Sol_140P2022R0017_Amd_0003.pdf

PDF 90 KB Posted

Attached to
Correct Critical Safety Hazards and Rehabilitate t
Solicitation number
140P2022R0017
Issued by

About this file

This document is an amendment to a federal solicitation. The amendment makes changes to the solicitation including extending the proposal due date to May 20th, 2022 at 3:00 PM and revising the price schedule and contract clauses. The scope of work involves correcting critical safety hazards and rehabilitating the Ahwahnee Hotel National Historic Landmark in Yosemite National Park, California, including seismic strengthening. Relevant attachments such as the price schedule, drawings and specifications were also revised as part of this amendment. The National Park Service is the contracting agency, with a period of performance from July 1st, 2022 through June 5th, 2024.

View the file

Other files

File Type Posted
Sol_140P2022R0017_Amd_0010.pdf PDF
B09_A9_QA_for_Amendment_No__9_0610_2022_0009.pdf PDF
Sol_140P2022R0017_Amd_0009.pdf PDF
Sol_140P2022R0017_Amd_0008.pdf PDF
B09_A7_140P2022R0017_0007.pdf PDF
Sol_140P2022R0017_Amd_0007.pdf PDF
B09_A6_140P2022R0017_0006.pdf PDF
B09_A6_Attach_26_Revised_Drawings_0006.zip ZIP file
B09_A6_Attach_27_Revised_Specs_0006.zip ZIP file
B09_A6_Attach_25_QA_0603_2022_0006.pdf PDF
B09_A6_Attach_28_Concessioner_Foodservice_Drawings_(NIC__for_reference_only)_0006.pdf PDF
B09_A6_attach_29_AHW_Addendum_3_West_Loggia_Photos_0006.pdf PDF
Sol_140P2022R0017_Amd_0006.pdf PDF
Sol_140P2022R0017_Amd_0005.pdf PDF
B09_A5_Attach_25_Q_Ar1_0005.pdf PDF
B09_A5_140P2022R0017_0005.pdf PDF
B09_A4_Attach_25_Q_Ar1_0004.pdf PDF
Sol_140P2022R0017_Amd_0004.pdf PDF
B09_A3_Attach_24_Revised_Specifications_0003.zip ZIP file
B09_A3_Attach_22_Pre-Proposal_Meeting_Minutes_4-27-22_0003.pdf PDF
B09_A3_Attach_21_Pre-Proposal_Attendance_Sheet_0003.pdf PDF
B09_A3_Attach_23_Revised_Drawings_0003.zip ZIP file
B09_A3_Attach_25_Q_A_0003.pdf PDF
B09_A3_Attach_10_ContractPriceSchedule_blank_rev05-05-2022_0003.xlsx XLSX spreadsheet
B09_A3_140P2022R0017_0003.pdf PDF
B09_A2_140P2022R0017_0002.pdf PDF
Sol_140P2022R0017_Amd_0002.pdf PDF
B09_A2_Attachment_11_Ahwahnee_Seismic_Schedule_Outline_rev_4_14_22_0002.docx DOCX document
B09_A1_Attach_12_15061_88_AHW_SEISMIC_Submittal-List_01-14-2022_0001.pdf PDF
B09_A1_Attach_2d_YOSE_154910B_AHW_SEISMIC-FINAL_CD_SET_03-30-22_0001.pdf PDF
B09_A1_Attach_2b_YOSE_154910B_AHW_SEISMIC-FINAL_CD_SET_03-30-22_0001.pdf PDF
B09_A1_Attach_14d_Ahwahnee_HSR_Final_Submittal_-_Report_0001.pdf PDF
B09_A1_Attach_14a_Ahwahnee_HSR_Final_Submittal_-_Report_0001.pdf PDF
B09_A1_Attach_2a_YOSE_154910B_AHW_SEISMIC-FINAL_CD_SET_03-30-22__0001.pdf PDF
Sol_140P2022R0017_Amd_0001.pdf PDF
B09_A1_Attach_1_YOSE_154910B_AHW_SEISMIC-FINAL_CD_SPECS_03-30-22_0001.pdf PDF
B09_Amendment_1_140P2022R0017_0001.pdf PDF
B09_A1_Attach_13_Ahwahnee_CLR_2011_0001.pdf PDF
B09_A1_Attach_14b_Ahwahnee_HSR_Final_Submittal_-_Report_0001.pdf PDF
B09_A1_Attach_17_Geotechnical_Report_Ahwahnee_Hotel_FINAL_0001.pdf PDF
B09_A1_Attach_20_REFERENCE_AHW_TEMP_KITCHEN-FINAL_CD_SET_01-14-2022_0001.pdf PDF
B09_A1_Attach_15_Ahwahnee_HSR_Final_Submittal_-_Appendices_Vol_2_0001.pdf PDF
B09_A1_Attach_18_Seismic_Eval_Degenkolb_05_10_10_0001.PDF PDF
B09_A1_Attach_16_Asbestos_rpt-kitchen_crawl_space_soil_(1)_0001.pdf PDF
B09_A1_Attach_19_REFERENCE__AHW_TEMP_KITCHEN-FINAL_CD_SPECS_01-14-2022_0001.pdf PDF
B09_A1_Attach_10_AHW_Seismic_ContractPriceSchedule_Rev_1__0001.xlsx XLSX spreadsheet
B09_A1_Attach_2c_YOSE_154910B_AHW_SEISMIC-FINAL_CD_SET_03-30-22_0001.pdf PDF
B09_A1_Attach_14c_Ahwahnee_HSR_Final_Submittal_-_Report_0001.pdf PDF
B08_Attach_5_Certification_of_Vaccination_Form_Exp220228.pdf PDF
B08_Attach_9_SubKPlanForm_REQD.doc DOC document
Show 40 more

Latest 50 of 64 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2022R0017 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

03/31/20220003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/31/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

YOSE 154910B Ahwahnee Hotel Seismic Upgrades

Amendment 3: The purpose of this Amendment 3 makes the following changes to the solicitation(Changes are highlighted on the Contract Clauses in Green below):

Changes the proposal due date to May 20, 2022 at 1500 PD

-Section B: Contract Price Schedule: Revised to change which items are apart of the Base price and which items are options.

-Section H: SPECIAL REQUIREMENT 1: Changed the clause from 60 days to 180 days as noted below:

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Joelle Mascarenas

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 53

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2022R0017/0003

OPTION FOR ADDITIONAL SERVICES SEPARATELY PRICED

LINE ITEMS

The Government may require the delivery of the numbered line items identified in the Schedule as option items at the price stated in the Schedule.

The Contracting Officer may unilaterally exercise the option by written notice to the Contractor within 180 days after contract award.

Performance of added line item tasks shall be at the price negotiated in the contract Schedule.

-The following attachments have been revised:

-Attachment 10- Blank Price Schedule Revised

-Attachment 23- Revised Drawings (Revise references to options, clarify scope of "rehab wood elements")

-Attachment 24- Revised Specifications (Revise description of work, other references to options)

The following attachments are added via this modification

-Attachment 21- Pre-proposal Attendance Sheet

-Attachment 22- Pre-proposal Meeting Minutes

-Attachment 25- Q&A

Legacy Doc #: NPS

Period of Performance: 07/01/2022 to 06/05/2024 https://www.fbms.doi.net/prsmnetprd/app_themes/pri smclassic/images/document_module_continue_image.pn g

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .