This document is an amendment to a solicitation for rehabilitation and seismic strengthening work at the Ahwahnee Hotel National Historic Landmark in Yosemite National Park. The amendment provides updated questions and answers to clarify the scope of work. The insulated panels and cooler units are now confirmed to be part of the contract scope, with all references to these items as not-in-contract to be disregarded. The work includes critical safety hazard corrections and rehabilitation. The period of performance is from July 2022 through June 2024. The solicitation number is 140P2022R0017 and is issued by the National Park Service for the Department of the Interior.

View the file

Other files

File Type Posted
Sol_140P2022R0017_Amd_0010.pdf PDF
B09_A9_QA_for_Amendment_No__9_0610_2022_0009.pdf PDF
Sol_140P2022R0017_Amd_0008.pdf PDF
B09_A7_140P2022R0017_0007.pdf PDF
Sol_140P2022R0017_Amd_0007.pdf PDF
B09_A6_140P2022R0017_0006.pdf PDF
B09_A6_Attach_26_Revised_Drawings_0006.zip ZIP file
B09_A6_Attach_27_Revised_Specs_0006.zip ZIP file
B09_A6_Attach_25_QA_0603_2022_0006.pdf PDF
B09_A6_Attach_28_Concessioner_Foodservice_Drawings_(NIC__for_reference_only)_0006.pdf PDF
B09_A6_attach_29_AHW_Addendum_3_West_Loggia_Photos_0006.pdf PDF
Sol_140P2022R0017_Amd_0006.pdf PDF
Sol_140P2022R0017_Amd_0005.pdf PDF
B09_A5_Attach_25_Q_Ar1_0005.pdf PDF
B09_A5_140P2022R0017_0005.pdf PDF
B09_A4_Attach_25_Q_Ar1_0004.pdf PDF
Sol_140P2022R0017_Amd_0004.pdf PDF
B09_A3_Attach_24_Revised_Specifications_0003.zip ZIP file
B09_A3_Attach_22_Pre-Proposal_Meeting_Minutes_4-27-22_0003.pdf PDF
B09_A3_Attach_21_Pre-Proposal_Attendance_Sheet_0003.pdf PDF
B09_A3_Attach_23_Revised_Drawings_0003.zip ZIP file
B09_A3_Attach_25_Q_A_0003.pdf PDF
Sol_140P2022R0017_Amd_0003.pdf PDF
B09_A3_Attach_10_ContractPriceSchedule_blank_rev05-05-2022_0003.xlsx XLSX spreadsheet
B09_A3_140P2022R0017_0003.pdf PDF
B09_A2_140P2022R0017_0002.pdf PDF
Sol_140P2022R0017_Amd_0002.pdf PDF
B09_A2_Attachment_11_Ahwahnee_Seismic_Schedule_Outline_rev_4_14_22_0002.docx DOCX document
B09_A1_Attach_12_15061_88_AHW_SEISMIC_Submittal-List_01-14-2022_0001.pdf PDF
B09_A1_Attach_2d_YOSE_154910B_AHW_SEISMIC-FINAL_CD_SET_03-30-22_0001.pdf PDF
B09_A1_Attach_2b_YOSE_154910B_AHW_SEISMIC-FINAL_CD_SET_03-30-22_0001.pdf PDF
B09_A1_Attach_14d_Ahwahnee_HSR_Final_Submittal_-_Report_0001.pdf PDF
B09_A1_Attach_14a_Ahwahnee_HSR_Final_Submittal_-_Report_0001.pdf PDF
B09_A1_Attach_2a_YOSE_154910B_AHW_SEISMIC-FINAL_CD_SET_03-30-22__0001.pdf PDF
Sol_140P2022R0017_Amd_0001.pdf PDF
B09_A1_Attach_1_YOSE_154910B_AHW_SEISMIC-FINAL_CD_SPECS_03-30-22_0001.pdf PDF
B09_Amendment_1_140P2022R0017_0001.pdf PDF
B09_A1_Attach_13_Ahwahnee_CLR_2011_0001.pdf PDF
B09_A1_Attach_14b_Ahwahnee_HSR_Final_Submittal_-_Report_0001.pdf PDF
B09_A1_Attach_17_Geotechnical_Report_Ahwahnee_Hotel_FINAL_0001.pdf PDF
B09_A1_Attach_20_REFERENCE_AHW_TEMP_KITCHEN-FINAL_CD_SET_01-14-2022_0001.pdf PDF
B09_A1_Attach_15_Ahwahnee_HSR_Final_Submittal_-_Appendices_Vol_2_0001.pdf PDF
B09_A1_Attach_18_Seismic_Eval_Degenkolb_05_10_10_0001.PDF PDF
B09_A1_Attach_16_Asbestos_rpt-kitchen_crawl_space_soil_(1)_0001.pdf PDF
B09_A1_Attach_19_REFERENCE__AHW_TEMP_KITCHEN-FINAL_CD_SPECS_01-14-2022_0001.pdf PDF
B09_A1_Attach_10_AHW_Seismic_ContractPriceSchedule_Rev_1__0001.xlsx XLSX spreadsheet
B09_A1_Attach_2c_YOSE_154910B_AHW_SEISMIC-FINAL_CD_SET_03-30-22_0001.pdf PDF
B09_A1_Attach_14c_Ahwahnee_HSR_Final_Submittal_-_Report_0001.pdf PDF
B08_Attach_5_Certification_of_Vaccination_Form_Exp220228.pdf PDF
B08_Attach_9_SubKPlanForm_REQD.doc DOC document
Show 40 more

Latest 50 of 64 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2022R0017 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

03/31/20220009

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/31/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

YOSE 154910B Ahwahnee Hotel Seismic Upgrades

Amendment 9: The purpose of this Amendment 9 makes the following changes to the solicitation:

-Provides updated Q&A:

Question: Amendment 6 revision to sheet A7.2 Kitchen Finish Schedule removed two notes

(General Finish Note #3 and note below Finish Schedules) which had indicated that the insulated panels associated with several rooms in the kitchen area shall be provided by others. This deletion conflicts with the remainder of the drawing package (various

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Joelle Mascarenas

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2022R0017/0009 elevations, sections, key notes, etc.) which still indicate that the insulated panels/ cooler units are NIC. Please confirm that all cooler units and associated refrigeration equipment are

NIC. If the NPS requires the cooler units to be part of this project, please allow the contractors to provide an allowance for this added scope of work due to the timing of the release of Amendment 6 relative to the bid due date.

Answer: The insulated panels/cooler units are part of this contract scope. Amendment 1 included revised Specifications dated 03/30/2022. Section

01 11 00 Summary of Work was revised to delete the insulated panels/cooler units from items to be "installed by the Concessioner", but the revision did not make clear that they are to be part of this contract scope. Amendment 1 included revised drawings dated 03/30/2022 that revised

Keynote 16 on A2.2, and notes on sheets A8.1 and

A8.2, but these too lacked clarity. Any references to "insulated panels/cooler units NIC" that remain on the drawings are incorrect.

Amendment 6 revisions to sheet A7.2 Kitchen

Finish Schedule are correct.

Legacy Doc #: NPS

Period of Performance: 07/01/2022 to 06/05/2024 https://www.fbms.doi.net/prsmnetprd/app_themes/pri smclassic/images/document_module_continue_image.pn g

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .