Addendum Number: ONE Date Issued: 9 April 2018
Project: Mammoth Hotel Phase II
Guest Wing Renovation
Project Number: 15021.40
Pages in Addendum: 05 + Attachments Prepared By: Dennis Johnson
Kate Tilleman
Issued To: NPS Contracting Officer for release
This Addendum consists of 05 pages and 13 attachments. Sheet A0.1 r.01, ASK 001, SSK-1, SSK-2, Sheet S1.1 r.01, Sheet S3.1 r.01, Sheet S3.2 r.01, Sheet M1.0 r.01, Sheet M3.1 r.01, Sheet M4.3 r.01, Sheet P1.0 r.01, Sheet
E1.2 r.01, & Sheet E2.0 r.01
Addendum to Contract Documents:
General Clarifications:
1) NPS Fire Chief has indicated that fire watch will not be required while fire suppression system is inactive within the work area so long as fire detection is fully functional and hot-works are not undertaken. If hot-works are to be completed without an active fire suppression system, coordination of the protective measures (including fire watch and/or fire department standby) is required with NPS structural fire personnel.
2) It is intended that all existing historic wood trims salvaged shall be treated to remove historic lead based paint coatings prior to reinstallation and/or refinishing activities.
3) The existing hardwood flooring border in the Hallways is intended to be removed and replaced with new to match existing in-kind.
4) Detail 13/A0.3 indicates siding removal and replacement only if necessary. Contractor should take steps to mitigate impacting the existing siding adjacent to replaced windows, including avoiding removal and replacement of existing siding. If siding replacement is necessary, face nailing is an acceptable method of attachment.
5) The Code Plans in the Drawings identify fire resistive requirements and locations, including floor/ceiling assemblies.
6) Window 314A.1 is a type G Window.
7) To the best of our knowledge, there is no existing sheathing above the diagonal subfloor. The
½” sheathing should be installed directly over the existing diagonal planking in all locations except where indicated on demo plans (bathroom locations to accommodate for tile install).
Those locations will have the diagonal sheathing removed and a ¾” sheathing installed instead. See details 11/S5.3 and 11/S5.5 for additional information. Additional underlayments shall be installed for specific floor finishes as required by manufacturer or to achieve flush/level transitions to adjoining materials as indicated within the documents.
8) Interior trims and walls called out to remain should be restored and if finish coatings are field verified to be well adhered and in generally good condition, may be prepared and repainted without LBP abatement.
9) It is intended that the entire existing truss with the drag strut at Grid Line 7 above the Map
Room is to be sheathed as indicated in Detail 11/S5.6.
10) Sign of the Crab Plumbing Fixtures clarifications
a. Please refer to re-issued P1.0 revised 04/09/2018 for plumbing fixture clarifications.
Project Manual (Specifications):
1) Section 012700 – Definition of Contract Line Items
a. Delete 3.1-C in its entirety and replace with the following:
C. Contract Line Item No.3: Option B – Exterior Paint Removal and Repainting
1. This item shall consist of work solely associated with removal and lead abatement of all existing paint finishes to exterior siding and trims and the new exterior paint coatings and finishes indicated within the documents as Option B.
2. Repair/replacement of damaged or deteriorated exterior wood wall finish and trim materials as indicated within the Contract Documents shall be included in Contract Line Item No.1.
3. Preparation and painting of exterior items modified or affected due to other work shall be included within their respective Contract Line Item.
4. Measurement and payment will be based on percentage complete of Work value based on the approved Schedule of Values.
5. Payment will be made at the contract lump sum price.
6. Acceptance of the work included within this option by the Contracting Officer may occur at any time up until project completion.
2) Section 013216 – Construction Schedule
a. Delete section 2.2-B-9 in its entirety and replace with the following:
9. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the Notice to Proceed, Substantial Completion, and the following interim milestones:
a. Lobby and Registration area work
b. Other work items affecting building operations such a.
3) Section 09816 – Sheet Carpeting
a. Delete item 2.1in its entirety and replace with the following:
2.1 TUFTED CARPET
A. Basis of Design: Subject to compliance with the requirements for use at guest rooms and non-public areas, provide Shaw Custom Hospitality Carpet or approved equal including exact pattern match and finished construction.
B. Pattern: Match Architect's samples – CUSTOM SHAW HOSPITALITY.
1. Style: Y10961
2. Sample No.: Y864N-0
3. Project: Mammoth Hotel Rooms Carpet
C. Colors: Match Architect's samples – CUSTOM SHAW HOSPITALITY.
1. Pattern Field A: CE952
2. Pattern Field B: CJ627
D. Fiber Content: Solution Dye E. Pile Characteristic: Inline Scroll Loop & Cut (Yamaguichi) tip sheared.
F. Density: 38 oz./cu. yd..
G. Pile Thickness: 0.27 inches for finished carpet.
H. Stitches: 13.67 stitches per inch.
I. Gage: 1/10 J. Primary Backing: Woven polypropylene.
K. Secondary Backing: Classicbac secondary backing material.
L. Application: Heavy Traffic.
M. Warranty: 10 year.
N. Roll Width: 12 feet.
O. Applied Treatments:
1. Applied Soil-Resistance Treatment: Manufacturer's standard material.
4) Section 09816 – Sheet Carpeting
a. Delete item 2.2 in its entirety and replace with the following:
2.2 TUFTED CARPET
A. Basis of Design: Subject to compliance with the requirements for use at hallways, stairs and other public areas, provide Shaw Custom Carpet or approved equal. Carpet pattern shall match in-kind pattern and visual matching of colorways to carpet currently installed under previous phase of work.
B. Pattern: Match Architect's samples – CUSTOM SHAW HOSPITALITY.
1. Pattern 1 – PF38293-1 – EcoEvolution Weave 36 in custom pattern.
a. Sample No.: X839P
b. Location: Hallway & Elevator Lobbies
c. Refer to finish plans for other locations
2. Pattern 2 – PF38293-2 – EcoEvolution Weave 36 in custom pattern
a. Sample No.: X838P
b. Location: Stair S3 & S4
c. Refer to finish plans for other locations.
C. Colors: Match Architect's samples – CUSTOM SHAW HOSPITALITY.
1. Pattern: PF38293-1
a. Colors
i. Pattern Field A: C30
ii. Pattern Field B: E26
iii. Pattern Field C: G53
2. Pattern: PF 38293-2
a. Colors
i. Pattern Field A: C30
ii. Pattern Field B: E30
iii. Pattern Field C: E26
D. Fiber Content: Eco Solution q nylon 100% Dye-injection print.
E. Pile Characteristic: Multi-Level Pattern Cut/loop.
F. Density: 36 oz./cu. yd..
G. Pile Thickness: 0.22 inches.
H. Total Thickness: 0.349 inches I. Stitches: 13 stitches per inch.
J. Gage: 1/10 K. Primary Backing: Woven synthetic.
L. Secondary Backing: Classicbac.
M. Pad: Ultraloc MPC factory applied integral pad.
N. Application: Heavy Traffic.
O. Warranty: 20 year.
P. Roll Width: 12 feet.
Q. Applied Treatments:
1. Applied Soil-Resistance Treatment: Manufacturer's standard material.
Drawings:
1) Sheet A0.01; Delete sheet in its entirety and replace with attached sheet A0.01-r01 – Revised and dated 04/09/2018.
2) C9.5 Detail 16; Extend hatch indicating heated typical reinforced concrete entry pad to include the sidewalk from the north boundary of the ABA parking striping toward the south extending of concrete crosswalk ramp to the Lobby and Registration Wing.
3) Sheets D2.1, D2.2, D2.3, D2.4 and A2.1, A2.2, A2.3, A2.4 Detail 9 all sheets; refer to attached ASK
002 for additional work in Stair S5. All other work to remain as indicated within the documents.
4) Sheets A4.1, A4.2, A4.3, A4.4, and A4.5 – change items below as indicated in all instances:
a. Keynote 2: Revise note to read: “(E) CLAPBOARD SIDING TO REMAIN, PROTECT.
SELECTIVELY PATCH AND REPAIR AS INDICATED OR REQUIRED. PREP AND PAINT
AFFECTED WORK. OPTION B: STRIP, PRIME, AND PAINT ALL EXTERIOR SIDIDING.”
b. Keynote 4; Revise note to read: “(E) HISTORIC CORNICE MOLDING AND FRIEZE BOARD.
OPTION B: STRIP, PRIME AND PAINT ALL EXISTING EXTERIOR TRIM TO REMAIN.”
c. Keynote 5; Revise note to read: “(E) WATER TABLE TRIM. REPLACE (E) BOTTOM SKIRT
BOARD OF (E) WATER TABLE TRIM W/ (N) TO MATCH (E) IN-KIND. PAINT NEW SKIRT
BOARD. OPTION B: STRIP, PRIME AND PAINT ALL EXISTING EXTERIOR TRIM TO REMAIN.”
d. General Notes; Add note 4 reading: “In the event Option B is not selected (requiring the complete striping and refinishing of the exterior of the building), all siding and trims affected by the completion of the work shall be carefully prepared and painted to match in-kind existing such that a fully finished and weather resistant façade shall be created presenting a completely finished building.”
5) Sheet S1.1; Delete sheet in its entirety and replace with attached revised sheet S1.1 R.01 dated
04/09/2018.
6) Sheet S2.1; Change Detail 9 as indicated in the attached sketch SSK #2.
7) Sheet S3.1; Delete sheet in its entirety and replace with attached revised sheet S3.1 R.01 dated
04/09/2018.
8) Sheet S3.2; Delete sheet in its entirety and replace with attached revised sheet S3.2 R.01 dated
04/09/2018.
9) Sheet S5.6; Change Detail 2 as indicated in the attached SSK #1.
10) Sheet M1.0; Delete sheet in its entirety and replace with attached revised sheet M1.0 R.01 dated 04/09/2018.
11) Sheet M2.0. Louvers L-1 and L-2 on the west elevation: interchange louver labels so that louver
L-1 and L-2 locations are substituted for each other.
12) Sheet M3.0; Increase the size of the piping serving P-2 and snowmelt system from 1 ¼” to 1 ½".
13) Sheet M3.1; Delete sheet in its entirety and replace with attached revised sheet M3.1 R.01 dated 04/09/2018.
14) Sheet M4.3; Delete sheet in its entirety and replace with attached revised sheet M4.3 R.01 dated 04/09/2018.
15) Sheet P1.0; Delete sheet its entirety and replace with attached revised sheet P1.0 R.01 dated
04/09/2018.
16) Sheet E1.2; Delete sheet in its entirety and replace with attached revised sheet E1.2 R.01 dated
04/09/2018.
17) Sheet E2.0; Delete sheet in its entirety and replace with attached revised sheet E2.0 R.01 dated
04/09/2018.
END ADDENDUM ONE
RE-FEAD EXISTINGTRANSFORMER ASNEEDED
VICINITY PLANS &
STAGING AREAS 2
A0.01
12 VICINITY PLAN & STAGING AREAS - MAMMOTH HOT SPRINGS, WY - YNP
A0.01 : A0.01 1/64" = 1'-0"14 AREA MAP & STAGING AREAS - MAMMOTH HOT SPRINGS, WY - YNP
A0.01 : A0.01 NOT TO SCALE
MAMMOTH
CHAPEL
MAMMOTH STABLES
NORTH ENTRANCE ROAD
GRAND LOOP ROAD GRAND LOOP ROAD
6.7°
PARK
NATIONAL
YELLOWSTONE
NATIONAL PARK
GRAND TETON
MEMORIAL PARKWAY
J.D. ROCKEFELLER JR.
I D
A
H
O
M
O
N
T A
N
A
JACKSON
WYOMING
MONTANA
W Y
O M
I N
G
I D
A H
O
RIGBY
REXBURG
ST. ANTHONY
CODY
POWELL
UNITED STATES OF AMERICA
VICINITY MAP - YELLOWSTONE NATIONAL PARK
REGIONAL VICINITY MAP
MONTANA
IDAHO
WYOMING
9 YELLOWSTONE NATIONAL PARK - (YNP)
A0.01 : A0.01 NOT TO SCALE
5 LOCATION MAPS
A0.01 : A0.01 NOT TO SCALE
GRAND LOOP ROAD
GRAND LOOP ROAD
PROJECT SITE
GRAND LOOP ROAD
MAMMOTH HOTEL
GRAND LOOP ROAD
MAMMOTH
TERRACE GRILL
JUNIPER DORM
GRAND LOOP ROAD
NORTH ENTRANCE ROAD
BARRACKS ST
BE
AV
ER
P
ON
DS
T
RA
IL
LODGEPOLE AVE
LODGEPOLE AVE
JUNIPER ST
GENERAL
ACCOUNTING
OFFICE
A0.01
6.7°
ONE WAY
NORTH ENTRANCE ROAD
MAMMOTH CABINS
ONE WAY
MAMMOTH
BOILER ROOM
EMPLOYEE
DINING ROOM
MAMMOTH
DINING ROOM
MAMMOTH
CONFERENCE
CENTER
US ENGINEER'S
OFFICE
ASPEN DORM
SPRUCE DORM
LEGEND
HATCH INDICATES APPROXIMATE STAGING & WORK AREA 1
AVAILABLE FOR CONTRACTOR'S USE FROM NOTICE TO
PROCEED THROUGH PROJECT COMPLETION. FINAL EXTENTS
TO BE AGREED TO IN WRITING WITH CONTRACTING OFFICER
BASED ON FIELD COORDINATION.
KEYNOTES#
CONTRACTOR MAY UTILIZE PAVED PARKING AREA INDICATED WITHIN THE
DATE RANGE SPECIFIED. DURING THIS PERIOD CONTRACTOR SHALL
RELEASE AREA FREE OF ALL STORAGE AND CONSTRUCTION DEBRIS FOR
CHAPEL PARKING FOR 1 WEEK PERIOD PRIOR TO AND FOLLOWING
CHRISTMAS DAY AND EASTER.
AT ALL VEGETATED AREAS UTILIZED FOR STAGING, CONTRACTOR
SHALL RESTORE IRRIGATION SYSTEMS, TOP SOIL FERTILITY, AND
RE-VEGITATE TO IN-KIND HISTORIC STATE SUCH THAT NO EVIDENCE
OF USE REMAINS AT PROJECT COMPLETION - TYPICAL.
CONTRACTOR SHALL PROTECT TREE FROM STAGING STORAGE
FROM TRUNK TO DRIP LINE. PROVIDE SAFETY FENCING AT
BOUNDARY TO PREVENT STORAGE.
CONTRACTOR SHALL PLACE STAGGERED DOUBLE LAYER 3/4" PLY-WOOD
PROTECTION WITHIN TREE DRIP LINE WHEN UTILIZING LIFTS OF OTHER
EQUIPMENT TO ACCESS BUILDING FACE.
APPROXIMATE AREA FOR CONTRACTOR STAGING FOR PROJECT
DURATION. CONTRACTOR SHALL COORDINATE EXTENT WITH
CONTRACTING OFFICER AND MAINTAIN SUFFICIENT BUS PARKING AND
VEHICULAR ACCESS AT ALL TIMES.
GENERAL NOTES
1. FIELD VERIFY DIMENSIONS. DO NOT SCALE DRAWINGS. NOTIFY
CONTRACTING OFFICER OF ANY DISCREPANCIES PRIOR TO COMMENCING
WORK.
2. REFER TO ALL DRAWINGS FOR ADDITIONAL INFORMATION AND WORK SCOPE
REQUIRED.
3. MAINTAIN SAFE EGRESS FROM ALL REQUIRED EMERGENCY EXITS
THROUGHOUT CONSTRUCTION.
