B08_Amendment_0006_Attachment_2_SPECIFICATIONS_ADDENDUM_1_6_6_23_0006.pdf
PDF 1022 KB Posted
- Attached to
- SEMO 218940, Develop Selma Interpretive Center at Federal contract opportunity
- Solicitation number
- 140P2023R0022
About this file
This solicitation is for the development of the Selma Interpretive Center at the Selma To Montgomery National Historic Trail in Selma, Alabama. The National Park Service seeks to rehabilitate the existing center to improve visitor amenities and interpretive experiences. The estimated total cost of the project is $2,189,400. Responses are due by February 17, 2023, and the contract is expected to be awarded by June 2023. The work will include repairs and upgrades to the building interior and exterior, as well as new exhibits and wayfinding signs. The scope of work encompasses architectural, structural, mechanical, and electrical construction services.
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEMO - 218940 1
ADDENDUM NO. 1, 06-06-2023 Narrative
Rehabilitate Selma Interpretive Center Addendum #1 – Narrative June 6, 2023
The following specification sections are being reissued to replace previously issued sections of the same number to the project manual.
08 71 00 - Door Hardware
32 14 16 – Brick Unit Paving
The following drawing is being reissued to replace the previously issued drawing.
A31 - Door Schedule, Window and Door Types
Bidders are required to acknowledge receipt of Addendum in appropriate space on Bid Form.
SEMO - 218940 08 06 71 - 1
ADDENDUM NO. 1, 06-06-2023 DOOR HARDWARE SCHEDULE
SECTION 08 06 71 - DOOR HARDWARE SCHEDULE
PART 1 - GENERAL
1.1 SUMMARY
A. Furnish labor, materials, tools, equipment, and services for Door Hardware, as indicated, in accordance with provisions of Contract Documents.
B. Completely coordinate with work of other trades.
1.2 QUALITY ASSURANCE
A. Hardware Supplier Qualifications:
1. Architectural door hardware supplier with warehousing facilities.
2. Operating in the project’s vicinity for a period of not less than 2 years.
3. Certified Architectural Hardware Consultant (AHC) available throughout construction.
B. Electrified Hardware Supplier Qualifications:
1. Experienced door hardware supplier who has completed projects with electrified door hardware similar in material, design and extent to that indicated for this project and acceptable to manufacturer of materials.
2. Prepare data for electrified door hardware based on testing and engineering analysis of manufacturer’s assemblies similar to those in this project.
C. Fire Rated Door Assemblies:
1. Provide door hardware rated for use in assemblies complying with NFPA 80.
2. Include listed and labeled hardware from a qualified testing agency, for fire protection ratings indicated,
3. Comply with Positive Pressure Requirements UL-10C, Category A or NFPA
252.
D. Smoke and Draft Control Assemblies:
1. Maximum Leakage: 3 CUFTM per SF of door face area when tested at pressure of 0.10 IN water per UL 1784.
2. Applicability:
a. Doors in Smoke Partitions, Smoke Barriers and Corridor walls.
b. Doors forming part of an Elevator Lobby enclosure.
3. Provide S-Labels where required.
SEMO - 218940 08 06 71 - 2
E. Finish designations and standards: Builders Hardware Manufacturers Association (ANSI/BHMA) Standard 1301.
F. Regulatory Requirements:
1. Barrier free design requirements of the local jurisdiction and Architectural Barriers Act (ABA).
2. Listing requirements of the local jurisdiction and UL listing where applicable by type.
G. Preinstallation Conference:
1. Prior to installation of hardware, Construction Manager/Contractor conduct an on-site meeting to instruct hardware installer personnel in the proper installation of hardware and related electronics.
a. Manufacturer’s Reps for Locksets, Closers, Exit Devices and other major hardware devices shall be present and direct instruction of installers.
b. Require attendance of affected parties, not limited to: Construction Manager/Contractor, hardware installer, electrical installer, door and frame installers and security installer, where applicable, and installer working with low voltage wiring of electromechanical hardware.
c. Discuss installation sequence of components, point-to-point wiring diagrams, and address questions raised by installers.
1.3 SUBMITTALS
A. Product Data:
1. For each type of material and accessory.
B. Shop Drawings:
1. Complete Hardware Schedule by door.
a. Complete list of products including model numbers and cut sheets.
b. Use Heading Numbers logically derived from Architect’s Hardware Set numbers.
c. Hardware Sets shall follow the guidelines established in Door and
Hardware Institute Handbook (DHI) Sequence and Format for the Hardware Schedule.
d. Notify Contracting Officer of items which will not operate properly, attain the required fire label, and where components are physically or functionally incompatible.
2. Diagrammatic Elevations and Point-to-Point Wiring Diagrams of openings scheduled to receive electrified hardware and electronic access control devices.
SEMO - 218940 08 06 71 - 3
a. Provide detailed wiring diagrams showing connections for signaling, control and locking functions and notes pertinent to programming, operation, etc.
b. When door hardware sets include automatic operators and locking or latching hardware on the same doors, provide detailed wiring diagrams.
c. Submit with Hardware Schedule.
C. Project Information:
1. Certification that items bear UL label where required.
2. Meeting minutes from Pre-Installation Meeting.
D. Contract Closeout Information:
1. Schedule of components installed as hardware sets for each opening.
2. Operating and maintenance data.
a. Parts catalog for each product furnished.
b. Keying records.
3. Government instruction report.
4. Letter stating extra material has been delivered.
1.4 SPECIAL WARRANTY
A. Written warranty in which manufacturer agrees to repair or replace components of door hardware that fail in materials or workmanship within 3 years from date of Substantial Completion, or 25 years from date of Substantial Completion in the case of manual surface closers.
1. Failures include, but are not limited to, the following:
a. Structural failures including excessive deflection, cracking or breakage.
b. Faulty operation of door hardware.
c. Deterioration of metals, metal finishes, and other materials beyond normal weathering and use.
1.5 MAINTENANCE
A. Extra Materials:
1. Provide special tools as supplied by hardware manufacturer, for each different or special hardware component.
SEMO - 218940 08 06 71 - 4
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers listed in Related Sections:
1. 08 71 00 – Door Hardware
2. All levers where possible will be basis of design, Schlage M-Collection
Decorative Levers, Style M55, Finish 643 - Aged Bronze to match levers currently installed in 2 Broad.
2.2 HARDWARE SETS – EXTERIOR
A. HW-9:
1. Hinges
2. Delayed Action Closer
3. Exit Device
a. Rim type
b. Non-Fire Rated (doggable).
c. Lever Trim
d. Night Latch with Offset Pull
4. Kickplate
5. Weatherstripping
6. Threshold
7. Head Drip
8. Stop
2.3 HARDWARE SETS – INTERIOR
A. HW-2 (Privacy with Closer):
1. Hinges
2. Mortise Lockset, privacy with integral deadbolt F19
3. Occupancy Indicator:
a. Sectional indicator
b. Escutcheon indicator
c. Base Product: L283 by Schlage.
d. Emergency unlock from outside by coin turn mechanism.
4. Stop
5. Closer
6. Kickplate
B. HW-7A (Office Function, No Closer):
SEMO - 218940 08 06 71 - 5
1. Hinges
2. Mortise Lockset, office F04
3. Stop
C. HW-7B:
1. Hinges
2. Mortise Lockset, classroom F05
3. Stop
D. HW-3 (Storage Function with Closer):
1. Hinges
2. Mortise Lockset, storeroom F07
3. Stop
4. Delayed Action Closer
5. Kickplate (Omit kickplate at HM exterior roof access door 4-304)
E. HW-1 (Push/Pull Public Restrooms):
1. Hinges
2. Closer
3. Pushplate
4. Pull
5. Stop
6. Kickplate
F. HW-8 (Interior Egress)- Single Door Serving 50 or more):
1. Hinges
2. Exit Device
a. Rim type
b. Non-Fire Rated (doggable)
c. Passage Function
d. Lever Trim
3. Closer
4. Stop
5. Kickplate
G. HW-4 (Stair Egress):
1. Hinges
2. Exit Device
a. Rim type
b. Fire Rated
c. Lever Trim
3. Closer
SEMO - 218940 08 06 71 - 6
4. Stop
5. Kickplate
6. Cylinder
H. HW-13 (Stair Landing Swinging Gate @ Stair ):
1. Spring Hinges
2. Wall mounted Door Bumper
3. Steel Gates: Specified in Section 05 51 00
I. HW-5 (Active/Inactive – Exit Device/Flush Bolt):
1. Hinges
2. 2 Closers
3. 1 Exit Device (active leaf)
a. Mortise type
b. Fire Rated.
c. Lever Trim.
d. Cylinder
4. Constant Latching Flushbolts (inactive leaf)
5. Dustproof strike
6. 2 Stops
7. 2 Kickplates
J. HW-6 (Active/Inactive Pair – Classroom):
1. Hinges
2. Constant Latching Flushbolts (inactive leaf)
3. Dustproof strike
4. Mortise Lockset, classroom F05
5. 2 Stops
6. 2 Kickplates
K. HW-10 & 11:
1. Cylinder and/or key core to suit lock specified elsewhere.
L. HW-12:
1. Applied flush bolts or multiple horizontal bolts to secure existing historic exterior pairs of doors so the are no longer used as door openings and act like a fixed window opening. Refer to Door Schedule Remark No. 8.
2. Weather stripping.
3. Sill sealer/sweep.
4. Threshold as required for weather tightness.
SEMO - 218940 08 06 71 - 7
PART 3 - EXECUTION
3.1 INSPECTION
A. Examine scheduled openings for compliance with requirements for installation tolerances, labeled fire door assembly construction, wall and floor construction, and other conditions affecting performance.
B. Coordinate reinforcement or other preparation of doors and frames.
C. Installation constitutes responsibility for performance.
D. Coordinate installation power supply and communication wiring to electrically operated devices.
3.2 INSTALLATION
A. Install in accordance with manufacturer's installation instructions, supervised or inspected by an AHC.
B. Furnish items of hardware for proper door swing.
C. Permanently install hardware after finishing operations are complete.
D. Protect finishes by temporary coverings as required.
E. Mounting Heights:
Mounting Heights of Hardware
Item Height 1,2
(to Item Centerline) Mortise Locksets
40-5/16 IN AFF to Centerline of Strike 3 Cylindrical Locksets Patient Latches Exit Devices Door Pulls 42 IN AFF to Centerline of Pull Pushplates 45 IN AFF to Centerline of Plate
Auxiliary Deadbolts 48 IN AFF to Centerline of Strike
Butt Hinges (and Pivots)
Top Hinge: Not more than 11-3/4 IN down from frame
Bottom Hinge: Not more than 13 IN above floor
Equally spaced between Top and Bottom Hinges. Refer to Part 2 for quantity required.
Other Items Comply with SDI and DHI
Recommendations
Footnotes/Additional Requirements:
SEMO - 218940 08 06 71 - 8
1. Mounting Heights shall also comply with ADA and ICC/ANSI 117.1
2. Mounting Heights shall also comply with Building Code and Fire Codes.
3. Deviation from listed height will be allowed up to + 1-1/2 IN provided this does not cause a conflict between the lock and lite cutouts.
F. Install hardware with fasteners concealed where not required by code to be exposed.
G. Coordinate installation of electric access control hardware.
1. Hardware installer to be responsible for coordination with electrical installer for low voltage installations.
H. Door Position Switches (DPS):
1. Coordinate door and frame preparations with door and frame suppliers, and Security System installer as appropriate.
2. Locate in frame head approximately 4 IN from latching door edge, unless otherwise instructed.
3.3 ADJUST AND CLEAN
A. Adjust and check each operating item of hardware to ensure proper operation or function.
1. Lubricate moving parts with lubricant recommended by manufacturer.
2. Replace units which cannot be adjusted and lubricated to operate smoothly.
B. Conversion of Construction Keying to Permanent (by Contractor):
1. Convert cylinders from Construction to Permanent configuration at time of Substantial Completion.
2. Demonstrate conversion method to Government’s facility personnel, making certain Government’s team understands methodology.
C. Approximately six months after substantial completion, check and readjust to assure proper function of doors and hardware.
1. Clean and lubricate operational items.
2. Replace items which have deteriorated or failed.
3. Prepare a written report of current and predictable problems in operation of hardware.
4. Report visit and furnish copy of report to Contracting Officer with copy to
Architect.
D. When hardware is installed more than one month prior to final acceptance or occupancy, during week prior to acceptance or occupancy, make a final check and adjustment of hardware items.
1. Remove temporary coverings.
2. Clean and lubricate for proper function and finish.
SEMO - 218940 08 06 71 - 9
3. Adjust door control devices to compensate for operation of heating and ventilating equipment.
E. Instruct Government's personnel:
1. Operating and maintenance procedures.
2. Key control system.
3. Methodology used to re-key cylinders from Construction to Permanent configuration.
F. Prior to substantial completion instruct Government's personnel in systems operation.
1. Standard system operation and maintenance.
2. Modification of codes.
3. Acquisition, monitoring and scheduling of ID cards.
4. Instruction in software applications.
END OF SECTION
SEMO - 218940 32 14 16 - 1
ADDENDUM NO. 1, 06-06-2023 BRICK UNIT PAVING
SECTION 32 14 16 - BRICK UNIT PAVING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Clay brick pavers.
2. Mortar setting bed.
3. Sand joints.
4. Control and expansion joints.
B. Related Sections include but are not necessarily limited to:
1. Division 00 - Procurement and Contracting Requirements.
2. Division 01 - General Requirements.
3. Section 07 92 13 – Exterior Joint Sealants.
4. Section 32 91 19 - Landscape Grading: Preparation of subsoil for pavers.
5. Section 33 10 10 - Outside Utilities: Manholes and Drains, including frames.
6. Section 32 13 13 – Concrete Paving: Concrete paving for brick paver base.
1.2 QUALITY ASSURANCE
A. Reference Standards:
1. American National Standards Institute (ANSI):
a. A118.4, Latex-Portland Cement Mortar.
2. ASTM International (ASTM):
a. C144, Standard Specification for Aggregate for Masonry Mortar.
b. C270, Standard Specification for Mortar for Unit Masonry.
c. C902, Standard Specification for Pedestrian and Light Traffic Paving
Brick.
d. C1272, Standard Specification for Heavy Vehicular Paving Brick.
e. C1371, Standard Test Method for Determination of Emittance of Materials
Near Room Temperature Using Portable Emissometers.
f. C1549, Standard Test Method for Determination of Solar Reflectance Near
Ambient Temperature Using a Portable Solar Reflectometer.
g. E408, Standard Test Methods for Total Normal Emittance of Surfaces
Using Inspection-Meter Techniques.
h. E903, Standard Test Method for Solar Absorptance, Reflectance, and
Transmittance of Materials Using Integrating Spheres.
i. E1918, Standard Test Method for Measuring Solar Reflectance of
Horizontal and Low-Sloped Surfaces in the Field.
SEMO - 218940 32 14 16 - 2
j. E1980, Standard Practice for Calculating Solar Reflectance Index of Horizontal and Low-Sloped Opaque Surfaces.
B. Perform Work in accordance with Alabama Department of Transportation standards.
C. Maintain one copy of each document on site.
1.3 SYSTEM DESCRIPTION
A. Paving and Setting Bed: To accommodate pedestrian traffic.
B. Paving and Setting Bed: Support gross vehicular loads of 7000 LBS maximum.
1.4 SUBMITTALS
A. Section 01 33 23 - Submittal Procedures: Requirements for submittals.
B. Product Data: Submit data on characteristics of paver unit, curbs and border, special shapes, dimensions, mortar, setting and grouting materials.
C. Samples: Submit five sample pavers units illustrating color, surface finish, and texture.
1.5 SUSTAINABLE DESIGN SUBMITTALS
A. Section 01 81 13 - Sustainable Design Requirements for Non-LEED Projects:
Requirements for sustainable design submittals.
B. Manufacturer's Certificate: Certify products meet or exceed specified sustainable design requirements.
1. Sustainable Sites Certificates:
a. Certify paving materials solar reflectance index.
2. Materials Resources Certificates:
a. Certify source and origin for salvaged and reused products.
b. Certify recycled material content for recycled content products.
c. Certify source for regional materials and distance from Project site.
C. Product Cost Data: Submit cost of products to verify compliance with Project sustainable design requirements. Exclude cost of labor and equipment to install products.
1. Provide cost data for the following products:
a. Salvaged, refurbished, and reused products.
b. Products with recycled material content.
c. Regional products.
SEMO - 218940 32 14 16 - 3
1.6 QUALIFICATIONS
A. Manufacturer: Company specializing in manufacturing Products specified in this section with minimum three years documented experience.
B. Installer: Company specializing in performing work of this section with minimum three years documented experience and approved by manufacturer.
1.7 MOCKUP
A. Construct mock-up, 9 FT long by 8 FT wide including setting bed, brick pavers, stone curbs, joint sealers, control joints, expansion joints, and accessories to pattern indicated.
B. Incorporate accepted mockup as part of Work.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers:
1. Acceptable Manufacturer: Endicott Clay Products Co., which is located at: 57120 707th Rd.; Endicott, NE 68350; Tel: 402-729-3315; Fax: 402-729-5804;
2.2 PEDESTRIAN/LIGHT VEHICULAR PAVERS
A. Pavers with wire cut surface texture as manufactured by Endicott Clay Products Co. or approved equal
1. Actual Product Size: 4 x 8 x 2-1/4 inches.
2. Colors: Rose Blend and Red Blend to match from manufacturer full line.
3. Patterns: As shown on drawings.
4. Spacers: T-tees and X-crosses
2.3 HEAVY VEHICULAR PAVERS
A. Pedestrian/Light Vehicular Pavers: Pavers with wire cut surface texture as manufactured by Endicott Clay Products Co. or approved equal
1. Actual Product Size: 4 x 8 x 2-5/8 inches.
2. Colors: Rose Blend and Red Blend to match from manufacturer full line.
3. Patterns: As shown on drawings.
4. Spacers: T-tees and X-crosses
SEMO - 218940 32 14 16 - 4
2.4 SUSTAINABILITY CHARACTERISTICS
A. Section 01 81 13 - Sustainable Design Requirements for Non-LEED Projects:
Requirements for sustainable design compliance.
B. Sustainable Sites Characteristics:
1. Paving Surfaces: Minimum solar reflectance index (SRI) of 29, calculated in accordance with ASTM E1980.
a. Reflectance: Measured in accordance with ASTM E903, ASTM E1918, or
ASTM C1549.
b. Emittance: Measured in accordance with ASTM E408 or ASTM C1371.
C. Materials and Resources Characteristics:
1. Regional Materials: Furnish materials extracted, processed, and manufactured within 500 miles of Project site.
2.5 PAVER MATERIALS
A. Pavers: ASTM C902, Weather Class SX, Traffic Type I, Application PS, to the following characteristics:
Property Value
Moisture Absorption (maximum) 20 to 39 percent
Size (actual) 2 5/8”x 4”x 8” IN
Color Rose Blend and Red Blend or Approved Equal
Exposed Surface Texture Wirecut texture
Special Shapes NA
Special Design in Paver As shown on drawings
B. Pavers: ASTM C1272, Type R, applications PS, to the following characteristics:
Compressive Strength 7000 PSI
Moisture Absorption (maximum) 20%
Size (actual) 2 5/8” x 4” x 8” IN
Color Rose Blend and Red Blend or Approved Equal
Exposed Surface Texture Wirecut Texture
Special Shapes NA
Special Design in Paver As shown on drawings
SEMO - 218940 32 14 16 - 5
2.6 SAND MATERIALS
A. Sand for joints: ASTM C144 sharp, coarse, clean, screened sand free from deleterious material.
2.7 CEMENTITIOUS MATERIALS
A. Portland Cement: ASTM C150, Type I; grey color.
B. Sand: ASTM C144 sharp, coarse, clean, screened sand free from deleterious material.
C. Cementitious Bed: ASTM C270, Type M portland cement mix in accordance with the following:
Compressive Strength (28 day) 2500 PSI
Slump 3 to 4IN
Air Entrained 5 to 7%
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify substrate is ready to support pavers and imposed loads.
B. Verify gradients and elevations of substrate are correct.
3.2 INSTALLATION
A. Install pavers in accordance with Brick Industry Association (BIA) guidelines and industry standards and in proper relationship with adjacent construction.
B. Place paver units in running bond pattern to match plans, from straight reference line.
C. Place half units or special shaped units at edges and interruptions. Maintain evenly spaced joints. Machine saw partial units.
D. Spread sand over surface and sweep into joints. Moisten joints and recover with additional sand until firm joints are achieved. Remove excess sand.
E. Tamp and level paver units with mechanical plate vibrator until units are firmly bedded, level, and to correct elevation and slope gradient.
