This document contains questions and responses related to a federal solicitation for the development of an interpretive center at the Selma to Montgomery National Historic Trail in Selma, Alabama. The solicitation number is 140P2023R0022 and is being conducted by the National Park Service. Key details include specifications for wood framing and casework to meet Forest Stewardship Council chain of custody certification. Responses also provide clarification on the scope of cabinetry, countertops, windowsills, and window types required. The anticipated contract award date is July 28, 2023, with a notice to proceed contingent upon approval of preconstruction submittals within 30 days of submission.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation # 140P2023R0022 Amendment 6, SEMO 218940 Historic
Properties at 2, 4, 5, 8, and 10 Broad Street and 1119 Water Avenue in
Selma, Alabama
Request for Information and NPS Responses dated June 15, 2023
1. The bid schedule was revised with amendment 7, removing the sistering framing and the façade at 8&10. Are these items to be removed from the project or to be included in the base bid? If removed from the project, is the bracing of the façade to be included in the base bid?
a. Sistering framing and the façade at 8 & 10 are bid options 7 and 8 respectively and are not to be included in the base bid.
2. Spec section 01 81 13, 1.2 A refers to FSC wood used to make products. This
FSC requirement is only mentioned in the finish carpentry specification and casework specification referring to wood components. Please confirm since
FSC is not mentioned in the rough carpentry specifications, that FSC certification is not required for the LVLs and framing material. The cost and lead time for the framing wood products having this certification would likely far surpass any realistic expectations for the project.
a. Section 06 10 00 - Rough Carpentry
i. Add Para. 1.2. D
D. Certification of wood from sustainable forests:
1. U.S. Green Building Council (USGBC):
a. Forest Stewardship Council (FSC).
2. Rainforest Alliance:
a. SmartWood Certification.
ii. Add Para. 1.4. C and D.
C. Manufacturer Qualifications: A qualified manufacturer that is certified for chain of custody by an FSC-accredited certification body.
D. Vendor Qualifications: A vendor that is certified for chain of custody by an FSC-accredited certification body.
i. Para. 2.2.G.
G. Sustainable Material Requirements:
1. Composite Wood Products: Verify products are made using ultra-low-emitting formaldehyde resins, as defined in the California Air Resources Board's
"Airborne Toxic Control Measure to Reduce
Formaldehyde Emissions from Composite Wood
Products," or are made with no added formaldehyde.
2. Certified Wood: Certify wood products as "FSC Pure" or
"FSC Mixed Credit" in accordance with FSC STD-01-001 and FSC STD-40-004.
3. Verify adhesives have a VOC content of 70 g/L or less.
4. Verify adhesive complies with the testing and product requirements of the California Department of Public
Health's "Standard Method for the Testing and
Evaluation of Volatile Organic Chemical Emissions from
Indoor Sources Using Environmental Chambers"
Version 1.1-2010 (CA section 01350) & V1.2-2017.
a. Section 06 11 10 - Wood Framing and Sheathing
i. para. 1.3.A, add item 8, FSC Certification.
ii. Para. 2.2.A, add item 8, FSC certified.
iii. Para. 2.2.B, add item 2, FSC certified.
iv. Para. 2.2.C, add item 2, FSC certified
v. Para. 2.2.D, add item 2, FSC certified
vi. Para. 2.2.E.1, add item c, FSC certified
vii. Para. 2.2.F.1, add item b, FSC certified
viii. Para. 2.2.G.1, add item 2, FSC certified
ix. Para. 2.2.H, add item 4, FSC certified
x. Para. 2.3.A, add item 3, FSC certified
5. LVLs are manufactured in 1 ¾” increments, S5 shows a 20’ - 4 ¼” on the left side of the floor opening with a 5 ¼” on the right side. Please confirm the left side can be a 5 ¼” LVL since 4 ¼” is not available or is a 3 ½” acceptable?
a. 5 ¼ is acceptable
6. One of our LVL sources is sawing they can only combine 4 – 1 ¾” LVLs together at the plant which totals 7”. S5 calls for a 14” x 14” LVL. Please confirm we can utilize two 7” LVLs in lieu of a 14”. We could screw these together once both are set in place using screws similar to Sipson Strong-
Ties 0.276 in x 12 in strong drive SDWH timber-hex wood screws. Suggesting three (3) screws vertically, spaced approx. 24” apart from both sides.
