERMAL INSULATION 1.3.B. SUBMITTALS Product Data

07 21 31 SPRAYED POLYURETHANE FOAM (SPF) INSULATION ‐

MEDIUM DENSITY

1.3.A. SUBMITTALS Product Data

07 24 19 EXTERIOR INSULATION FINISH SYSTEM (EIFS) 1.3.A. SUBMITTALS Product Data 07 24 19 EXTERIOR INSULATION FINISH SYSTEM (EIFS) 1.3.B. SUBMITTALS Shop Drawings 07 24 19 EXTERIOR INSULATION FINISH SYSTEM (EIFS) 1.3.C. SUBMITTALS Samples 07 24 19 EXTERIOR INSULATION FINISH SYSTEM (EIFS) 1.3.D. SUBMITTALS Project Information 07 24 19 EXTERIOR INSULATION FINISH SYSTEM (EIFS) 1.3.E. SUBMITTALS Contract Closeout Information 07 54 25 FULLY ADHERED TPO ROOFING 1.3.A. SUBMITTALS Shop Drawings 07 54 25 FULLY ADHERED TPO ROOFING 1.3.B. SUBMITTALS Product Data 07 54 25 FULLY ADHERED TPO ROOFING 1.3.C. SUBMITTALS Samples 07 54 25 FULLY ADHERED TPO ROOFING 1.3.D. SUBMITTALS Project Information 07 54 25 FULLY ADHERED TPO ROOFING 1.3.E. SUBMITTALS Contract Closeout Information 07 62 00 SHEET METAL FLASHING AND TRIM 1.3.A. SUBMITTALS Product Data 07 62 00 SHEET METAL FLASHING AND TRIM 1.3.B. SUBMITTALS Shop Drawings 07 62 00 SHEET METAL FLASHING AND TRIM 1.3.C. SUBMITTALS Samples 07 62 00 SHEET METAL FLASHING AND TRIM 1.3.D. SUBMITTALS Contract Closeout Information 07 72 13 MANUFACTURED CURBS 1.3.A. SUBMITTALS Shop Drawings 07 72 13 MANUFACTURED CURBS 1.3.B. SUBMITTALS Product Data 07 72 13 MANUFACTURED CURBS 1.3.C. SUBMITTALS Project Information 07 84 00 FIRESTOPPING 1.3.A. SUBMITTALS Product Data 07 84 00 FIRESTOPPING 1.3.B. SUBMITTALS Project Information 07 84 00 FIRESTOPPING 1.3.C. SUBMITTALS Contract Closeout Information 07 92 13 EXTERIOR JOINT SEALANTS 1.3.A. SUBMITTALS Shop Drawings 07 92 13 EXTERIOR JOINT SEALANTS 1.3.B. SUBMITTALS Product Data 07 92 13 EXTERIOR JOINT SEALANTS 1.3.C. SUBMITTALS Samples 07 92 13 EXTERIOR JOINT SEALANTS 1.3.D. SUBMITTALS Contract Closeout Information 07 92 16 INTERIOR JOINT SEALANTS 1.3.A. SUBMITTALS Shop Drawings 07 92 16 INTERIOR JOINT SEALANTS 1.3.B. SUBMITTALS Product Data 07 92 16 INTERIOR JOINT SEALANTS 1.3.C. SUBMITTALS Samples 07 92 16 INTERIOR JOINT SEALANTS 1.3.D. SUBMITTALS Contract Closeout Information 08 03 83 WOOD WINDOW REPAIR 1.5.B. ACTION SUBMITTALS Shop Drawings 08 06 71 DOOR HARDWARE SCHEDULE 1.3.A. SUBMITTALS Product Data 08 06 71 DOOR HARDWARE SCHEDULE 1.3.B. SUBMITTALS Shop Drawings 08 06 71 DOOR HARDWARE SCHEDULE 1.3.C. SUBMITTALS Project Information 08 06 71 DOOR HARDWARE SCHEDULE 1.3.D. SUBMITTALS Contract Closeout Information 08 11 13 HOLLOW METAL (HM) DOORS AND FRAMES 1.3.A. SUBMITTALS Shop Drawings 08 11 13 HOLLOW METAL (HM) DOORS AND FRAMES 1.3.B. SUBMITTALS Product Data 08 14 16 FLUSH WOOD DOORS 1.3.A. SUBMITTALS Shop Drawings 08 14 16 FLUSH WOOD DOORS 1.3.B. SUBMITTALS Product Data 08 14 16 FLUSH WOOD DOORS 1.3.C. SUBMITTALS Samples 08 14 16 FLUSH WOOD DOORS 1.3.D. SUBMITTALS Contract Closeout Information 08 14 33 STILE AND RAIL WOOD DOORS 1.3.A. SUBMITTALS Shop Drawings 08 14 33 STILE AND RAIL WOOD DOORS 1.3.B. SUBMITTALS Product Data 08 14 33 STILE AND RAIL WOOD DOORS 1.3.C. SUBMITTALS Samples 08 31 16 ACCESS PANELS AND FRAMES 1.3.A. SUBMITTALS Product Data 08 33 23 OVERHEAD COILING DOORS (CD) 1.2.A. SUBMITTALS Product Data