4. REFERENCE SPECIFICATION SECTION 011216 FOR INITIAL WORK SEQUENCE
AND COORDINATE THE STAGING AREAS DESCRIBED ON THIS SHEET WITH
CONTRACTOR'S PROPOSED PHASING PLAN SUBMITTAL.
HATCH INDICATES APPROXIMATE STAGING & WORK AREA 2
AVAILABLE FOR CONTRACTOR'S USE FROM APPROXIMATELY
10 SEPTEMBER 2018 THROUGH PROJECT COMPLETION. FINAL
EXTENTS TO BE AGREED TO IN WRITING WITH CONTRACTING
OFFICER BASED ON FIELD COORDINATION.
TYP.
TYP.
MAINTAIN VEHICULAR ACCESS ALONG JUNIPER STREET THROUGHOUT
CONSTRUCTION. COORDINATE LIMITED SHUTDOWN FOR UTILITY WORK
AS REQUIRED. MAINTAIN PARKING FOR PUBLIC USE - NO CONTRACTOR
USE ALLOWED.
7 MAINTAIN EMERGENCY EGRESS FROM ENTRANCE/STAIR WHENEVER
BUILDING IS OCCUPIED AND OPEN TO THE PUBLIC.
HATCH INDICATES LIMITS OF WORK AREA 3 AVAILABLE FOR
CONTRACTOR'S WORK FOR TWO PERIODS OF PERFORMANCE.
CONTRACTOR SHALL ENSURE WORK ITEMS REQUIRED ARE
FULLY COMPLETED WITHIN A SINGLE PERIOD.
PERIOD 1 - OCTOBER 15, 2018 THRU DECEMBER 1, 2018.
PERIOD 2 - MARCH 11, 2019 THRU APRIL 20, 2019
P:
\15
1.4
0\D ra wi ng s & M od els
\A uto
CA
D\
B
ID
DI
NG
A
SK
S\
A0 .01
_r 1 V ici nit y P lan
.dw g
A pr
, 2
8 -
:44 am
15021.40
MAMMOTH HOTEL PHASE II
GUEST WING RENOVATION
NATIONAL PARK SERVICE - US DEPARTMENT OF THE INTERIOR
MAMMOTH HOT SPRINGS, WY - YELLOWSTONE NATIONAL PARK
YELL 101
135239
30402.28.2018
PKG 1
0 1 2 3 4 5 6 7 8 9 10 inches
PROJECT NO:
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
REVISIONS
CO
NS
TR
UC
TI
ON
D
OC
UM
EN
TS
PMIS NO. 205796
L
I
C
E
N
S
E
D
AR
C
H
I
T
E
C
T
S
T
A
T
E
O
F W
Y
O
M
I
N
G
04.09.20181
R. 01
RE
VI
SI
ON
AutoCAD SHX Text
BLDG.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
YELLOWSTONE
AutoCAD SHX Text
HEART
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
LEWIS
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
SHOSHONE
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
DELUSION
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
CONTINENTAL
AutoCAD SHX Text
DIVIDE
AutoCAD SHX Text
CONTINENTAL DIVIDE
AutoCAD SHX Text
PARK
AutoCAD SHX Text
TETON
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
GRANT
AutoCAD SHX Text
VILLAGE
AutoCAD SHX Text
WEST
AutoCAD SHX Text
THUMB
AutoCAD SHX Text
OLD
AutoCAD SHX Text
FAITHFUL
AutoCAD SHX Text
BRIDGE
AutoCAD SHX Text
BAY
AutoCAD SHX Text
FISHING
AutoCAD SHX Text
BRIDGE
AutoCAD SHX Text
PARK COUNTY
AutoCAD SHX Text
TETON COUNTY
AutoCAD SHX Text
WEST
AutoCAD SHX Text
YELLOWSTONE
AutoCAD SHX Text
MADISON
AutoCAD SHX Text
NORRIS
AutoCAD SHX Text
CANYON
AutoCAD SHX Text
GARDINER
AutoCAD SHX Text
EAST
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
NORTH EAST
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
SOUTH
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
WEST
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
IDAHO
AutoCAD SHX Text
WYOMING
AutoCAD SHX Text
WYOMING
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text V.C.
AutoCAD SHX Text V.C.
AutoCAD SHX Text V.C.
AutoCAD SHX Text V.C.
AutoCAD SHX Text
PELICAN
AutoCAD SHX Text
CONE
AutoCAD SHX Text
LAMAR
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
TOWER-
AutoCAD SHX Text
ROOSEVELT
AutoCAD SHX Text V.C.
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
GALLATIN
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
WYOMING
AutoCAD SHX Text
MAMMOTH
AutoCAD SHX Text
HOT SPRINGS
AutoCAD SHX Text
COOKE
AutoCAD SHX Text
CITY
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
IDAHO
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
SNAKE
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
BECHLER
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
MT. HOLMES
AutoCAD SHX Text
MT. SHERIDAN
AutoCAD SHX Text
GALLATIN
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
FOREST
AutoCAD SHX Text
TARGHEE
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
FOREST
AutoCAD SHX Text
TETON
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
FOREST
AutoCAD SHX Text
SHOSHONE
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
FOREST
AutoCAD SHX Text
GALLATIN NATIONAL FOREST
AutoCAD SHX Text
BECHLER
AutoCAD SHX Text
TOWER
AutoCAD SHX Text
FALL
AutoCAD SHX Text
SLOUGH
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
PEBBLE
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
WAPITI LAKE
AutoCAD SHX Text
WHITE
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
AutoCAD SHX Text
HEBGEN
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
TO
AutoCAD SHX Text
ASHTON
AutoCAD SHX Text
TO
AutoCAD SHX Text
BOZEMAN
AutoCAD SHX Text
TO LIVINGSTON
AutoCAD SHX Text
INDIAN
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
GREBE
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
CASCADE
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
ICE
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
MARY
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
TO GRAND TETON NATIONAL PARK
AutoCAD SHX Text
TO CODY,
AutoCAD SHX Text
WYOMING
AutoCAD SHX Text
TO
AutoCAD SHX Text
RED LODGE,
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text
, MONTANA
AutoCAD SHX Text
YELLOWSTONE
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
GRIZZLY
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
SILVER
AutoCAD SHX Text
GATE
AutoCAD SHX Text
AutoCAD SHX Text
GALLATIN CO.
AutoCAD SHX Text
FREMONT CO.
AutoCAD SHX Text
PARK HQ
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
HOTEL
AutoCAD SHX Text
BLDG.
AutoCAD SHX Text
A & E ARCHITECTS P.C.
AutoCAD SHX Text
JAMES R. MCDONALD
AutoCAD SHX Text
WYOMING
AutoCAD SHX Text
MISSOULA
AutoCAD SHX Text C-1435
RE
VI
SI
ON
R. 01
SI
ON
SI
ON
M1.0
MECHANICAL LEGENDS AND
SCHEDULES
0 1 2 3 4 5 6 7 8 9 10 inches
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
YELL 101
135239
30402.28.2018
PKG 1
101 E. BROADWAY
BELGRADE, MT 59714
PH: (406) 388-3320
FAX: (406) 388-3389
ACE PROJECT #: 13BZ4199.005
PROJECT NO:
REVISIONS:
PMIS NO. 205796
15021.40
MAMMOTH HOTEL PHASE II
GUEST WING RENOVATION
NATIONAL PARK SERVICE - US DEPARTMENT OF THE INTERIOR
MAMMOTH HOT SPRINGS, WY - YELLOWSTONE NATIONAL PARK
04.09.20181
DUCTWORK CONST. SCHED.
MECHANICAL SYMBOLS LEGEND
THIS IS A STANDARDIZED SYMBOLS LEGEND, ALL SYMBOLS SHOWN MAY NOT
APPEAR ON OR WITHIN THIS SET OF CONTRACT DOCUMENTS.
