E2.4_-_VC_Exhibit_Design_Part4.pdf
PDF 19 MB Posted
- Attached to
- Pullman National Monument, PULL 223195-253045 Federal contract opportunity
- Solicitation number
- 140P2019R0048
About this file
This pre-solicitation notice describes a planned small business set-aside solicitation for construction services at Pullman National Monument in Chicago, Illinois. The National Park Service seeks to stabilize the Administration Building and construct a new Visitor Center, with work including masonry repairs, structural reinforcement, new finishes, mechanical and electrical systems, and interpretive exhibits. The total budget range is $5-10 million and the period of performance is from September 2019 through August 2020. Interested small businesses must be certified in SAM.gov and have a DUNS number to bid. The NAICS code is 236220 with a $36.5 million size standard. The solicitation is expected to issue on or around July 18, 2019 and require both technical and price proposals for a negotiated firm-fixed price contract award.
VC Exhibit Design, Part 4 of 4
View the file
Other files for this federal contract opportunity
Show all 50
Pullman National Monument, PULL 223195-253045 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P R O J E C T:
Pullman National Monument
D R AW I N G S :S C A L E :P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I July 26, 2019
68Pullman Porters Arch & Column Cover DetailScale = 3/8" = 1'-0"
Plan - Porters Arch Scale: 3/8" = 1'-0"
14'-4 1/8"
13'-4 1/8"
R 6 1/8"
0 1 2 FT
Elevation - Porters Arch Scale: 3/8" = 1'-0"
/4
/8
Ø55'-10 1/2"
3D LETTERS
CNC CUT FROM 1" MDF
PIN MOUNTED TO UPPER / LOWER TUBES
PAINTED
CUSTOM POSTS
12" PVC TUBE
W/ CNC CUT CAP PLATE
CUSTOM CONICAL BASE
BOLTED TO FLOOR INTERNALLY
PAINTED
ARCH TUBE ASSEMBLY
1 1/2" SQ. ALUMINUM TUBE
ROLLED & WELDED TO POST MOUNTING
PLATES
BOLTED TO POSTS
W/ 1/2-13 HEX BOLTS INTO INTERNAL
BLOCKING
PAINTED
BUY OUT SCONCE
W/ FUNCTIONING LIGHT
BOLTED TO POST
PAINTED
/8
0 1 2 FT
Isometric
LP
3.1
LP
3.1
LP
3.1
LP
3.1
PORTERS ARCH & COLUMN DETAIL
ELEVATION - Section 09.01 Scale: 1/2" = 1'-0"4 0 1 2 3 4 FT
15 1
7 8
PROMPT QUESTION CAN BE CHANGED HERE?
SLIDING LETTERS FOR CUSTOMIZABLE PROMPTS?
NORTH EAST SOUTH WEST
TRAIN
TRAIN
TRAIN
TRAIN
P O S T Y O U R
T H O U G H T S
WHAT IS PULLMAN’S
LEGACY?
60"
This neighborhood is home to thousands of Chicagoans who have largely retained the unique look created by Solon Spencer Beman.
Contemporary labor leaders continue to discuss the lessons of the Pullman strike. George Pullman’s last name remains synonymous with luxury and comfort. The Pullman porters established greater opportunities for their children and grandchildren. What does
Pullman mean to you?
TTHE PULLMAN LEGACY
CONTINUES, EVEN THOUGH THE
COMPANY NO LONGER EXISTS.
I M A G E P A N E L S In 2015, Method and Ecover opened the doors to a brand new $30 million plant near Pullman National Monument. The opening of the new facility was significant, considering Pullman’s long legacy of manufacturing. The Method plant was the first new factory to be built on the South Side in nearly 30 years. Like the Pullman Company, Method collocated supplies within its planned manufacturing complex.
In 1981, the United Steelworkers Local 1834 union tried to keep the Pullman Company from shutting down its operations in Pullman, which would put several hundred people out of work. This image is a still from The Last Pullman Car, a documentary that focuses on the workers’ reactions as elected officials, the company, and the national union failed to help them keep their jobs.
On February 19, 2015, President Barack Obama signed a proclamation establishing Pullman National Monument. Former First Lady Michelle Obama is a descendant of a Pullman porter.
Pullman Hotels and Resorts is a brand of international hotels named after the Pullman Company. Though they are unaffiliated with the town of Pullman or the Pullman Company, this resort chain continues to market luxury to its guests. Advertising materials prompt guests to live the “Pullman Life.”
The Latino Union of Chicago collaborates with low-income immigrant and US-born workers to improve social and economic conditions. Their Immigrant & Worker Action Project empowers day laborers and household workers to organize for policy changes that improve their lives.
This city’s labor struggles are not just a thing of the past. In 2010, Chicago Federation of Labor (CFL) President Dennis Gannon worked to get Walmart to agree to a Community Benefits Agreement. Under this arrangement, Walmart would have agreed not just to a minimum wage, but also to hire local workers and to take steps to protect the environment. The CFL ultimately stopped supporting the effort due to pressure from city leadership.
GL-09.01-200
GL-09.01-000
THOUGHTS
P O S T Y O U R
WHAT HAS THIS EXHIBIT
MADE YOU THINK OR FEEL?
Please write your comments, questions, answers, or any other thoughts you may have and place your card on this message board.
GL-09.01-400
ELEVATION - Section 09.01 Scale: 1/2" = 1'-0"4 0 1 2 3 4 FT
15 1
7 8
PROMPT QUESTION CAN BE CHANGED HERE?
SLIDING LETTERS FOR CUSTOMIZABLE PROMPTS?
TRAIN
TRAIN
TRAIN
TRAIN
P O S T Y O U R
T H O U G H T S
PULLMAN EXPERIMENT
REFLECT ON THE
60"
THOUGHTS?
WHAT ARE YOUR
Please share your thoughts and place your card on this message board.
GL-09.01-400 / 100% size / 39" w x 13" h
This neighborhood is home to thousands of Chicagoans who have largely retained the unique look created by Solon Beman. Contemporary labor leaders continue to discuss the lessons of the Pullman strike. George Pullman’s last name remains synonymous with luxury and comfort. The Pullman porters established greater opportunities for their children and grandchildren. What does Pullman mean to you? How does the history here affect your life today? And what legacies of the Pullman story still resonate?
THE PULLMAN LEGACY
CONTINUES, EVEN THOUGH THE
COMPANY NO LONGER EXISTS.
I M A G E P A N E L S In 2015, Method and Ecover opened the doors to a new $30 million plant near Pullman National Monument. The opening of the new facility was significant, considering Pullman’s long legacy of manufacturing. The Method plant was the first new factory to be built on the South Side in nearly 30 years. Like the Pullman Company, Method collocated supplies within its planned manufacturing complex.
Companies, including Facebook and Google, have continued to expand on Pullman’s urban planning idea of a company town.
Both A. Philip Randolph and the Brotherhood of Sleeping Car Porters played major roles in the struggle for racially equality. The BSCP helped shape a black middle class in the United States and fueled the Great Migration of African Americans from the rural South to cities in the North and Midwest. During the Civil Rights Movement, BSCP members were seasoned organizers and established national networks of communication among activist groups. A. Philip Randolph, seen here with Martin Luther King Jr. and President Dwight Eisenhower, remained a leader in the movement and helped organize the 1963 March on Washington.
On February 19, 2015, President Barack Obama signed a proclamation establishing Pullman National Monument. Former First Lady Michelle Obama is a descendant of a Pullman porter. Activists and community members, many of whom were also descendants, have worked for decades to see the architecture and history of the community preserved. These decisions have prevented new developments, including affordable housing complexes, from being built in the community.
Pullman Hotels and Resorts is a brand of international hotels named after the Pullman Company. Though they are unaffiliated with the town of Pullman or the Pullman Company, this resort chain continues to market luxury to its guests. Advertising materials prompt guests to live the “Pullman Life,” pulling from the name Pullman branded to be synonymous with luxury and ease.
Just six days after the Pullman Strike’s end, Congress and President Grover Cleveland passed legislation designating Labor Day a federal holiday in honor of the contributions of the labor movement. This city and nation’s labor struggles, however, continued. In 1937 Chicago Police violently broke up union picnic. A. Philip Randolph continued to advocate for workers’ rights, organizing a March on Washington in 1941 (seen here). Today, unions and employers continue to renegotiate their relationship.
The Latino Union of Chicago collaborates with low-income immigrant and US-born workers to improve social and economic conditions. Their Immigrant & Worker Action Project empowers day laborers and household workers to organize for policy changes that improve their lives.
Many immigrants to Pullman and Chicago today face the same challenges as those of previous decades—securing affordable housing, finding a job with livable wages, and combatting negative perceptions.
GL-09.01-000 / 100% size / 24" w x 45" h
P R O J E C T:
Pullman National Monument
D R AW I N G S :S C A L E :P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I July 26, 2019
69Scale = As Noted Section 9 / Legacy Color Elevation
Train schedule reference for thematic bulletin board
Example of changeable marquee letters / potentially for prompt questions
Simple atypical area panel with embedded group image label
Rows could be included for inserting changeable billboard letters so Park can customize prompt questions? Maybe?
Thematic ‘train schedule’ bulletin board / open access where visitors can slip cards under the edges of the board’s framework
Painted wall
Large title / die-cut vinyl type
Reader rail with rail-like posts / includes angled surface for writing, inset cubby for blank cards, fixed pens, and catch rail along bottom edge
Image panel collage all with the same dimensions to give equal weight to each image
Large title / die-cut vinyl type
COLOR ELEVATION
IMAGE NEEDED
Plan - Typical Train Railing Scale: 1" = 1'-0"
4'-2"
/2
/4
/8
3'-6"
/8
0 6 12 IN
5" 6 5/8"
3'-3" GRAPHIC
CARD SLOT
Elevation - Typical Train Railing Scale: 1" = 1'-0"
0 6 12 IN
Isometric - Typical Train Railing
Section Scale: 1 1/2" = 1'-0"
10 7/8"
1'-4
60.00°
/4
HPL GRAPHIC
BOTTOM EDGE CHAMFERED
EDGES & BOTTOM PAINTED
FLOOR MOUNTING PLATE
BOLTED TO FLOOR
W/ 1/2-13 HEX BOLTS
INTO HILTI DROPINS
PAINTED
FAUX RAILROD RAIL POSTS
LAYERS OF 1" MDF
SCULPTED, HARD COATED & PAINTED
CROSS TUBE & MOUNTING PLATE
1X3 ALUMINUM RECT TUBE
BOLTED TO POSTS
W/ GRAPHIC MOUNTING WELDED TO TOP OF
TUBE
AND BOLTED TO UNDERSIDE OF GRAPHIC
PAINTED
0 3 6 IN
PENCIL LIP
1 1/2 X 2 X 1/8 ALUMINUM ANGLE
SCREWED ONTO BOTTOM FACE
PAINTED
CARD POCKET
BUILT INTO RAIL
1'-1
GRAPHIC
ALL SURFACES PAINTED TO CLOSE MATCH
MATTHEWS CAST BRONZE MP7458
3/4" CHAMFER @ CORNERS
PP-1
P R O J E C T:
Pullman National Monument
D R AW I N G S :S C A L E :
Scale = As Noted
P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I July 26, 2019
70Typical Train Rail Reader Rail Detail
READER RAIL DETAIL
D R AW I N G S :S C A L E :P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I July 26, 2019
71Scale = N/A
TACTILE MAP / SKETCHES
DETAIL
Tactile Map / Sketches
Flat-mounted or tabletop exhibits to be touched or closely approached, such as relief maps and tactile exhibits, shall allow for a clear knee space that is a minimum of 36 inches wide and 27 inches clear height above the floor surface.
California State Parks Accessibility Guidelines Figure 18-1, Flat mounted Tactile Exhibit
PAINTED ETCHED ZINC
Viable locations:
• Outdoors (not in harsh weather environments: wind blown sand, sea spray)
• Indoors
Cost: about 30-40% less than bronze
Maintenance/Durability:
• outdoor (not harsh weather, under cover is best) can last about 5 years until needing a little paint maintenance
“ Can barely read our outdoor panels after 7 years in full sun, however, under cover zinc looks nearly new.”
—NPS Chief of Cultural and Natural Resources
“ map in South Kensington installed four 4 years (in full sun a few hours a day) paint color is still good…only minor finger wear on some parts” —Owner of a tactile map company
• paint can sometimes scratch
• Paint used is called Chromodex (like automotive, but comes in a wide range of Pantone colors):
small touch up tins of paints could be supplied to client for dealing with small scratches; lacquer coat is applied on top.
• Use solvent-free cleaning materials
Total Depth: 3/32” deep, but can bond layers together to create more depth
Color: Full color
Proposed area covered by tactile map
Total Depth: can create full 3D poured (solid) or hollow
Color: 2-tone (polished, not polished), will patina over time;
areas where visitors touch a lot will becoming shiny/polished
Maintenance/Durability:
• Most durable
• Minimal maintenance
• Greatest longevity
“Bronze, no matter where we have it, rocks.”
—NPS Chief of Cultural and Natural Resources
BRONZE (for buildings applied to tactile map)
COLOR AND FINISH SCHEDULE REVISION DATE: 7/26/19
GOV - US Government EXH FAB - Exhibit Fabricator
CODE MATERIAL COLOR FINISH SIZE SUB PROD# MANUFACTURER SOURCE LOCATION COMMENTS
PAINTS
LP-P Latex Primer Harmony Primer BOTH B11W01500 Sherwin Williams Walls w/ Exhibit Murals LP-1 Latex Paint Believable Buff Flat BOTH SW 6120 Sherwin Williams Wall Paint
LP-1.2 Latex Paint Leisure Blue Satin EXH FAB SW6515 Sherwin Williams Blue Gray Frames LP-1.3 Latex Paint Respite Satin EXH FAB SW6514 Sherwin Williams Light Blue Inset LP-2 Latex Paint Sassy Green Flat BOTH SW6416 Sherwin Williams Green Walls
LP-2.1 Latex Paint Rookwood Red Satin EXH FAB SW2802 Sherwin Williams Red Columns / Accent LP-2.2 Latex Paint Renwick Olive Satin EXH FAB SW2815 Sherwin Williams Green Case / Accent LP-3 Latex Paint Respite Flat BOTH SW6514 Sherwin Williams Wall Paint
LP-3.1 Latex Paint Down Pour Satin EXH FAB SW6516 Sherwin Williams Blue Columns LP-3.3 Latex Paint Grizzle Gray Satin EXH FAB SW7068 Sherwin Williams Gray Station Sign LP-4 Latex Paint Pullman Brown Satin BOTH Custom Mix Sherwin Williams Train Exterior / Accent HEX #644117 / RGB 100/65/23
POWDER
PP-1 Powdercoat Paint Cast Bronze EXH FAB MP7458 Matthews Paint Reader Rail & Stanction Metal Components PP-2 Powdercoat Paint Gold Foil Metallic EXH FAB MP20354 Matthews Paint Picture Frames Faux Gold Leaf PP-3 Powdercoat Paint Grey Metallic EXH FAB MP18170 Matthews Paint Graphic Frames Gears, Trucks, Pulleys
WOOD
WD-1 Red Oak Beechwood Satin EXH FAB SW 3132-K Sherwin Williams Scenic Platforms WD-2 Reclaimed Wood Clear Satin EXH FAB Exh Fab Source Scenic Elements WD-3 Birdseye Maple Warm Chestnut Satin EXH FAB SW3114-K Sherwin Williams Main & Graphic Frames
LAMINATE
PL-1 Plastic Laminate Natural Beige Textured EXH FAB S2063T Nevamar Case Interiors PL-2 Plastic Laminate Concrete Stone Honed EXH FAB 7267-77 Formica Tactile Map Base
GLASS
GL-1 Safety Glass Clear 3/8" EXH FAB Exh Fab Source Large Artifact Cases Laminated Glass GL-2 Safety Glass Clear 1/4" EXH FAB Exh Fab Source Wall Graphics Laminated Glass
ACRYLIC
AC-1 Acrylic Clear - Non Glare 1/8" EXH FAB Exh Fab Source Graphic Panels
WALL BASE
WB-1 1/8" Vinyl Wall Base Fudge Toe 6" EXH FAB 167 Johnsonite Exhibit Kicks & Walls
FLOORS
FC-1 Modular Carpet Sediment Random 12" x 36" GOV 856 Mohawk Digital Terrain Exhibit Galleries FC-2 Modular Carpet Sediment Random 12" x 36" GOV 856 Mohawk Seismic Wave Exhibit Galleries FC-3 Modular Carpet Sediment Random 12" x 36" GOV 856 Mohawk Gravitational Exhibit Galleries FC-4 Broadloam Historic Pattern Custom Plush EXH FAB TBD Palace Train Car Scenic Element
Revised or Added for PD 1
P R O J E C T:
Pullman National Monument
D R AW I N G S :S C A L E :P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I July 26, 2019
72Scale = N/A Color & Finish Schedule
D R AW I N G S :S C A L E :P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I
73Color & Finish Sample BoardScale = N/A
D R AW I N G S :S C A L E :P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I July 26, 2019
74Scale = NA Historic Pullman Color Matches
COLOR MATCHES
SHERWIN-WILLIAMS PAINT (closest matches)
PARK-PROVIDED PAINT SAMPLES
PANTONE COLORS (closest matches)
Pantone 7610 C
SW 2802 Rookwood Red SW 2815 Renwick Olive SW 6167 Garden Gate
Pantone 451 C Pantone 5743 U
EXISTING SPACE / SITE PHOTOS
Pullman National Monument
D R AW I N G S :S C A L E :P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I July 26, 2019
75Scale = N/A Existing Space / Site Photos
• Light streams into the exhibit space through the western and northern windows.
Consider taking steps to minimize outside light, while trying not to completely cover the grand window structures.
• Exhibits will have to work around and/or incorporate the posts that run down the center of the space.
• Consider which entryways can be closed off or opened up for access to the exhibit and retail areas.
• Define an area for the desk near the entryway, and leave room for the museum store and storage areas.
• The interior of the building is not considered “sacred.” We can attach to walls.
• The ceiling of the corridor space will drop down to accommodate additional floor space upstairs.
• Despite the additional floor, ceiling height will still be tall enough for projected imagery.
Our designs will utilize the dramatic height of the building’s interior spaces.
EXHIBIT SPACE CORRIDOR SPACE TEXTURES
ARCHITECTURAL MODIFICATIONS
Pullman National Monument
D R AW I N G S :S C A L E :P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I July 26, 2019
76Scale: 1/8" = 1'-0" Plan / Architectural Modifications & New Walls M1.1C3.1
SCALE DRAWINGSPROJECT PHASE
T H E D E S I G N M I N D S, I N C.C
National Park Service - Pullman National Monument Concept Design As noted Exhibit Plan (Clean) 01.20
0 1 2 3 4 FT
PLAN - Architectural Modifications Scale: 1/8" = 1'-0"
15'-6"
21'-8"
7'-7"
ARCHITECTURAL MODIFICATION NOTES
REMOVE PATCH BRICKWORK FROM EXISTING WINDOW OPENING,
EXPAND HEIGHT THE OF OPENING TRIM INTERIOR AND INSTALL
FRAMED GLASS WINDOW. TYPE OF WINDOW TBD. BY
GOVERNMENT
A. ALUMINUM FRAME WITH SINGLE PANE OF GLASS.
B. REPRODUCTION OF WOOD WINDOW THAT WOULD HAVE BEEN
IN THIS LOCATION.
REQUESTING A ROLL DOWN SECURITY GRATE FOR EXHIBIT HALL
ENTRANCE. (BY GOVERNMENT)
REQUESTING WINDOW BLINDS TO BE INSIDE MOUNTED ON ALL
OF THE EXISTING WINDOW OPENINGS. TO BE DETERMINED IF
THEY WILL BE OPAQUE OR TRANSLUCENT. (BY GOVERNMENT)
REQUESTING PLYWOOD BLOCKING BEHIND ALL NEW GWB WALLS.
GWB WALLS TO BE LEVEL FIVE FINISH, PRIMED AND PAINTED PER
COLOR SCEDULE BY EXHIBIT DESIGNER. (BY GOVERNMENT)
REQUESTING GLASS DOORS WITH MINIMAL PUSH PLATE
HARDWARE. EXHIBIT FABRICATOR TO INSTALL
SEMI-TRANSPARENT GRAPHIC FILM TO GLASS WHICH SHOWS
HISTORIC IMAGE OF THE MANUFACTURING SPACE, BUT
TRANSPARENT ENOUGH TO SEE EXISTING CONDITIONS.
NEW EXHIBIT PARTITIONS: 6" WIDE BY 12'-0" HIGH METAL STUD
FRAME WITH 3/4" PLYWOOD BLOCKING AND FINISHED WITH GWB,
LEVEL 5 FINISH, PRIMED AND PAINTED PER EXHIBIT DESIGN
COLOR SCHEDULE. (BY GOVERNMENT)
REQUESTING UNISTRUT ABOVE THE NEW OPEN CELL GRID
CEILING TO PROVIDE SUPPORT FOR HANGING SCENIC DRIVE
SHAFT AND BELT PULLIES ABOVE THE EXHIBIT PYLONS & FAUX
BRICK ARCHES OVER THE TACTILE MAP TABLE. SEE REFLECTED
CEILING DRAWING FOR DETAILS.
REMOVED REQUEST FOR TROUGHS IN NEW CONCRETE
FLOOR FOR ACTIVE ARTIFACT CASE CONDITIONING SYSTEM
EXHIBIT FABRICATOR TO VERIFY EXISTING DIMENSIONS
AND CONDITIONS PRIOR TO FABRICATION
LP-2
LP-P
LP-P
LP-P
LP-P
LP-P
LP-P
LP-P
LP-1
LP-1
LP-P LP-P
LP-3
LP-3
LP-1
LP-3
LP-P
LP-P
LP-3
WALLCOVERING MURAL WALLCOVERING MURAL
WALLCOVERING MURAL
WALLCOVERING MURAL
WALLCOVERING MURAL
LP-1
D R AW I N G S :S C A L E :P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I July 26, 2019
77Scale: 1" = 1'-0" New Wall Details
Section - 6" Wall Scale: 1" = 1'-0"
6 3/8"
3 5/8"
3/4" PLY
5/8" GYP W/ LEVEL 5 FINISH
3.625" STUD
S E
E E
L E
C T
R
IC
A L P
L A
N F
O R
A F
F
INSET POWER / SIGNAL BOX
TYPICAL FOR ALL WALL MONITOR LOCATIONS
6" VINYL WALL BASE
ALL WALL OUTLETS AND PLATES TO BE IVORY
Section - Furred out walls Scale: 1" = 1'-0"
3/4" PLY
5/8" GYP W/ LEVEL 5 FINISH
7/8"
FURRING
STRIPS
EXISTING WALL
6" VINYL WALL BASE
WB-1 WB-1
SEE EXHIBIT PLAN FOR WALL COLORS
NEW WALL DETAILS
NEW WALL CONSTRUCTION AND
FINISHING BY GOVERNMENT
ELEVATION - 00.00 Carriageway - North Wall Scale: 3/16" = 1'-0"
0 1 2 3 4 FT
4'-0"
REMOVE PATCH BRICKWORK FROM
WINDOW OPENING, ENLARGE OPENING
AND INSTALL FRAMED GLASS WINDOW. BY
GOVERNMENT (SEE ARCHITECTURAL
MODIFICATIONS PAGE FOR OPTIONS)
WELCOME DESK (NIC)EXHIBIT ENTRANCE RETAIL ENTRANCE
EXPOSED BRICK
NOTE: DIMENSIONS ARE BASED ON ARCHITECTURAL DRAWINGS
FOR THE BUILDING RENOVATION PROJECT. EXHIBIT FABRICATOR
IS RESPONSIBLE TO CONFIRM ALL DIMENSIONS ON SITE.