SEMO ‐ 218940

SEMO 218940

Section Number

Section Name Paragraph Submittal Type Detail

08 33 23 OVERHEAD COILING DOORS (CD) 1.2.B. SUBMITTALS Shop Drawings 08 33 23 OVERHEAD COILING DOORS (CD) 1.2.C. SUBMITTALS Project Information 08 33 23 OVERHEAD COILING DOORS (CD) 1.2.D. SUBMITTALS Contract Closeout Information 08 51 10 ALUMINUM WINDOWS 1.4.A. SUBMITTALS Shop Drawings 08 51 10 ALUMINUM WINDOWS 1.4.B. SUBMITTALS Product Data 08 51 10 ALUMINUM WINDOWS 1.4.C. SUBMITTALS Samples 08 51 10 ALUMINUM WINDOWS 1.4.D. SUBMITTALS Project Information 08 51 10 ALUMINUM WINDOWS 1.4.E. SUBMITTALS Contract Closeout Information 08 52 13 METAL‐CLAD WOOD WINDOWS 1.3.A. SUBMITTALS Shop Drawings 08 52 13 METAL‐CLAD WOOD WINDOWS 1.3.B. SUBMITTALS Product Data 08 52 13 METAL‐CLAD WOOD WINDOWS 1.3.C. SUBMITTALS Samples 08 52 13 METAL‐CLAD WOOD WINDOWS 1.3.D. SUBMITTALS Project Information 08 52 13 METAL‐CLAD WOOD WINDOWS 1.3.E. SUBMITTALS Contract Closeout Information 08 71 00 DOOR HARDWARE 1.3.A. SUBMITTALS Product Data 08 71 00 DOOR HARDWARE 1.3.B. SUBMITTALS Shop Drawings 08 71 00 DOOR HARDWARE 1.3.C. SUBMITTALS Project Information 08 71 00 DOOR HARDWARE 1.3.D. SUBMITTALS Contract Closeout Information 08 71 13 AUTOMATIC DOOR OPERATORS 1.3.A. SUBMITTALS Shop Drawings 08 71 13 AUTOMATIC DOOR OPERATORS 1.3.B. SUBMITTALS Product Data 08 71 13 AUTOMATIC DOOR OPERATORS 1.3.C. SUBMITTALS Project Information 08 71 13 AUTOMATIC DOOR OPERATORS 1.3.D. SUBMITTALS Contract Closeout Information 08 81 23 EXTERIOR GLASS GLAZING 1.3.A. SUBMITTALS Product Data 08 81 23 EXTERIOR GLASS GLAZING 1.3.B. SUBMITTALS Samples 08 81 23 EXTERIOR GLASS GLAZING 1.3.C. SUBMITTALS Contract Closeout Information 08 81 26 INTERIOR GLASS GLAZING 1.3.A. SUBMITTALS Product Data 09 22 16 NON‐STRUCTURAL METAL FRAMING 1.3.A. SUBMITTALS Shop Drawings 09 22 16 NON‐STRUCTURAL METAL FRAMING 1.3.B. SUBMITTALS Product Data 09 22 36 METAL LATH 1.3.A. SUBMITTALS Product Data 09 22 36 METAL LATH 1.3.B. SUBMITTALS Samples 09 29 00 GYPSUM BOARD 1.3.A. SUBMITTALS Product Data 09 30 00 TILING 1.3.A. SUBMITTALS Product Data 09 30 00 TILING 1.3.B. SUBMITTALS Shop Drawings 09 30 00 TILING 1.3.C. SUBMITTALS Samples 09 30 00 TILING 1.3.D. SUBMITTALS Project Information 09 30 00 TILING 1.3.E. SUBMITTALS Contract Closeout Information 09 51 00 ACOUSTICAL CEILINGS (ACT) 1.3.A. SUBMITTALS Product Data 09 51 00 ACOUSTICAL CEILINGS (ACT) 1.3.B. SUBMITTALS Samples 09 51 00 ACOUSTICAL CEILINGS (ACT) 1.3.C. SUBMITTALS Contract Closeout Information 09 65 13 RESILIENT BASE (RB) 1.3.A. SUBMITTALS Product Data 09 65 13 RESILIENT BASE (RB) 1.3.B. SUBMITTALS Samples 09 65 13 RESILIENT BASE (RB) 1.3.C. SUBMITTALS Contract Closeout Information 09 65 19 RESILIENT TILE FLOORING (RT) 1.3.A. SUBMITTALS Product Data 09 65 19 RESILIENT TILE FLOORING (RT) 1.3.B. SUBMITTALS Samples 09 65 19 RESILIENT TILE FLOORING (RT) 1.3.C. SUBMITTALS Contract Closeout Information 09 67 81 CONCRETE FLOOR SEALER (CFS) 1.3.A. SUBMITTALS Product Data 09 67 81 CONCRETE FLOOR SEALER (CFS) 1.3.B. SUBMITTALS Contract Closeout Information 09 68 13 TILE CARPETING (CPT) 1.3.A. SUBMITTALS Product Data 09 68 13 TILE CARPETING (CPT) 1.3.B. SUBMITTALS Samples 09 68 13 TILE CARPETING (CPT) 1.3.C. SUBMITTALS Contract Closeout Information 09 77 61 FIBERGLASS REINFORCED PLASTIC (FRP) PANELS 1.3.A. SUBMITTALS Product Data 09 77 61 FIBERGLASS REINFORCED PLASTIC (FRP) PANELS 1.3.B. SUBMITTALS Samples 09 77 61 FIBERGLASS REINFORCED PLASTIC (FRP) PANELS 1.3.C. SUBMITTALS Contract Closeout Information 09 91 13 EXTERIOR PAINTING 1.3.A. SUBMITTALS Product Data 09 91 13 EXTERIOR PAINTING 1.3.B. SUBMITTALS Samples 09 91 13 EXTERIOR PAINTING 1.3.C. SUBMITTALS Contract Closeout Information 09 91 23 INTERIOR PAINTING 1.3.A. SUBMITTALS Product Data 09 91 23 INTERIOR PAINTING 1.3.B. SUBMITTALS Samples 09 91 23 INTERIOR PAINTING 1.3.C. SUBMITTALS Contract Closeout Information 10 14 00 SIGNAGE 1.3.A. SUBMITTALS Product Data 10 14 00 SIGNAGE 1.3.B. SUBMITTALS Samples 10 21 14 SOLID POLYMER HDPE TOILET PARTITIONS 1.3.A. SUBMITTALS Shop Drawings 10 21 14 SOLID POLYMER HDPE TOILET PARTITIONS 1.3.B. SUBMITTALS Product Data 10 21 14 SOLID POLYMER HDPE TOILET PARTITIONS 1.3.C. SUBMITTALS Samples 10 28 13 TOILET ACCESSORIES 1.3.A. SUBMITTALS Product Data

SEMO ‐ 218940

SEMO 218940

Section Number

Section Name Paragraph Submittal Type Detail

10 28 13 TOILET ACCESSORIES 1.3.B. SUBMITTALS Contract Closeout Information 10 44 00 FIRE PROTECTION SPECIALTIES 1.3.A. SUBMITTALS Product Data 10 44 00 FIRE PROTECTION SPECIALTIES 1.3.B. SUBMITTALS Contract Closeout Information 11 52 13 PROJECTION SCREENS 1.3.A. SUBMITTALS Shop Drawings 11 52 13 PROJECTION SCREENS 1.3.B. SUBMITTALS Product Data 11 52 13 PROJECTION SCREENS 1.3.C. SUBMITTALS Contract Closeout Information 12 21 13 HORIZONTAL ALUMINUM BLINDS 1.3.A. SUBMITTALS Product Data 12 21 13 HORIZONTAL ALUMINUM BLINDS 1.3.B. SUBMITTALS Samples 12 21 13 HORIZONTAL ALUMINUM BLINDS 1.3.C. SUBMITTALS Contract Closeout Information 12 32 00 MANUFACTURED CASEWORK 1.4.A. SUBMITTALS Shop Drawings 12 32 00 MANUFACTURED CASEWORK 1.4.B. SUBMITTALS Product Data 12 32 00 MANUFACTURED CASEWORK 1.4.C. SUBMITTALS Contract Closeout Information 12 36 63 SOLID SURFACE FABRICATIONS (SSF) 1.3.A. SUBMITTALS Shop Drawings 12 36 63 SOLID SURFACE FABRICATIONS (SSF) 1.3.B. SUBMITTALS Product Data 12 36 63 SOLID SURFACE FABRICATIONS (SSF) 1.3.C. SUBMITTALS Samples 12 36 63 SOLID SURFACE FABRICATIONS (SSF) 1.3.D. SUBMITTALS Project Information 12 36 63 SOLID SURFACE FABRICATIONS (SSF) 1.3.E. SUBMITTALS Contract Closeout Information 14 24 23 HYDRAULIC ELEVATORS ‐ PASSENGER 1.3.A. SUBMITTALS Shop Drawings 14 24 23 HYDRAULIC ELEVATORS ‐ PASSENGER 1.3.B. SUBMITTALS Product Data 14 24 23 HYDRAULIC ELEVATORS ‐ PASSENGER 1.3.C. SUBMITTALS Samples 14 24 23 HYDRAULIC ELEVATORS ‐ PASSENGER 1.3.D. SUBMITTALS Contract Closeout Information 21 10 00 FIRE PROTECTION SYSTEMS 1.4.A. SUBMITTALS Working Plans 21 10 00 FIRE PROTECTION SYSTEMS 1.4.B. SUBMITTALS Product Data 21 10 00 FIRE PROTECTION SYSTEMS 1.4.C. SUBMITTALS Certifications 21 10 00 FIRE PROTECTION SYSTEMS 1.4.D. SUBMITTALS Contract Closeout Information 22 10 16 PLUMBING PIPING 1.3.A. SUBMITTALS Product Data 22 10 16 PLUMBING PIPING 1.3.B. SUBMITTALS Contract Closeout Information 22 11 23 PLUMBING PUMPS 1.3.A. SUBMITTALS Product Data 22 11 23 PLUMBING PUMPS 1.3.B. SUBMITTALS Contract Closeout Information 22 33 00 DOMESTIC WATER HEATERS 1.3.A. SUBMITTALS Product Data 22 33 00 DOMESTIC WATER HEATERS 1.3.B. SUBMITTALS Contract Closeout Information 22 42 00 PLUMBING FIXTURES 1.3.A. SUBMITTALS Product Data 22 42 00 PLUMBING FIXTURES 1.3.B. SUBMITTALS Contract Closeout Information 23 05 53 MECHANICAL IDENTIFICATION SYSTEMS 1.3.A. SUBMITTALS Product Data 23 05 53 MECHANICAL IDENTIFICATION SYSTEMS 1.3.B. SUBMITTALS Contract Closeout Information 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC 1.7.A. SUBMITTALS Project Information 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC 1.7.B. SUBMITTALS Contract Closeout Information 23 07 00 PIPE, DUCT AND EQUIPMENT INSULATION 1.3.A. SUBMITTALS Product Data 23 31 13 AIR DISTRIBUTION SYSTEM 1.3.A. SUBMITTALS Shop Drawings 23 31 13 AIR DISTRIBUTION SYSTEM 1.3.B. SUBMITTALS Product Data 23 31 13 AIR DISTRIBUTION SYSTEM 1.3.C. SUBMITTALS Contract Closeout Information 23 35 00 EXHAUST AND VENTILATING FANS 1.3.A. SUBMITTALS Product Data 23 35 00 EXHAUST AND VENTILATING FANS 1.3.B. SUBMITTALS Contract Closeout Information 23 82 43 ELECTRIC HEATERS 1.2.A. SUBMITTALS Product Data 23 82 43 ELECTRIC HEATERS 1.2.B. SUBMITTALS Contract Closeout Information 31 22 19 TOPSOILING AND FINISHED GRADING 1.3.A. SUBMITTALS Project Data 31 22 19 TOPSOILING AND FINISHED GRADING 1.3.B. SUBMITTALS Project Information 31 23 00 BUILDING EXCAVATION, FILLING, AND BACKFILLING 1.4.A. SUBMITTALS Product Data 31 25 00 EROSION AND SEDIMENTATION CONTROLS 1.3.A. SUBMITTALS Section 01 33 00 ‐ Submittal

Procedures.

31 25 00 EROSION AND SEDIMENTATION CONTROLS 1.3.B. SUBMITTALS Product Data 31 25 00 EROSION AND SEDIMENTATION CONTROLS 1.3.C. SUBMITTALS Samples 31 25 00 EROSION AND SEDIMENTATION CONTROLS 1.3.D. SUBMITTALS Project Information 31 31 16 TERMITE CONTROL 1.4.A. SUBMITTALS Section 01 33 00 ‐ Submittal

Procedures.