SEMO - 218940 32 14 16 - 6
F. Spread sand over surface and sweep into joints.
3.3 CLEANING
A. Clean soiled surfaces using cleaning solution. Do not harm pavers, joint materials, or adjacent surfaces.
B. Use non-metallic tools in cleaning operations.
C. Rinse surfaces thoroughly with clean water.
D. Broom clean paving surfaces. Dispose of excess sand.
3.4 PROTECTION OF FINISHED WORK
A. Protect paver surface until completion of project.
B. Touch-up, repair or replace damaged products before Substantial Completion.
END OF SECTION
R E
F E
R T
O S
C H
E D
U
LE
SCHEDULE
REFER TO
HM/WD
F (FLUSH)
WD
P2-D (PANEL 2 DOUBLE)
WD
4B-D (4 BROAD DOUBLE)
5' - 3"
/2
1 1/2"
3"
2' - 0"
3" 3"
2' - 0"
3"
1 1/2"
3 1/4" 11"
1 1/2"
11"
6 1/2"
11"
1 1/2"
11" 3 1/4"
1 1/2" 2' - 3 3/4" 1 1/2" 2' - 3 3/4" 1 1/2"
4" 1'
0" 4"
6'
3"
1/
2"
2'
1/
2"
1/
2"
/2
5' - 3"
5" 3'
1/
2" 4"
2" 7'
0"
5'
11" 5" 2' - 5" 5" 11"
4" 4' - 5" 4"
WD
2B-A (2 BROAD ARCHED)
9'
0"
4' - 0"
3"
1'
3"
6" 8"
5'
1'
1" 5"
3' - 0" 5" 1"
3"
1' - 6 1/2"
3"
1' - 6 1/2"
3"
WD
4B-R (4 BROAD REAR)
GL-1
GL-1
GL-1
GL-1 GL-1
GL-1 GL-1
GL-1GL-1
WD
P1 (PANEL 1)
SCHEDULE
REFER TO
R E
F E
R T
O S
C H
E D
U
LE
REFER TO SCHEDULE
R E
F E
R T
O S
C H
E D
U
LE
WD
P2 (PANEL 2)
SCHEDULE
REFER TO
R E
F E
R T
O S
C H
E D
U
LE
WD
P2-T (PANEL 2 W/ TRANSOM)
SCHEDULE
REFER TO
R E
F E
R T
O S
C H
E D
U
LE
1'
8" 6"
8" 6"
8" 6"
1'
0"
6"
6" 2'
6"
3'
6"
6" 2'
6"
3'
6"
4"1'
2"
RO
ROLLING OVERHEAD
A S
S C
H E
D U
LE
D
AS SCHEDULED
NOTES:
1. DOORS WITH 'X' IN THE NAME ARE EXISTING AND SCHEDULED FOR TRACKING AND LOCATION PURPOSES ONLY. ANY WORK REQUIRED WILL BE INDIVIDUALLY NOTED.
2. DOORS WITH NO NAME IN THE ROOM NAME COLUMN ARE EXTERIOR DOORS.
3. EXISTING HISTORIC EXTERIOR WOOD DOORS WILL BE RESTORED AND PAINTED P-12.
4. EXISTING HISTORIC EXTERIOR WINDOWS THAT ARE BADLY DETERIORATED OR MISSING WILL BE REPLACED WITH PERIOD CORRECT REPRODUCTION WINDOWS. REFER TO EXTERIOR ELEVATIONS.
REMARKS:
1. EXTERIOR DOOR; REFER TO DOOR TYPES FOR SCOPE OF WORK
2. WOOD CASED OPENING, NO DOOR
MATERIAL AND FINISH LEGEND
MATERIAL FINISH
P-#
ST-#
TF-#
PAINT
FIELD STAINED WITH TRANSPARENT FINISH
CLEAR TRANSPARENT FINISH
AL
HM
WD
ALUMINUM
HOLLOW METAL
WOOD
3'
/2
1'
7'
1"
7'
1"
1'
0"
8'
/2
7'
2'
2'
1'
2'
6'
4'
2'
4'
5'
/2
5' - 3"
6'
0"
4'
/4
7' - 6"
1'
/8
2'
/8
1'
/8 "7' - 6"
2'
/8
1'
/8
6' - 0"
7'
4' - 0"
7'
3' - 4"
3'
/8
3' - 6 1/2"
2'
3' - 0"
4'
6'
/4
2'
4' - 2" 4' - 2"
4'
6'
/4
3/
8"
5'
5'
3' - 3"
4'
5'
3/
8"
4' - 2"
2'
/8
2'
/4
3' - 6 1/2"
7'
4' - 0"
4'
5'
/4
3' - 2"
1'
2' - 7 1/2"
4' - 11 7/16"
4' - 11 7/16"
4' - 4 15/16"
2' - 1"
3' - 10 3/16"
3' - 10 3/16"
1' - 7"
W1 W2 W3 W4 W5 W6 W7 W8
W9 W10 W11 W12 W13 W14 W15
1/ 4"
4'
/4
3'
/4
9'
/2
EXISTING WD -
STRIP, PREP AND TRANSPARENT FINISH
(NIC - WORK BY NPS)
EXISTING WD -
REPAIR AND PAINT
HDPE PANEL WITH
APPLIED PVC
MULLIONS AND TRIM
NEW WD -
PAINT
NEW WD -
PAINT
NEW WD -
PAINT
EXISTING WD
(NIC - WORK BY NPS)
EXISTING WD
(NIC - WORK BY NPS)
EXISTING WD -
(NIC - WORK BY NPS)
NEW WOOD -
PAINT, NO GLAZING
EXISTING WD NEW WD -
PAINT
EXISTING WD
(NIC - WORK BY NPS)
GLAZING TYPES
GL-1: 1 1/8" LAMINATED, INSULATED UNIT, LOW-E
GL-2: 1/4" LAMINATED, REFLECTIVE
GL-3: 1" INSULATED UNIT, LOW-E
1'
1'
/2
6'
/2
2'
/2
5' - 3"
2' - 3 3/4" 2' - 3 3/4"
W16
EXISTING WD - REPAIR
AND PAINT
HDPE PANEL
WITH APPLIED
PVC MULLIONS
AND TRIM, PAINT
GL-1
GL-1
/2
3' - 6"
3" 3' - 0" 3"
2'
/2
4"1'
0"
4"
6'
3"
1' - 1 1/2" 6" 1' - 1 1/2"
2' - 9"
GL-1GL-1
GL-1GL-1
GL-1
GL-1
HDPE PANEL
WITH APPLIED
PVC MULLIONS
AND TRIM, PAINT
HDPE PANEL WITH
APPLIED PVC
MULLIONS AND TRIM
HDPE PANEL WITH
APPLIED PVC
MULLIONS AND TRIM
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
OF
PMIS/PKG NO
SHEET
175308
DRAWING NO.
A u to d e s k
D o c s N P S S e lm a In te rp re ti v e C e n te r_ A C E N T R A L .r v t
S. HEANEY
J. HOLTZ A31N. NASH
01/06/2023
DOOR SCHEDULE,
WINDOW AND DOOR
TYPES
SELMA TO MONTGOMERY HISTORIC TRAIL
218940
DOOR AND FRAME SCHEDULE
DOOR
NUMBER
SIZE DOOR FRAME
FIRE RATING
HARDWARE
SET REMARKSWIDTH HEIGHT TYPE MATERIAL FINISH GLAZING TYPE MATERIAL FINISH
2-001X 2' - 0" 6' - 6" --
2-002X 3' - 0" 7' - 0" F
2-003X 2' - 0" 6' - 6" --
2-101X 5' - 3" 10' - 0" 2B-A WD TF-01 WD TF-01 1
2-102X 4' - 9" 10' - 0" WD TF-01 WD TF-01 1
2-103 3' - 0" 7' - 0" F XX XX XX BBBBB XX XX XX
2-104 3' - 0" 7' - 0" F WD
2-105 3' - 0" 7' - 0" F
2-106 3' - 0" 7' - 0" F
2-107A 3' - 0" 7' - 0" F
2-107B 3' - 0" 7' - 0" F
2-107X 3' - 0" 7' - 0" F WD HM
2-108X 3' - 0" 7' - 0" F HM HM
2-109X 2' - 4" 6' - 6" WD --
2-111AX 2' - 8" 7' - 0" P1 WD HM HM
2-111BX 2' - 8" 7' - 0" P1 WD HM
2-111X 5' - 3" 10' - 0" 2B-A WD TF-01 WD TF-01 1
2-112X 2' - 8" 7' - 0" F WD WD
2-201X 2' - 8" 7' - 0" F WD WD
2-202X 2' - 8" 7' - 0" F WD WD
2-203X 2' - 8" 7' - 0" P1 WD WD
2-204X 2' - 8" 7' - 0" F WD HM
2-205X 2' - 8" 7' - 0" P1 WD WD
2-206X 2' - 8" 7' - 0" P1
2-207X 2' - 8" 7' - 0" P1 WD WD
2-208X 2' - 8" 7' - 0" F WD WD
2-209X 2' - 8" 7' - 0" P1 WD WD
2-210X 2' - 8" 7' - 0" F WD HM
2-211X 2' - 8" 7' - 0" F WD HM
2-212X 2' - 8" 7' - 0" F WD HM
2-213X 2' - 8" 7' - 0" F WD HM
2-214X 2' - 8" 7' - 0" F WD HM
2-305X 2' - 8" 7' - 0" P1 WD WD
2-306X 2' - 8" 7' - 0" P1 WD WD
2-307X 2' - 8" 7' - 0" F WD HM
2-309X 2' - 8" 7' - 0" P1 WD WD
2-310X 2' - 8" 7' - 0" P1 WD WD
2-311X 2' - 8" 7' - 0" P1 WD WD
2-312X 2' - 8" 7' - 0" P1 WD WD
2-313 3' - 0" 7' - 0"
4-003X 3' - 0" 7' - 0" F
4-005X 3' - 0" 7' - 0" F
4-101A 6' - 0" 7' - 0" P2-D WD P-06/P-05
4-101B 6' - 0" 7' - 0" P2-D WD P-06/P-05
4-101X 5' - 0" 11' - 6" 4B-D WD P-# WD P-#
4-102X 3' - 0" 7' - 0" F WD HM
4-103X 3' - 0" 9' - 0" 4B-D WD P-# WD P-# 1
4-104X 4' - 0" 9' - 10" 4B-R WD P-# WD P-# 1
4-202 3' - 0" 7' - 0" F WD P-06
4-203X 2' - 8" 7' - 0" P1 WD
4-301X 2' - 8" 7' - 0" P1
4-303 3' - 0" 7' - 0" F WD P-06
6-002 3' - 0" 7' - 0" F HM P-06
6-010 3' - 0" 6' - 8" F 1 HR
6-101X 5' - 0" 11' - 6" 4B-D WD P-# WD P-# 1
6-102 3' - 0" 7' - 0" F WD P-06/P-05
6-102X 5' - 0" 11' - 6" 4B-D WD P-# WD P-# 1
6-103 3' - 0" 7' - 0" F WD P-05
6-103X 5' - 0" 11' - 6" 4B-D WD P-# WD P-# 1
6-104 3' - 0" 7' - 0" F
6-105 3' - 0" 7' - 0" F WD P-05
6-106 3' - 0" 7' - 0" F WD P-05
6-107 6' - 0" 7' - 0" FD WD WD
6-108 5' - 3" 10' - 0"
6-110A 5' - 3" 10' - 0"
6-111 3' - 0" 7' - 0" F WD P-05
6-112 3' - 0" 7' - 0" F WD P-05
6-113A 3' - 0" 7' - 0" F WD P-05
6-113B 4' - 0" 7' - 0" WD P-05 2
6-113C 3' - 0" 7' - 0" F HM P-05
6-113D 6' - 0" 8' - 0" RO
6-202 3' - 0" 7' - 0" F WD P-05
6-203 3' - 0" 7' - 0" F WD P-05
6-204 2' - 8" 7' - 0" F WD P-05
6-205 3' - 0" 7' - 0" F HM P-05
6-206 4' - 0" 7' - 0" WD P-05 2
6-207 3' - 0" 7' - 0" F HM P-05
6-208 3' - 0" 7' - 0" F WD P-05
6-209 3' - 0" 7' - 0" F WD P-05
Grand total: 79
NOT TO SCALE
DOOR TYPE ELEVATIONS
XXX
NOT TO SCALE
WINDOW TYPE ELEVATIONS
1-HR
1-HR
1-HR
1-HR
1-HR
1-HR
1-HR
1-HR
1-HR
1-HR
2, 9
2, 8
2, 7
2, 8
P-13
HM P-13F3
F1
F1
ST-1
ST-1
ST-1
ST-1WD
WDP1
P1
WD
F4
HM P-13
HM P-13
NV
NOTES:
1. DOORS WITH 'X' IN THE NAME, AND SHOWN ON FLOOR PLANS AT 45 DEGREE SWING, ARE EXISTING AND SCHEDULED FOR TRACKING AND LOCATION PURPOSES. ANY NEW WORK
REQUIRED WILL BE INDIVIDUALLY NOTED IN REMARKS COLUMN.
2. EXISTING HISTORIC EXTERIOR WOOD DOORS WILL BE RESTORED AND PAINTED P-12.
3. EXISTING HISTORIC EXTERIOR WINDOWS THAT ARE BADLY DETERIORATED OR MISSING WILL BE REPLACED WITH PERIOD CORRECT REPRODUCTION WINDOWS. REFER TO
EXTERIOR ELEVATIONS.
REMARKS:
1. EXISTING DOOR, NO WORK
2. EXTERIOR DOOR; REFER TO DOOR TYPES FOR SCOPE OF WORK.
3. NEW WOOD CASED OPENING, NO DOOR.
4. RE-PAINT EXISTING WOOD DOOR AND FRAME P-13 ON ELEVATOR ALCOVE AND STAIR SIDE OF DEMISING WALL TO COORDINATE WITH NEW 4 BROAD COLOR SCHEME.
5. NEW INSULATED COILING DOOR WITH MANUFACTURER'S FACTORY PAINTED FINISH.
6. ADD PANIC HARDWARE TO EXISTING HISTORIC WOOD DOOR. COORDINATE ALL HARDWARE TO PROVIDE A COMPLETE EGRESS COMPLAINT DOOR PACKAGE.
7. RESTORE HISTORIC DOOR HARDWARE AND UPGRADE TO PROVIDE KEYED LOCKS TO MATCH ONE FACILITY MASTER KEYING SYSTEM.
8. RESTORE HISTORIC DOOR HARDWARE AND PROVIDE FLUSH BOLTS TO SECURE PAIR OF DOORS IN PLACE FROM THE INSIDE ONLY.
9. DOOR WAS RESTORED DURING PREVIOUSE RENOVATION IN 1995 AND IS A EXTERIOR EGRESS DOOR. VERIFY HARDWARE FUNCTION WITH GOVENMENT FOR ANY NEW
REQUIREMENTS.
10. REMOVE, RESTORE AND RELOCATE EXISTING HISTORIC DOOR FROM PREVIOUS LOCATION ON LEVEL 2, WEST END OF ROOM. REFER TO SHEET A4, DEMO KEYD NOTE 19.
HM HOLLOW METAL
2B-A
ST-1
ST-1WD
WDP1
P1 F1
F1
WD
WD
ST-1
ST-1
ST-1
ST-1
WD
WDP1
P1
F1
F1
WD
WD
ST-1
ST-1
1-HR
P-2WDP2
F2
HM P-2SV
1-HR
1, 7 F2
WD
WD
ST-1
ST-1
ST-1WDP2 F1 WD ST-1
F3 4
ST-1WD WD
P-7
F1
ST-1
ST-1
P2
ST-1WD WDF1P2
P-7
P-7ST-1WD WDF1P2
P-7ST-1WD WDF1P2
P-7ST-1WD WDF1P2
P-7ST-1WD WDF2
4B-R P2-D
4B-R
WD
WD
P-12 P-12
F5
F5
WD
WD
P-12 P-12
P-7ST-1WD WDF1P2
P-7ST-1WD WDF1P2
P-7ST-1WD WDF1P2
P-7
STL
WD WDF1P2
P-7WDF1
P-7WDF1
STL
STEEL
P-7ST-1WD WDF1P2
P-7ST-1WD WDF1P2
P-7ST-1WD WDF1P2-T
P-7ST-1WD WDF1P2
P-7ST-1WD WDF1P2
P-7ST-1WD WDF1P2
P-7ST-1WD WDF1P2
02-17-2023 68 158
6-002 3' - 0" 7' - 0" F HM P-06
6-010 3' - 0" 6' - 8" F 1 HR
6-101X 5' - 0" 11' - 6" 4B-D WD P-# WD P-# 1
6-102 3' - 0" 7' - 0" F WD P-06/P-05
6-102X 5' - 0" 11' - 6" 4B-D WD P-# WD P-# 1
6-103 3' - 0" 7' - 0" F WD P-05
6-103X 5' - 0" 11' - 6" 4B-D WD P-# WD P-# 1
6-104 3' - 0" 7' - 0" F
6-105 3' - 0" 7' - 0" F WD P-05
6-106 3' - 0" 7' - 0" F WD P-05
6-107 6' - 0" 7' - 0" FD WD WD
6-108 5' - 3" 10' - 0"
6-110A 5' - 3" 10' - 0"
6-111 3' - 0" 7' - 0" F WD P-05
6-112 3' - 0" 7' - 0" F WD P-05
6-113A 3' - 0" 7' - 0" F WD P-05
6-113B 4' - 0" 7' - 0" WD P-05 2
6-113C 3' - 0" 7' - 0" F HM P-05
6-113D 6' - 0" 8' - 0" RO
6-202 3' - 0" 7' - 0" F WD P-05
6-203 3' - 0" 7' - 0" F WD P-05
6-204 2' - 8" 7' - 0" F WD P-05
6-205 3' - 0" 7' - 0" F HM P-05
6-206 4' - 0" 7' - 0" WD P-05 2
6-207 3' - 0" 7' - 0" F HM P-05
6-208 3' - 0" 7' - 0" F WD P-05
6-209 3' - 0" 7' - 0" F WD P-05
Grand total: 79
1-HR
1-HR
2, 8
2, 7
2, 8
P-13
HM P-13F3
F4
HM P-13
HM P-13
NV
ST-1WD WD
P-7
F1P2
ST-1WD WDF1P2
P-7
P-7ST-1WD WDF1P2
P-7ST-1WD WDF1P2
P-7ST-1WD WDF1P2
P-7ST-1WD WDF2
4B-R P2-D
4B-R
WD
WD
P-12 P-12
F5
F5
WD
WD
P-12 P-12
P-7ST-1WD WDF1P2
P-7ST-1WD WDF1P2
P-7ST-1WD WDF1P2
P-7WD WDF1P2
P-7WDF1
P-7WDF1
STL 5
P-7ST-1WD WDF1P2
P-7ST-1WD WDF1P2
P-7ST-1WD WDF1P2-T
P-7ST-1WD WDF1P2
P-7ST-1WD WDF1P2
P-7ST-1WD WDF1P2
P-7ST-1WD WDF1P2
4-304 4-304
SV
NV
VISION PANEL AS SCHEDULED
SV P-2 / P-8
P-5
SHEANEY
Cloud
SHEANEY
Cloud
SHEANEY
Pen
SHEANEY
Text Box
REPAIR AND REPAINT
SHEANEY
Text Box ADDENDUM NO. 1, DATE: 06-06-2023, DOOR HARDWARE REVISIONS (SEE ALSO REVISED SPEC 08 06 71)
SHEANEY
Text Box
SV
SHEANEY
Text Box
SV
SHEANEY
Cloud
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Pen
SHEANEY
Cloud
SHEANEY
Cloud
SHEANEY
Pen
SHEANEY
Text Box
SHEANEY
Text Box
SHEANEY
Pen
SHEANEY
Text Box
SHEANEY
Pen
SHEANEY
Text Box
SHEANEY
Pen
SHEANEY
Text Box
SHEANEY
Text Box P-2/P-8
SHEANEY
Cloud
SHEANEY
Cloud
SHEANEY
Cloud
SHEANEY
Cloud
SHEANEY
Text Box
SV
SHEANEY
Cloud
SHEANEY
Pen
SHEANEY
Text Box
SHEANEY
Text Box
NEW SIM
SHEANEY
Text Box
SHEANEY
Text Box
SHEANEY
Pen
SHEANEY
Text Box 7B
SHEANEY
Pen
SHEANEY
Text Box 7B
SHEANEY
Text Box 2, 7
SHEANEY
Pen
SHEANEY
Text Box 2, 7
SHEANEY
Pen
SHEANEY
Polygon
SHEANEY
Text Box
SHEANEY
Polygon
SHEANEY
Text Box
SHEANEY
Polygon
SHEANEY
Text Box
SHEANEY
Cloud
SHEANEY
Cloud
SHEANEY
Polygon
SHEANEY
Text Box
SHEANEY
Cloud
SHEANEY
Polygon
SHEANEY
Text Box
SHEANEY
Polygon
SHEANEY
Text Box
SHEANEY
Polygon
SHEANEY
Text Box
SHEANEY
Cloud
SHEANEY
Polygon
SHEANEY
Text Box
SHEANEY
Polygon
SHEANEY
Text Box
SHEANEY
Polygon
SHEANEY
Text Box
SHEANEY
Text Box
SHEANEY
Pen
SHEANEY
Text Box 7A
SHEANEY
Text Box
4. PROVIDE STAIR LANDING SWINGING GATE AT STAIR 2, LEVEL 1 TO PREVENT OCCUPANTS FROM TRYING TO EGRESS TO BASEMENT LEVEL. REFER TO HAREWARE SET HW-12.
SHEANEY
Cloud
SHEANEY
Polygon
SHEANEY
Text Box
File details come from the government source that posted it. Updated .