EXPOSED BRICK CORNICE
MASONRY BASE
EXISTING LINES OF STAINED BRICK
ROLL DOWN SECURITY GATE
FOR EXHIBIT GALLERY
ENTRANCE (OVERHEAD
MECHANISM ON GALLERY
SIDE) BY GOVERNMENT
ELEVATION - 00.00 Carriageway - South Wall Scale: 3/16" = 1'-0"
EXPOSED BRICK
EXPOSED BRICK CORNICE
MASONRY BASE
RESTROOMS & OFFICES
EXISTING WINDOW OPENING - TO BE FILLED IN
WITH MATCHING BRICK - RECESS FILL BRICK TO
LEAVE ALCOVE IN WALL - BY GOVERNMENT
ARCHITECTURAL MODIFICATIONS
P R O J E C T:
Pullman National Monument
D R AW I N G S :S C A L E :P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I
78Elevations / Carriageway Interior Walls / Architectural ModificationsScale: 3/16' = 1'-0"
M1.1C3.1
SCALE DRAWINGSPROJECT PHASE
T H E D E S I G N M I N D S, I N C.C
National Park Service - Pullman National Monument Concept Design As noted Elevations 02.00
North Elevation Scale: 1/8" = 1'-0"
2'-11"
99'-6"
N E
W D
R O
P C
E
IL
IN
G
GWB PRIMED & PAINTED
BY GOVERNMENT
64'-2" 30'-0"
8'-1" 3'-1" 4'-11" NEW WALLS AND PARTITIONS BY GOVERNMENT
NEW GLASS DOORS AND FIRE
ROLLDOWN DOOR BY GOVERNMENT
WESTWest Elevation Scale: 1/8" = 1'-0"
1 0 1 2 3 4 FT
8'-2" 4'-6" 4'-3" 18'-8" 4'-2"
N E
W D
R O
P C
E
IL
IN
G
39'-9"
N E
W C
E
IL
IN
G
GWB PRIMED & PAINTED
ARCHITECTURAL MODIFICATIONS
P R O J E C T:
Pullman National Monument
D R AW I N G S :S C A L E :P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I
79Scale: 1/8" = 1'-0" Elevations / Interior Walls / Architectural Modifications
M1.1C3.1
SCALE DRAWINGSPROJECT PHASE
T H E D E S I G N M I N D S, I N C.C
National Park Service - Pullman National Monument Concept Design As noted Elevations 02.10
SOUTHSouth Elevation Scale: 1/8" = 1'-0"
N E
W D
R O
P C
E
IL
IN
G
2'-4"3'-11"6'-4"22'-7"4'-0"7'-10"4'-1"6'-3"
99'-2"
GWD PRIMED
& PAINTED BY
GOVERNMENT
REMOVE PATCH BRICKWORK FROM WINDOW
OPENING AND INSTALL FRAMED GLASS
WINDOW. (SEE ARCHITECTURAL
MODIFICATIONS PAGE FOR OPTIONS)
EXHIBIT ENTRANCE -
GOVERNMENT TO PROVIDE
ROLL DOWN SECURITY GATE
10'-4"
OPENING FOR COMBINED
WELCOME & RETAIL SERVICE
DESK - BY GOVERNMENT
EASTEast Elevation Scale: 1/8" = 1'-0"
0 1 2 3 4 FT
N E
W D
R O
P C
E
IL
IN
G
39'-1"
19'-2" 20'-0"
RETAIL SPACE
6" 3'-4"
N E
W C
E
IL
IN
G
H E
IG
H
T
CARRIAGEWAY
GWB PRIMED
& PAINTED BY
GOVERNMENT
ARCHITECTURAL MODIFICATIONS
P R O J E C T:
Pullman National Monument
D R AW I N G S :S C A L E :P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I
80Scale: 1/8" = 1'-0" Elevations / Interior Walls / Architectural Modifications
UNIVERSAL DESIGN / ACCESSIBILITY
Pullman National Monument
D R AW I N G S :S C A L E :P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I July 26, 2019
81Scale = N/A
The design presented in this package provides universal design concepts that allow visitors of all ages and abilities to experience the exhibits. Using a variety of design approaches, mechanical and tactile interactives, and assistive technology, we ensure that the exhibit’s goals and themes will be accomplished for all visitors.
Our design will ensure all relevant laws, including the Architectural Barriers Act and Sections 504 and 508 of the Rehabilitation Act, are followed.
Every exhibit component is physically accessible to all visitors, with routes into, within, and out of the exhibit space.
Using the principles of universal design, our plans each incorporate exhibit elements that appeal to touch, sight, and sound. All mechanical interactives will adhere to requirements for heights, reach ranges, weight, and required force to operate.
A full accessibility report was provided as a separate component of the Schematic Design II package. As we continue to develop our approach to the visitor center, the principals outlined here will remain front and center.
The following page provides locations of elements that provide tactile opportunities for all visitors to interact with the exhibits. The page also demonstrates adherence to accessible clearances.
TOUCH
Focused Array Speakers
Tactile tools
Audio player w/ speaker, sounds activated when box lid is opened
Tactile textures
Simple interactives
• Reproduction tools and dinnerware, wood, metallic elements, models
• Flip panels that reveal additional information
• Fabrics—bedding, seat covers
• Tactile maps
• Images in relief and raised outline drawings
• First-person accounts (Pullman porter film and perspectives video)
• Ambient soundscapes (manufacturing noises)
• Conversations between passengers and porters (Pullman car immersive projection)
Universal Design / Accessibility
Architectural details in relief
Audio handsets
HEAR
UNIVERSAL DESIGN / ACCESSIBILITY
Pullman National Monument
D R AW I N G S :S C A L E :P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I July 26, 2019
82Plan / Architectural Modifications / ADA Clearance Scale: 1/8" = 1'-0" M1.1C3.1
SCALE DRAWINGSPROJECT PHASE
T H E D E S I G N M I N D S, I N C.C
National Park Service - Pullman National Monument Concept Design As noted Exhibit Plan (Clean) 01.20
0 1 2 3 4 FT
PLAN - ADA CLEARANCE
Scale: 1/8" = 1'-0"
6'-9"
96"
60"
60"60"
60"60"
60"60"
60"
60"
60"
36"
NO
ACCESS
NO
ACCESS
96"
60"
60"
96"
36" ONE WAY CLEARANCE
TWO PERSON SIDE BY SIDE CLEARANCE
AND WHEELCHAIR ROTATION RADIUS
PARK REQUESTED CIRCULATION CLEARANCE
FOR PULLMAN CAR SCENIC ELEMENT
EXHIBIT
ENTRANCE
WOOD PLANK "RAMP" DIRECTLY ON FLOOR
WITH TRANSITION STRIPS (1/4" MAX RISE IN
ELEVATION)
3'-6"
NOT AN
EXIT
60"
60"
BENCH
BENCH
60"
BENCH
TACTILE
EXHIBIT MAP
TACTILE
SITE MAP
MONITOR
NIC
60"
60"
72"
4'-3"
3'-0"
TACTILE
TABLE
SETTING
TACTILE FEATURES
EXHIBIT FABRICATOR TO VERIFY EXISTING DIMENSIONS
AND CONDITIONS PRIOR TO FABRICATION
Pullman National Monument
D R AW I N G S :S C A L E :P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I July 26, 2019
83Plan / Architectural Modifications / Preliminary Electrical & AV ElementsScale: 1/8" = 1'-0" M1.1C3.1
SCALE DRAWINGSPROJECT PHASE
T H E D E S I G N M I N D S, I N C.C
National Park Service - Pullman National Monument Concept Design As noted PLAN - Electrical and AV 01.20
0 1 2 3 4 FT
PLAN - Architectural Modifications - Electrical & AV Scale: 1/8" = 1'-0"
3'-0"
13'-0" 16'-0" 16'-0" 16'-0"
J
J
SYMBOL KEY
J
WALL OUTLET - DEDICATED LIGHTING CIRCUIT
CEILING OUTLET - DEDICATED LIGHTING CIRCUIT
JUNCTION BOX - DEDICATED LIGHTING CIRCUIT
WALL OUTLET - DEDICATED AV CIRCUIT
CEILING OUTLET DEDICATED AV CIRCUIT
NETWORK CONNECTION - AV REMOTE ACCESS
NOTES
JUNCTION BOX FOR ALL PULLMAN CAR SCENE INTERNAL
LIGHTING (BY EXHIBIT FABRICATOR) SEE LIGHTING PLAN
JUNCTION BOX FOR WALL MOUNTED 2 CIRCUIT LIGHTING
TRACK AND OUTLET FOR THEMED WORK LIGHT. TRACK
CIRCUIT 1 PROVIDES GENERAL SCENE LIGHTING, CIRCUIT
2 AND OUTLET TURN ON AN OFF FOR SCRIM EFFECT.
AV POWER AND NETWORK FOR REAR SCREEN PROJECTOR
LIGHTING CIRICUIT FOR EDGE ILLUMINATED GRAPHIC
ELEMENTS
ARTIFACT CASE HEADER LIGHTING
LIGHTING CIRCUIT FOR GATE LATERN (TOP OF WALL)
POWER FOR PULLMAN
CAR CUT-AWAY MODELS
AV POWER AND NETWORK FOR WALL MOUNT MONITORS AND
MEDIA PLAYERS - WALL RECESSED AV BOX
AV MEDIA PLAYER BEHIND MONITOR AND FOCUSED SOUND
SPEAKER MOUNTED BELOW DROP CEILING. PROVIDE CEILING
POWER BOX FOR SPEAKER AND CONDUIT WITH PULL STRING TO
MONITOR FOR SPEAKER WIRE.
LIGHTING CIRCUIT FOR WALL MOUNTED "GAS LIGHT" WALL
SCONCE
LIGHTING CIRCUIT FOR WALL SCONCE MOUNTED SCENIC
COLUMN
AV POWER AND NETWORK FOR CEILING MOUNT PROJECTORS
MONITOR & MEDIA PLAYER
BY GOVERNMENT
108" AFF
J
192" AFF
192" AFF
TBD BY NPS
132" AFF
18" AFF
18" AFF
18" AFF 132" AFF
54" AFF
54" AFF
144" AFF
TOP OF
WALL
90" AFF
90" AFF
48" AFF93"
AFF
3" AFF
96"
AFF
171"
AFF
171"
AFF
THREE MONITORS
3 REMOVED POWER FOR ACTIVE CASE CONDITIONING, REMOVED AV AUDIO &
POWER FOR THE TRANSFER TABLE, REARRANGED EXHIBITS ON THE NORTH WALL,
REMOVED FLOOR GREAT HEAT INTERACTIVE , ADDED THREE AV MONITORS TO THE
STRIKE INTERACTIVE AND ADDED LIGHTING OUTLET FOR TRAIN MODEL RAIL.
25"
AFF
Pullman National Monument
D R AW I N G S :S C A L E :P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I July 26, 2019
84Plan / Architectural Modifications / Preliminary LightingScale: 1/8" = 1'-0" M1.1C3.1
SCALE DRAWINGSPROJECT PHASE
T H E D E S I G N M I N D S, I N C.C
National Park Service - Pullman National Monument Concept Design As noted Lighting Plan 01.20
0 1 2 3 4 FT
PLAN - Architectural Modifications - Lighting Scale: 1/8" = 1'-0"
4'-0" 4'-0"
TRACK MOUNTED TO
8"x 8" OPEN CELL DROP
CEILING HEIGHT: 14'-3"
4' -0
4'
-0
LIGHTING KEY
CEILING MOUNTED LIGHTING TRACK (T-1)(T-3) AND LED
TRACK FIXTURES (TL-1) (76) (BY EXH FAB)
EXHIBIT CASE LIGHTING TRACK (T-4) AND LED
TRACK FIXTURES (TL-3) (11) (BY EXH FAB)
CEILING LIGHT FIXTURES IN PULLMAN CAR (3)
(BY EXH FAB)
LED STRIP LIGHITING FIXTURES (LS) BEHIND WINDOW
GRAPHICS IN PULLMAN CAR SCENE. INCLUDES 4
LOWER AND 12 TRANSOM WINDOWS AND EDGE
ILLUMINATION OF PULLMAN GRAPHIC WALL.
(BY EXH FAB)
SCENIC REPRODUCTION FIXTURES:
WORK LIGHT FIXTURE IN PULLMAN CAR EXTERIOR SCENE
(1) (BY EXH FAB)
TRAIN STATION PLATFORM WALL FIXTURE OFF SCENIC
COLUMN (1) (BY EXH FAB)
GAS LIGHT WALL SCONCE (1) (BY EXH FAB)
LIGHTING NOTES
1 WORKLIGHT WILL BE PROGRAMMED TO TURN ON AND OFF ON
A REGULAR SCHEDULE. WHEN ON, A VIEWER IN THE
CARRIAGE WAY CAN SEE THE PULLMAN CAR SCENE
THROUGH THE GRAPHIC SCRIM PANEL IN THE BUILDING
WINDOW. WHEN OFF THE VIEWER SEES THE SCRIM GRAPHIC.
TWO-CIRCUIT TRACK: ONE CIRCUIT PROVIDES EVEN
ILLUMINATION OF THE PULLMAN CAR EXTERIOR AND SCENE.
SECOND CIRCUIT IS CONNECTED TO LIGHTING CONTROLLER
AND WILL COME ON AND OFF WITH THE WORK LIGHT NOTED
IN #1.
PENDANT MOUNTED TRACK (T-1) 14'-3" AFF BY EXH FAB.
GOVERNMENT TO PROVIDE SLOTS IN NEW CEILING AND
THREADED RODS TO MOUNT TRACK AS REQUIRED. SEE
REFLECTED CEILING PLAN.
CEILING MOUNTED LIGHTING TRACK (T-1) AND LED
WALL WASH TRACK FIXTURES (TL-2) (32) (BY EXH FAB)
4 4 4
FACTORY GATE - GAS LIGHT POLE FIXTURE
(BY EXH FAB) (80% OF FULL SCALE)
CARRIAGEWAY PENDANT FIXTURES (BY GOV) NIC
CEILING HEIGHT
16'-7"
2 3/26/19
3 7/26/19
T-1T-1
T-2
T-3
T-2 T-2
T-4
T-4T-4
LS
LS
LS
Pullman National Monument
D R AW I N G S :S C A L E :P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I July 26, 2019
85Scale =NA Architectural Modification - Lighting Fixture Schedule
LIGHTIING SCHEDULE
SYMBOL QNTY TYPE DESCRIPTION MFG CATALOG NO WATTAGE LAMP OUTPUT LAMP TYPE POWER SUPPLY DIMMING VOLTAGE LOCATION NOTES
76 TL-1 TRACK MOUNT -10 DEGREE SORAA LAMP, FINISH: BLACK,
ACCESSORIES: PROVIDE #992, #990 & #998 LENS
LSI SSL230-WXB-00-120-B 18.5W 1280 LM 3000L LED INTEGRAL ELV OR MLV 120 EXHIBIT TRACK LIGHTS - EXHIBIT
HALL & CARRIAGEWAY
BY EXHIBIT FABRICATOR
32 TL-2 TRACK MOUNT - LAMP, FINISH: BLACK, ACCESSORIES:
PROVIDE BEAM SOFTENER LENS
LSI LPW8-Z1027-9030-0E-ED 120 B 36 W 2725 LM 3000L LED INTEGRAL INTEGRAL 120 EXHIBIT TRACK WALL WASH
EXHIBT HALL & CARRIAGEWAY
BY EXHIBIT FABRICATOR
107 LN FT T-1 SINGLE CIRCUIT - SURFACE MOUNT TRACK LSI SURFACE TRACK - BLACK 120 EXHIBIT HALL BY EXHIBIT FABRICATOR
32 LN FT T-2 SINGLE CIRCUIT - PENDANT MOUNT TRACK LSI PENDANT MOUNT TRACK - BLACK 120 CARRIAGEWAY BY EXHIBIT FABRICATOR
16 LN FT T-3 TWO CIRCUIT - SURFACE MOUNT TRACK LSI SURFACE TRACK - BLACK 120 EXHIBIT HALL - PAINTER SCENE BY EXHIBIT FABRICATOR
11 TL-3 TRACK MOUNT - E-KCH SERIES MINI LED TRACK HEAD
ADJUSTABLE BEAM SPREAD 18 - 50 DEGREES
E-CONOLIGHT E-KCHO8A-DV30K 9W 850 LM 3000K INTEGRAL DIMMABLE 120 ARTIFACT CASE TRACK LIGHTS BY EXHIBIT FABRICATOR
12 LN FT T-4 SINGLE CIRCUIT - SURFACE MOUNT TRACK -BLACK E-CONOLIGHT E-K1T8K 8' E-K1T4K 4' 120 ARTIFACT CASE TRACK BY EXHIBIT FABRICATOR
3 D DIMMER FOR EXHIBIT CASE LEVITRON LEVITRON TRIMATRON 6683 120 ARTIFACT CASE TRACK BY EXHIBIT FABRICATOR
64 LN FT LS LINEAR STRIP LED LIGHTING JESCO DL-FLEX RGB POWER DL-PS 3.2 W/FT 70 LM/FT DIMMABLE 120 TRAIN CAR AND WALL