31 31 16 TERMITE CONTROL 1.4.B. SUBMITTALS Product Data 31 31 16 TERMITE CONTROL 1.4.C. SUBMITTALS Project Information 31 31 16 TERMITE CONTROL 1.4.D. SUBMITTALS Contract Closeout Information 32 13 13 CONCRETE PAVING 1.4.B. SUBMITTALS Product Data 32 13 13 CONCRETE PAVING 1.4.D. SUBMITTALS Design Data 32 14 40 STONE PAVING 1.3.C. SUBMITTALS Samples 32 31 18 PEDESTRIAN FENCE AND GATES 1.3.A. SUBMITTAL Shop Drawings 32 31 18 PEDESTRIAN FENCE AND GATES 1.3.B. SUBMITTAL Product Data 32 31 18 PEDESTRIAN FENCE AND GATES 1.3.C. SUBMITTAL Samples

SEMO ‐ 218940

SEMO 218940

Section Number

Section Name Paragraph Submittal Type Detail

32 31 18 PEDESTRIAN FENCE AND GATES 1.3.D. SUBMITTAL Project Information 32 31 18 PEDESTRIAN FENCE AND GATES 1.3.E. SUBMITTAL Contract Closeout Information 32 31 38 LOUVERED SCREENWALL AND GATES 1.3.A. SUBMITTAL Shop Drawings 32 31 38 LOUVERED SCREENWALL AND GATES 1.3.B. SUBMITTAL Product Data 32 31 38 LOUVERED SCREENWALL AND GATES 1.3.C. SUBMITTAL Samples 32 31 38 LOUVERED SCREENWALL AND GATES 1.3.D. SUBMITTAL Project Information 32 31 38 LOUVERED SCREENWALL AND GATES 1.3.E. SUBMITTAL Contract Closeout Information 32 33 00 SITE FURNISHINGS 1.3.A. SUBMITTALS Product Data 32 33 00 SITE FURNISHINGS 1.3.B. SUBMITTALS Project Information 32 33 00 SITE FURNISHINGS 1.3.C. SUBMITTALS Contract Closeout Information 32 84 00 PLANTING IRRIGATION 1.4.B. SUBMITTALS Shop Drawings 32 84 00 PLANTING IRRIGATION 1.5.B. CLOSEOUT SUBMITTALS Operation and Maintenance Data

32 93 00 PLANTS 1.4.A. SUBMITTALS Section 01 33 00 for submittals.

32 93 00 PLANTS 1.4.C. SUBMITTALS Submit minimum 10 OZ (280 G) sample of topsoil proposed.

Forward sample to testing laboratory in sealed containers to prevent contamination.

33 10 10 OUTSIDE UTILITIES 1.3.A. SUBMITTALS Contract Closeout Information 33 46 00 FOUNDATION AND UNDERSLAB DRAINAGE SYSTEM 1.4.A. SUBMITTALS Product Data

01 57 19.11 INDOOR AIR QUALITY MANAGEMENT 1.4.A. SUBMITTALS Indoor Air Quality (IAQ) Management Plan

After award and before Pre‐construction conference, prepare and submit IAQ Management Plan, including

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 1.4.A. SUBMITTALS Waste Management Plan After award of contract and prior to scheduled Pre‐Construction Conference, Contractor shall submit a draft Waste Management Plan to Contracting Officer for approval. Submit 3 copies of plan. Revise and resubmit Plan as required by Contracting Officer. Approval of Contractor’s Plan will not relieve Contractor of responsibility for compliance with applicable environmental regulations.

01 32 16 CONSTRUCTION SCHEDULE 1.3.B. SUBMITTALS Schedule of Values After contract award and before Pre‐Construction conference, submit schedule of dollar values based on Contract Price Schedule.

01 32 16 CONSTRUCTION SCHEDULE 1.3.C. SUBMITTALS Construction Baseline Schedule After contract award and before Pre‐Construction conference, submit two paper copies of baseline schedule, large enough to show entire schedule for entire construction period. Utilize Schedule of Values in preparation of Construction Baseline Schedule.

01 33 23 SUBMITTAL PROCEDURES 1.3.D. GENERAL SUBMITTAL PROCEDURES Processing Time Allow time for submittal review, including time for re‐submittals, as follows. Time for review shall commence when e‐mail notification is received by Contracting Officer (or designee) indicating submittal has been posted on NPS management software website and is ready for review. When Contracting Officer has completed review, e‐mail notification will be sent to Contractor indicating submittal has been processed. No extension of Contract Time will be authorized because of failure to transmit submittals in advance of Work to permit processing, including re‐submittals.

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 1.4.C. SUBMITTALS Waste Reduction Calculations Before request for Substantial Completion, submit three copies of calculated end‐of‐Project rates for salvage, recycling, and disposal as a percentage of total waste generated by the Work.

31 05 13 SOILS FOR EARTHWORK 1.3.D. SUBMITTALS Manufacturer's Certificate Certify Products meet or exceed specified requirements.

32 91 19 LANDSCAPE GRADING 1.4.D. SUBMITTALS Manufacturer's Certificate Certify Products meet or exceed specified requirements.

31 05 13 SOILS FOR EARTHWORK 1.4.B. SUSTAINABLE DESIGN SUBMITTALS Manufacturer's Certificate Certify products meet or exceed specified sustainable design requirements.

31 10 00 SITE CLEARING 1.4.B. SUSTAINABLE DESIGN SUBMITTALS Manufacturer's Certificate Certify products meet or exceed specified sustainable design requirements.

31 25 00 EROSION AND SEDIMENTATION CONTROLS 1.4.A. SUSTAINABLE DESIGN SUBMITTALS Manufacturer's Certificate Certify products meet or exceed specified sustainable design requirements.

32 14 16 BRICK UNIT PAVING 1.5.B. SUSTAINABLE DESIGN SUBMITTALS Manufacturer's Certificate Certify products meet or exceed specified sustainable design requirements.

32 91 19 LANDSCAPE GRADING 1.5.B. SUSTAINABLE DESIGN SUBMITTALS Manufacturer's Certificate Certify products meet or exceed specified sustainable design requirements.

01 33 23 SUBMITTAL PROCEDURES 2.1.A. ACTION SUBMITTALS Product Data Collect information into a single submittal for each element of construction and type of product or equipment.

01 33 23 SUBMITTAL PROCEDURES 2.2.B. INFORMATIONAL SUBMITTALS Coordination Drawings Comply with requirements specified in Section 01 31 00 "Project Management and Coordination."