Utilizing approx. 90 screws.
a. This is acceptable being that the screw vertically are equally spaced and distance from the edge of the member to the screw is at least 3”
7. Sheet A11, storage 6-113, shows possible cabinets. There are no casework elevations in the documents. A18 states wet bar behind coiling door. The coiling door is shown to be 8’ tall. Please confirm the wet bar is owner provided, if not please provide casework elevations. Is the countertop to be
PLAM or solid surface, both specifications exist?
a. Cabinetry and sink are in the contract. For bidding purposes, the sink is already shown on plumbing drawings. Provide 12’-4” lineal feet of
PLAM clad base cabinets in L-shape configuration with 24” deep solid surface counter tops, and 4” high back and side splashes. Typical overall height at countertop will be 34” for ABA. Provide 7’-6” lineal feet of upper wall cabinets, 30” tall by 12” deep and PLAM clad to match bases. Cabinet hardware will be soft-close concealed overlay hinges and 4” dark bronze wire pulls.
8. Spec section 12 36 63 refences solid surface windowsills while on A32, note
12 states windowsills are wood. Please confirm we are to provide wood sills to match the existing at the new windows.
a. All windowsills will be wood.
9. The drawings depict wood windows while the specifications 08 52 13 are aluminum clad windows. Are the exteriors of W6, W8, W12, and W14s to be clad or wood?
a. Spec 08 52 13 applies to all new windows only. All new replacement windows will be period correct wood profile construction and painted.
10. Are the W6, W8, and W14 windows to be stationary windows or casement windows?
a. Stationary, non-operable.
11. The specifications require the construction schedule to include 30 calendar days for approval of “action” submittals and 10 calendar days for approval of informational submittals. Please advise where we can find or provide the submittal register that addresses both types of submittals so we can correctly address the approval times in the schedule submission with the proposal.
a. Attached is the referenced submittal register.
12. Amendment 7 Factor 2 Schedule states that August 28, 2023, is the designated date for the issuance of a Notice to Proceed by NPS. For the purpose of providing an accurate schedule with the proposal that will allow compliance and timely submission of Specification Clauses 01-31-00 Para D and E please advise us of the designated date for contract award. (Issuance of the Solicitation Offer and Award)
a. NPS Current Acquisition Milestone with a Proposal due date of June
30, 2023, intends to have issuance of contract award out by July 28, 2023.
13. Specification section 01-31-00 para D Preconstruction submittals are required before NPS will issue NTP. For the purpose of locating the NTP in the schedule please clarify if the issuance of the NTP is dependent on NPS approval of preconstruction submittals 30 days after submittal.
a. Correct. The Notice to Proceed will be issued upon satisfactory completion of all Division 1 Specifications. A Contracting Officer may waive the requirement for certain items but typically will always require the following prior to issuance:
i. Bonds
ii. Insurance
iii. Schedule
iv. Schedule of Values
v. Safety Plan
vi. SF1413s for Subcontractors
vii. Superintendent Letter
viii. Historic Preservation Treatment Plan(If Historic in Nature)
14. Specification section 01-31-00 para D states the 14 items to be submitted for the preconstruction submittals. Could items 11 – Indoor Air Quality
Management Plan, 12 – Contractors Commissioning Plan, and 13 – Historic
Preservation Treatment Plan be submitted after the NTP? These items may take longer than 30 days to complete.
a. The NPS will consider issuance of the NTP prior to completion of 11 –
Indoor Air Quality and 12 Contractors Commissioning plan but will require 13 – Historic Preservation Treatment Plan.
15. Specification section 01 67 00, 1.3, A, 4 Chain of Custody documentation is required for rough carpentry material, Section 01 81 13, 1.2, A, states chain of custody certificates from forest certified by a Forest Stewardship Council accredited certificate body to comply with FSC standards. We are finding most manufactures of framing materials, LVLs, and plywood are following SFI standards, which appear to be similar to FSC and may be accredited by FSC.
See attached SFI standards and rules to see if this chain of custody acceptability.
a. SFI chain of custody certificate is acceptable. A SFI fiber sourcing certificate is not acceptable.