GRAPHICS
BY EXHIBIT FABRICATOR
TL-1 TL-2 TL-3
Pullman National Monument
D R AW I N G S :
Info here
S C A L E :
Scale = As Noted
P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I July 26, 2019
86M1.1C3.1
SCALE DRAWINGSPROJECT PHASE
T H E D E S I G N M I N D S, I N C.C
National Park Service - Pullman National Monument Concept Design As noted Exhibit Plan (Clean) 01.20
0 1 2 3 4 FT
PLAN - Reflected Ceiling Plan Scale: 1/8" = 1'-0"
1'-0"
1'-0"
NEW SUSPENDED CEILING WITH WOOD
SLATS 16'-7" AFF (BY GOVERNMENT)
OPENINGS FOR PENDANT MOUNTED TRACK
LIGHTING SYSTEM (BY EXHIBIT FABRICATOR)
SEE ARCHITECTURAL DRAWING SET CEILING
DETAIL A5.5
4'-0"
2'-0"
RETRACTABLE GATE
RETRACTABLE GATE RETRACTABLE GATE
NEW SUSPENDED CEILING WITH
8" X 8" OPEN CELL TILES 14'-3"
AFF (BY GOVERNMENT)
(VERIFY DIMENSIONS ONSITE)
18'-3" AFF TO 2ND FLOOR DECK ABOVE
5'-0"
5'-0"
16'-8"
21'-5" 10'-0"
4'-10"
7'-4"6'-3"
7'-11"
SCENIC ARCHES
8"
8"
THREADED RODS FROM UNISTRUT
FRAME APPROX. 6" ABOVE THE NEW
DROP CEILING TO ANCHOR IN FLOOR
DECK ABOVE - ALL 4 CORNERS
SUSPEND CABLES FROM UNISTRUT
FRAME THROUGH NEW DROP
CEILING TO EYE BOLTS ON SCENIC
ARCHWAY - EXH FAB TO DETERMINE
CABLE OR THREADED ROD BASED
ON FINAL WEIGHT OF SCENIC ARCH
ELEMENT - ESTIMATED AT 300 LBS
UNISTRUT FRAME SUSPENDED
FROM CEILING DECK - APPROX. 6"
ABOVE THE TOP OF NEW DROP
CEILING
UNISTRUT FRAMES SUSPENDED BY
THREADED RODS ANCHORED TO
THE FLOOR DECK ABOVE - POSITION
APPROX. 6" ABOVE THE TOP OF NEW
DROP CEILING - PAINTED BLACK
THREADED RODS FROM UNISTRUT
FRAME DROP THROUGH NEW DROP
CEILING TO SECURE HANGING
PULLEY SHAFT BRACKETS OVER
PYLON EXHIBITS - HANGING SCENIC
ELEMENTS ESTIMATED AT 150 LBS
EXHIBIT FABRICATOR TO VERIFY EXISTING DIMENSIONS AND
CONDITIONS PRIOR TO FABRICATION
NOTE:
TDM IS REQUESTING THAT GOVERNMENT CONSIDER INCLUDING THE
INSTALLATION OF THE SUSPENDED UNISTRUT FRAMES UNDER THE
BUILDING RENOVATION SCOPE OF WORK:
- THIS WOULD ALLOW THIS ELEMENT TO BE INSTALLED PRIOR TO
INSTALLTION OF THE SUSPENDED CEILING. REDUCING NEED FOR EXH
FAB TO DISASSEMBLE SECTIONS OF THE NEW CEILING
- ADJUSTMENTS COULD BE MADE IF CONFLICTS EXIST WITH OTHER
BUILDING MECHANICAL SYSTEMS
- ANCHORS TO THE FLOOR DECK AND SUSPENSION SYSTEM COULD
BE UNDER DIRECTION OF BUILDING STRUCTURAL ENGINEER
Pullman National Monument
D R AW I N G S :S C A L E :P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I July 26, 2019
87Plan / Architectural Modifications / Preliminary Floor coveringScale: 1/8" = 1'-0" M1.1C3.1
SCALE DRAWINGSPROJECT PHASE
T H E D E S I G N M I N D S, I N C.C
National Park Service - Pullman National Monument Concept Design As noted Exhibit Plan (Clean) 01.20
0 1 2 3 4 FT
PLAN - Architectural Modifications - Floorcovering Scale: 1/8" = 1'-0"
3'-0"
FC-1-3
FC-1-3 FC-4
RETAIL SPACE
HARDWOOD FLOORS
BY GOVERMENT
CARRIAGEWAY
CARPET BY GOVERNMENT
TBD
EXHIBIT GALLERY
CARPET TILES
BY GOVERNMENT
1978 SQ FT
SCENIC WOOD PLANKING "RAMP" DIRECTLY
ON FLOOR (BY EXHIBIT FABRICATOR)
PERIOD APPROPRIATE CARPET FOR
PULLMAN CAR SCENE (BY EXHIBIT
FABRICATOR)
FC-1
FC-4
EXHIBIT GALLERY CARPET
CUSTOM CARPET APPROPRIATE TO PERIOD OF THE
CAR - SPECIFICATION TBD
FC-2
FC-3
MOHAWK GROUP - DIGITAL TERRAIN - 856 SEDIMENT
MOHAWK GROUP - SEISMIC WAVE - 856 SEDIMENT
MOHAWK GROUP - GRAVITATIONAL - 856 SEDIMENT
(EQUAL MIX OF THREE TILE TYPES IN RANDOM PATTERN)
(EQUAL MIX OF THREE TILE TYPES IN RANDOM PATTERN)
BY EXHIBIT FABRICATOR
240 SQ FT
TILE SIZE
SCENIC TREATMENT OF HISTORIC FACTORY
FLOOR MATERIAL (TBD) (BY EXHIBIT
FABRICATOR)
Pullman National Monument
D R AW I N G S :S C A L E :P H A S E :
© T H E D E S I G N M I N D S , I N C .
Production Documents I July 26, 2019
88Scale = N/A Carpet Patterns
FC-2FC-1 FC-3
File details come from the government source that posted it. Updated .