01 33 23 SUBMITTAL PROCEDURES 2.2.C. INFORMATIONAL SUBMITTALS Contractors Construction Schedule Comply with requirements specified in Section 01 32 16 "Construction Schedule."

01 33 23 SUBMITTAL PROCEDURES 2.2.E. INFORMATIONAL SUBMITTALS Schedule of Values Comply with requirements specified in Section 01 32 16 "Construction Schedule."

01 33 23 SUBMITTAL PROCEDURES 2.2.D. INFORMATIONAL SUBMITTALS Accident Prevention Plan Comply with requirements specified in Section 01 35 23 "Safety Requirements."

01 33 23 SUBMITTAL PROCEDURES 2.2.G. INFORMATIONAL SUBMITTALS Quality Control Plan Comply with requirements specified in Section 01 40 00 "Quality Requirements."

01 33 23 SUBMITTAL PROCEDURES 2.2.I. INFORMATIONAL SUBMITTALS Indoor Air Quality Management Plan Comply with requirements specified in Section 01 57 19.11 "Indoor Air Quality Management."

01 33 23 SUBMITTAL PROCEDURES 2.2.H. INFORMATIONAL SUBMITTALS Storm Water Pollution Prevention Plan

Comply with requirements specified in Section 01 57 23 "Temporary Storm Water Pollution Prevention" and storm water permit requirements identified in Section 01 31 00 "Project Management and Coordination."

SEMO ‐ 218940

SEMO 218940

Section Number

Section Name Paragraph Submittal Type Detail

01 33 23 SUBMITTAL PROCEDURES 2.2.F. INFORMATIONAL SUBMITTALS Waste Recycling Plan Comply with requirements specified in Section 01 74 19 "Construction Waste Management and Disposal."

23 05 29 PENETRATIONS AND SUPPORTS 1.2.B. QUALITY ASSURANCE Product Data Concrete Anchors: Document Manufacturer approval or listing for cracked concrete application 01 32 16 CONSTRUCTION SCHEDULE 1.3.D. SUBMITTALS Critical Path Method (CPM) Reports Concurrent with CPM schedule, submit three paper copies of the following computer‐generated reports. For each activity, include activity number, activity description, cost and resource loading, original duration, remaining duration, early start date, early finish date, late start date, late finish date, and total float in calendar days.

01 33 23 SUBMITTAL PROCEDURES 2.1.D. ACTION SUBMITTALS Construction Materials Contractor is encouraged to submit products made out of recycled or environmentally responsible material. Every effort will be made by National Park Service to approve these materials.

01 33 23 SUBMITTAL PROCEDURES 1.3.B. GENERAL SUBMITTAL PROCEDURES Coordination Coordinate preparation and processing of submittals with performance of construction activities. Review for legibility, accuracy, completeness, and compliance with Contract Documents.

01 35 13.22 ARCHEOLOGICAL PROTECTION 1.3.A. SUBMITTALS Daily Work Schedule Detail construction work in archeologically sensitive areas. Submit to Contracting Officer (CO) 30 days before start of ground disturbing site work.

01 91 14 TOTAL BUILDING COMMISSIONING 1.6.I. SUBMITTALS Deficiency Report and Resolution Record

Document items of non‐compliance in materials, installation or operation. Document results from start‐up/pre‐functional checklists, functional performance testing, and short‐term diagnostic monitoring. Include details of components or systems found to be non‐compliant with drawings and specifications. Identify adjustments and alterations required to correct system operation and identify who is responsible for making corrective changes.

01 32 16 CONSTRUCTION SCHEDULE 1.3.F. SUBMITTALS Construction Schedule Revisions and Time Impact Analysis

For each Construction Schedule revision, submit two paper copies of a Time Impact Analysis. Incorporate a Fragmentary Network (Fragnet) into currently accepted Construction Schedule that demonstrating how Contractor proposes to incorporate a modification, change, delay, or Contractor request.

08 03 83 WOOD WINDOW REPAIR 1.5.C. ACTION SUBMITTALS Samples for Initial Selection For each type of exposed wood and finish.

08 03 83 WOOD WINDOW REPAIR 1.5.A. ACTION SUBMITTALS Product Data For each type of product.

01 40 00 QUALITY REQUIREMENTS 1.4.H. SUBMITTALS Permits, Licenses, and Certificates For National Park Service (NPS) records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of work.

01 40 00 QUALITY REQUIREMENTS 1.4.B. SUBMITTALS Qualification Data For testing agencies specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include proof of qualifications in form of a recent report on inspection of testing agency by a recognized authority.

23 81 29 VARIABLE REFRIGERANT FLOW HVAC SYSTEMS 1.3.B. ACTION SUBMITTALS Shop Drawings For VRF HVAC Systems

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 1.4.I. SUBMITTALS Qualification Data For Waste Management Coordinator and refrigerant recovery technician.

01 33 23 SUBMITTAL PROCEDURES 1.3.I. GENERAL SUBMITTAL PROCEDURES Distribution Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, and others as necessary for performance of construction activities.

01 33 23 SUBMITTAL PROCEDURES 1.3.F. GENERAL SUBMITTAL PROCEDURES Electronic Submittals Identify and incorporate information in each electronic submittal file as follows

01 35 91 HISTORIC PRESERVATION TREATMENT PROCEDURES 1.3.B. SUBMITTALS Alternative Methods and Materials If alternative methods and materials to those indicated are proposed for any phase of work, provide a written description including evidence of successful use on other, comparable projects, and program of testing to demonstrate effectiveness for use on this Project.

01 35 91 HISTORIC PRESERVATION TREATMENT PROCEDURES 1.3.C. SUBMITTALS Photographs or Videotape In accordance with Section 01 32 33 "Photographic Documentation," show existing conditions of adjoining construction and site improvements including finish surfaces that might be misconstrued as damage caused by historic treatment operations. Submit before work begins.

32 93 00 PLANTS 1.5.A. CLOSEOUT SUBMITTALS Operation and Maintenance Data Include pruning objectives, types and methods; application frequency, and recommended coverage of fertilizer.

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 1.4.F. SUBMITTALS Recycling and Processing Facility Records

Indicate receipt and acceptance of recyclable waste by recycling and processing facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 1.4.D. SUBMITTALS Records of Donations Indicate receipt and acceptance of salvageable waste donated to individuals and organizations. Indicate whether organization is tax exempt.

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 1.4.E. SUBMITTALS Records of Sales Indicate receipt and acceptance of salvageable waste sold to individuals and organizations. Indicate whether organization is tax exempt.

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 1.4.G. SUBMITTALS Landfill and Incinerator Disposal Records

Indicate receipt and acceptance of waste by landfills and incinerator facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.

32 13 13 CONCRETE PAVING 1.4.E. SUBMITTALS Source Quality Control Submittals Indicate results of shop tests and inspections.

01 33 23 SUBMITTAL PROCEDURES 1.3.H. GENERAL SUBMITTAL PROCEDURES Re‐submittals Make re‐submittals using same process used with initial submittal.

01 32 16 CONSTRUCTION SCHEDULE 1.3.E. SUBMITTALS Construction Schedule Updates On or before 7th day preceding progress payment request date, submit estimates of percent completion of each schedule activity and necessary supporting data. Provide two paper copies.

01 31 00 PROJECT MANAGEMENT AND COORDINATION 1.4.B. SUBMITTALS Coordination Drawing Organization Organize coordination drawings as follows

23 05 29 PENETRATIONS AND SUPPORTS 1.2.B. QUALITY ASSURANCE Product Data Pipe Hangers: Identify each hanger according to systems, pipe sizes, and orientations on which it will be used.

01 33 23 SUBMITTAL PROCEDURES 2.2.A. INFORMATIONAL SUBMITTALS General Prepare and submit Informational Submittals required by individual Specification Sections.

SEMO ‐ 218940

SEMO 218940

Section Number

Section Name Paragraph Submittal Type Detail

01 33 23 SUBMITTAL PROCEDURES 1.3.A. GENERAL SUBMITTAL PROCEDURES General Prepare and submit submittals required by individual Specification Sections and in some cases as requested in drawings.

Types of submittals are indicated in individual specific sections.

01 31 00 PROJECT MANAGEMENT AND COORDINATION 1.4.C. SUBMITTALS Coordination Digital Data Files Prepare coordination digital data files according to 01 31 00 PROJECT MANAGEMENT AND COORDINATION 1.4.A. SUBMITTALS Coordination Drawings Prepare Coordination Drawings if limited space availability necessitates maximum utilization of space for efficient installation of different components or if coordination is required for installation of products and materials fabricated by separate entities.

01 33 23 SUBMITTAL PROCEDURES 2.1.B. ACTION SUBMITTALS Shop Drawings Prepare Project‐specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

01 33 23 SUBMITTAL PROCEDURES 2.2.T. INFORMATIONAL SUBMITTALS Compatibility Test Reports Prepare reports written by a qualified testing agency, on testing agency’s standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion.

01 33 23 SUBMITTAL PROCEDURES 2.2.U. INFORMATIONAL SUBMITTALS Field Test Reports Prepare reports written by a qualified testing agency, on testing agency’s standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements in Contract Documents.

01 33 23 SUBMITTAL PROCEDURES 2.2.S. INFORMATIONAL SUBMITTALS Preconstruction Test Reports Prepare reports written by a qualified testing agency, on testing agency’s standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in Contract Documents.

01 33 23 SUBMITTAL PROCEDURES 2.2.P. INFORMATIONAL SUBMITTALS Material Test Reports Prepare reports written by a qualified testing agency, on testing agency’s standard form, indicating and interpreting test results of material for compliance with requirements in Contract Documents.

01 33 23 SUBMITTAL PROCEDURES 2.2.Z. INFORMATIONAL SUBMITTALS Permit Compliance Products Prepare required information for compliance with permit provisions. Products include written notification of project startup, suspension, and completion of work; photo documentation of site conditions; reports; and drawings.

01 33 23 SUBMITTAL PROCEDURES 2.2.W. INFORMATIONAL SUBMITTALS Design Data Prepare written and graphic information, including 01 33 23 SUBMITTAL PROCEDURES 2.2.V. INFORMATIONAL SUBMITTALS Maintenance Data Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment. Comply with requirements specified in Section 01 78 23 "Operation and Maintenance Data."

01 33 23 SUBMITTAL PROCEDURES 2.2.K. INFORMATIONAL SUBMITTALS Welding Certificates Prepare written certification that welding procedures and personnel comply with Contract Documents. Submit record of

Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR) on American Welding Society (AWS) forms. Include names of firms and personnel certified.

01 33 23 SUBMITTAL PROCEDURES 2.2.R. INFORMATIONAL SUBMITTALS Research/Evaluation Reports Prepare written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project.

01 33 23 SUBMITTAL PROCEDURES 2.2.J. INFORMATIONAL SUBMITTALS Qualification Data Prepare written information demonstrating capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified.

01 33 23 SUBMITTAL PROCEDURES 2.2.Y. INFORMATIONAL SUBMITTALS Manufacturer’s Field Reports Prepare written information documenting factory‐authorized service representative’s tests and inspections. As applicable, include

01 33 23 SUBMITTAL PROCEDURES 2.2.X. INFORMATIONAL SUBMITTALS Manufacturer’s Instructions Prepare written or published information documenting manufacturer’s recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.

01 33 23 SUBMITTAL PROCEDURES 2.2.Q. INFORMATIONAL SUBMITTALS Product Test Reports Prepare written reports indicating current product produced by manufacturer complies with requirements in Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.

01 33 23 SUBMITTAL PROCEDURES 2.2.L. INFORMATIONAL SUBMITTALS Installer Certificates Prepare written statements on manufacturer’s letterhead certifying Installer complies with Contract Documents and, where required, is authorized by manufacturer for this specific Project.

01 33 23 SUBMITTAL PROCEDURES 2.2.M. INFORMATIONAL SUBMITTALS Manufacturer Certificates Prepare written statements on manufacturer’s letterhead certifying manufacturer complies with Contract Documents.

Include evidence of manufacturing experience where required.

01 33 23 SUBMITTAL PROCEDURES 2.2.O. INFORMATIONAL SUBMITTALS Material Certificates Prepare written statements on manufacturer’s letterhead certifying material complies with Contract Documents.

01 33 23 SUBMITTAL PROCEDURES 2.2.N. INFORMATIONAL SUBMITTALS Product Certificates Prepare written statements on manufacturer’s letterhead certifying product complies with Contract Documents.

32 84 00 PLANTING IRRIGATION 1.5.A. CLOSEOUT SUBMITTALS Project Record Documents Record actual locations of concealed components, piping system, and conduit.

31 05 13 SOILS FOR EARTHWORK 1.3.A. SUBMITTALS Section 01 33 00 ‐ Submittal

Procedures Requirements for submittals.

31 10 00 SITE CLEARING 1.3.A. SUBMITTALS Section 01 33 00 ‐ Submittal Procedures

Requirements for submittals.

32 13 13 CONCRETE PAVING 1.4.A. SUBMITTALS Section 01 33 00 ‐ Submittal Procedures

Requirements for submittals.

32 14 16 BRICK UNIT PAVING 1.4.A. SUBMITTALS Section 01 33 23 ‐ Submittal Procedures

Requirements for submittals.

32 14 40 STONE PAVING 1.3.A. SUBMITTALS Section 01 33 23 ‐ Submittal Procedures

Requirements for submittals.

32 84 00 PLANTING IRRIGATION 1.4.A. SUBMITTALS Section 01 33 00 ‐ Submittal Procedures

Requirements for submittals.

31 05 13 SOILS FOR EARTHWORK 1.4.A. SUSTAINABLE DESIGN SUBMITTALS Section 01 81 13 Requirements for sustainable design submittals.

SEMO ‐ 218940

SEMO 218940

Section Number

Section Name Paragraph Submittal Type Detail

31 10 00 SITE CLEARING 1.4.A. SUSTAINABLE DESIGN SUBMITTALS Section 01 81 13 Requirements for sustainable design submittals.

32 14 16 BRICK UNIT PAVING 1.5.A. SUSTAINABLE DESIGN SUBMITTALS Section 01 81 13 Requirements for sustainable design submittals.

32 91 19 LANDSCAPE GRADING 1.5.A. SUSTAINABLE DESIGN SUBMITTALS Section 01 81 13 Requirements for sustainable design submittals.

01 91 14 TOTAL BUILDING COMMISSIONING 1.6.A. SUBMITTALS Two‐week look‐ahead schedules Schedule showing the next two weeks of commissioning related construction activity to include completion dates for each element of commissioning documentation for each major system or subsystem as identified in 1.1.B.

01 32 16 CONSTRUCTION SCHEDULE 1.3.A. SUBMITTALS Electronic Copies Schedules and reports submitted shall be posted on the NPS/DSC management software website in native electronic file formats. The intent of the Government is to limit the number of printed reports to those determined by the project team as essential.

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 1.4.J. SUBMITTALS Statement of Refrigerant Recovery Signed by refrigerant recovery technician responsible for recovering refrigerant, stating refrigerant that was present was recovered and recovery was performed according to Environmental Protection Agency (EPA) regulations. Include name and address of technician and date refrigerant was recovered.

23 05 00 SPECIAL MECHANICAL AND PLUMBING REQUIREMENTS 1.3.A. SUBMITTALS General Structural steel support drawings and calculations signed and sealed by Specialty Structural Engineer

01 73 40 EXECUTION 1.2.D. SUBMITTALS Quantity Surveys Submit 2 copies showing quantities of work performed and actual construction completed in place.

01 35 23 SAFETY REQUIREMENTS 1.3.A. SUBMITTALS Accident Prevention Plan (APP) Submit APP after contract award and before Pre‐Construction conference. Contracting Officer (CO) will review proposed

APP. If APP requires any revisions or corrections, Contractor shall resubmit Plan within 10 days. No progress payments will be made until the APP is accepted.

01 73 40 EXECUTION 1.2.A. SUBMITTALS Certificates Submit certificate signed by land surveyor certifying location and elevation of improvements comply with requirements.

32 14 40 STONE PAVING 1.3.B. SUBMITTALS Product Data Submit characteristics of paver unit, dimensions, special shapes, and setting materials.

01 32 33 PHOTO DOCUMENTATION 1.2.B. SUBMITTALS Closeout Submit complete set of digital image electronic files as a Project Record Document. Submit on Digital Video Disc (DVD).

32 84 00 PLANTING IRRIGATION 1.4.C. SUBMITTALS Product Data Submit component and control system and wiring diagrams.

01 73 40 EXECUTION 1.2.B. SUBMITTALS Landfill Receipts Submit copy of receipts issued by landfill facility, licensed to accept hazardous materials, for hazardous waste disposal.

31 05 13 SOILS FOR EARTHWORK 1.4.C. SUSTAINABLE DESIGN SUBMITTALS Product Cost Data Submit cost of products to verify compliance with Project sustainable design requirements. Exclude cost of labor and equipment to install products.

31 10 00 SITE CLEARING 1.4.C. SUSTAINABLE DESIGN SUBMITTALS Product Cost Data Submit cost of products to verify compliance with Project sustainable design requirements. Exclude cost of labor and equipment to install products.

31 25 00 EROSION AND SEDIMENTATION CONTROLS 1.4.B. SUSTAINABLE DESIGN SUBMITTALS Product Cost Data Submit cost of products to verify compliance with Project sustainable design requirements. Exclude cost of labor and equipment to install products.

32 14 16 BRICK UNIT PAVING 1.5.C. SUSTAINABLE DESIGN SUBMITTALS Product Cost Data Submit cost of products to verify compliance with Project sustainable design requirements. Exclude cost of labor and equipment to install products.

31 10 00 SITE CLEARING 1.3.B. SUBMITTALS Product Data Submit data for herbicide. Indicate compliance with applicable codes for environmental protection.

32 14 16 BRICK UNIT PAVING 1.4.B. SUBMITTALS Product Data Submit data on characteristics of paver unit, curbs and border, special shapes, dimensions, mortar, setting and grouting materials.

32 14 16 BRICK UNIT PAVING 1.4.C. SUBMITTALS Samples Submit five sample pavers units illustrating color, surface finish, and texture.

01 32 33 PHOTO DOCUMENTATION 1.2.A. SUBMITTALS Construction Images Submit images electronically within seven days of taking the image. Include 32 93 00 PLANTS 1.4.B. SUBMITTALS Product Data Submit list of plant material sources, data for fertilizer and other accessories.

01 57 23 UNDER‐AN‐ACRE POLLUTION PREVENTION 1.3.D. SUBMITTALS Erosion Control Products Submit manufacturer’s product information and installation recommendations for silt fence, filter fabric, erosion control blanket, straw bales, and other materials proposed for use on this project.

01 91 14 TOTAL BUILDING COMMISSIONING 1.6.G. SUBMITTALS Functional performance test forms Submit minimum 30 calendar days prior to testing

31 05 13 SOILS FOR EARTHWORK 1.3.C. SUBMITTALS Materials Source Submit name of imported materials source.

32 91 19 LANDSCAPE GRADING 1.4.C. SUBMITTALS Materials Source Submit name of imported materials source.

32 84 00 PLANTING IRRIGATION 1.4.D. SUBMITTALS Samples Submit one outlet of each type, with housing. Accepted samples may be used in the Work.

01 78 23 OPERATION & MAINTENANCE DATA 1.2.B. SUBMITTALS Format Submit operations and maintenance manuals in following format 01 73 29 CUTTING AND PATCHING 1.2.A. SUBMITTALS Cutting and Patching Plan Submit Plan describing procedures at least 10 days before cutting and patching will be performed, requesting approval to proceed. Include 01 40 00 QUALITY REQUIREMENTS 1.4.F. SUBMITTALS Off‐Site Inspection Reports Submit prior to shipment.

01 33 23 SUBMITTAL PROCEDURES 2.1.C. ACTION SUBMITTALS Samples Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed.

01 57 23 UNDER‐AN‐ACRE POLLUTION PREVENTION 1.3.B. SUBMITTALS Inspection Schedule Submit schedule for inspection and monitoring of pollution prevention measures.

01 57 23 UNDER‐AN‐ACRE POLLUTION PREVENTION 1.3.C. SUBMITTALS Inspection Schedule Submit schedule for inspection and monitoring of storm water pollution prevention measures.

01 40 00 QUALITY REQUIREMENTS 1.4.C. SUBMITTALS Contractor Quality Control (CQC)

Daily Reports Submit showing inspections and tests on first workday following date covered by report. Quality Control Supervisor shall utilize DSC Forms.

01 79 00 DEMONSTRATION AND TRAINING 1.3.B. SUBMITTALS Demonstration and Training Video Submit two copies of each DVD (digital video disc) for training sessions within seven days of end of each training module.

SEMO ‐ 218940

SEMO 218940

Section Number

Section Name Paragraph Submittal Type Detail

01 78 23 OPERATION & MAINTENANCE DATA 1.2.A. SUBMITTALS Manual Submit two copies of each manual in draft form or one electronic copy at least 15 days before final inspection. Contracting Officer (CO) will return copy or edit version with comments within 15 days of receipt.

01 79 00 DEMONSTRATION AND TRAINING 1.3.A. SUBMITTALS Instruction Program Submit two copies of outline of instructional program for demonstration and training, including schedule of proposed dates, times, length of instruction time, and instructors' names for each training module. Include learning objective and outline for each training module.

01 73 40 EXECUTION 1.2.C. SUBMITTALS Certified Surveys Submit two copies signed by professional engineer.

32 13 13 CONCRETE PAVING 1.4.C. SUBMITTALS Samples Submit two sample panels, 6 x 6 IN in size illustrating exposed aggregate finish.

01 91 14 TOTAL BUILDING COMMISSIONING 1.6.D. SUBMITTALS Commissioning Plan Submit within 30 calendar days of authorization to proceed.

31 05 13 SOILS FOR EARTHWORK 1.3.B. SUBMITTALS Samples Submit, in air‐tight containers, 10LB (4.5 KG) sample of each type of fill to testing laboratory.

32 91 19 LANDSCAPE GRADING 1.4.B. SUBMITTALS Samples Submit, in air‐tight containers, 5 LB (4.5 KG) sample of each type of fill to testing laboratory.

01 33 23 SUBMITTAL PROCEDURES 1.3.C. GENERAL SUBMITTAL PROCEDURES Submittal List Submittal list is attached to the end of this Specification Section. The intent is to provide an overall summary of submittal requirements. The requirements of individual Specification Sections and terms and conditions of the Contract still apply regardless of what is shown on submittal list.

01 33 23 SUBMITTAL PROCEDURES 1.3.G. GENERAL SUBMITTAL PROCEDURES Identification Submittal number or other unique identifier, including revision identifier.

32 91 19 LANDSCAPE GRADING 1.4.A. SUBMITTALS Section 01 33 00 ‐ Submittal Procedures

Submittal procedures.

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 1.4.B. SUBMITTALS Progress Documentation Supplemental to Waste Management Plan, document solid waste disposal, diversion, and cost/revenue analysis and submit completed worksheet on a monthly basis. See Project Waste Management Plan Worksheet Sample, attached to the end of the Division 1 Specifications, and report totals to date for column headings.

01 31 00 PROJECT MANAGEMENT AND COORDINATION 1.4.D. SUBMITTALS Division 1 documents The following items shall be submitted a minimum of one week prior to Preconstruction Conference. Contracting Officer will notify Contractor of tentative date for Pre‐Construction Conference.

01 33 23 SUBMITTAL PROCEDURES 1.3.J. GENERAL SUBMITTAL PROCEDURES Use for Construction Use only final submittals with mark indicating "Approved" or "Approved with notations". Ensure notations have been incorporated and, at a minimum, keep one copy of final approved submittal on site for use during construction.

23 05 50 MECHANICAL SOUND AND VIBRATION CONTROL 1.3.A. SUBMITTALS Product Data 23 23 00 REFRIGERANT PIPING 1.3.A. ACTION SUBMITTAL Product Data

23 23 00 REFRIGERANT PIPING 1.4.A. CLOSEOUT SUBMITTAL Operation & Maintenance…