- ALL INTERIOR SUPPLY DUCTWORK
- ALL EXHAUST DUCTWORK FROM THE BACKDRAFT DAMPER TO THE EXTERIOR
- ALL FRESH AIR DUCTWORK AND COMBUSTION AIR DUCTWORK
- ALL OTHER INTERIOR EXHAUST DUCTWORK
- ALL INTERIOR RETURN DUCTWORK
- ALL TRANSFER DUCTWORK
INSULATED FLEXIBLE DUCTWORK MAY BE USED AT THE CONTRACTOR'S OPTION FOR A
MAXIMUM OF 5 FT. LENGTH TO EACH DIFFUSER/REGISTER/ GRILLE.
LINED DUCTWORK INCLUDES:
UNINSULATED/UNLINED DUCTWORK INCLUDES:
INSULATED DUCTWORK INCLUDES:
18"Ø or 18"
LPS
C
HWR
HWS
HOT WATER
RETURN
HOT WATER
SUPPLY
LOW PRESS.
STEAM
CONDENSATE
LINE
DOUBLE LINE
REPRESENTATION
SINGLE LINE
REPRESENTATION
DOUBLE LINE
REPRESENTATION
SINGLE LINE
REPRESENTATION
P.O.C.-POINT OF
CONNECTION
SWITCH
T'STAT. (ELEC.)
SIDEWALL AIR DEVICE
WALL LOUVER
NEW EQUIPMENT
EXISTING TO REMAIN
DRAWING LIST
M1.0 MECHANICAL LEGENDS AND SCHEDULES M2.3 THIRD FLOOR HVAC PLAN
MD3.0 CRAWLSPACE HYDRONIC DEMOLITION PLAN M2.4 FOURTH FLOOR HVAC PLAN
MD3.1 FIRST FLOOR HYDRONIC DEMOLITION PLAN M2.5 ATTIC HVAC PLAN
MD3.2 SECOND FLOOR HYDRONIC DEMOLITION PLAN M3.0 CRAWLSPACE HYDRONIC PLAN
MD3.3 THIRD FLOOR HYDRONIC DEMOLITION PLAN M3.1 FIRST FLOOR HYDRONIC PLAN
MD3.4 FOURTH FLOOR HYDRONIC DEMOLITION PLAN M3.2 SECOND FLOOR HYDRONIC PLAN
MD3.5 ATTIC MECHANICAL DEMOLITION PLAN M3.3 THIRD FLOOR HYDRONIC PLAN
MD4.3
BASEMENT AND SECOND FLOOR HYDRONIC
DEMOLITION PLAN - EXISTING BUILDING
M3.4 FOURTH FLOOR HYDRONIC PLAN
M2.0 CRAWLSPACE HVAC PLAN M4.1 MECHANICAL DETAILS
M2.1 FIRST FLOOR HVAC PLAN M4.2 MECHANICAL DETAILS II
M2.2 SECOND FLOOR HVAC PLAN M4.3
BASEMENT AND SECOND FLOOR HYDRONIC
PLAN - EXISTING BUILDING
EXHAUST FAN SCHEDULE
PLAN CODE MANUFACTURER
MODEL
NUMBER
CFM ESP RPM
DRIVE
TYPE
ELECTRICAL DATA
REMARKS
HP VOLT AMP PH
EF-1 COOK 150SQN17D (VF) 2500 0.5 1725 EC 5/8 120 13 1 SEE NOTES BELOW
EF-2 COOK 165SQN17D (VF) 3300 0.5 1725 EC 1 208 8 1 SEE NOTES BELOW
EF-3 COOK 165SQN17D (VF) 3800 0.5 1725 EC 1 1/2 208 10 1 SEE NOTES BELOW
NOTES:
1. PROVIDE FANS WITH BACKDRAFT DAMPER, REMOTE SPEED CONTROLLER, AIR BALANCE KIT, FACTORY PRE-WIRED DISCONNECT AND FLEXIBLE INLET/OUTLET CONNECTORS. TC CONTRACTOR RESPONSIBLE FOR LOW
VOLTAGE CONNECTIONS AND CONDUIT. CONNECT FANS TO EXISTING BUILDING AUTOMATION SYSTEM.
2. SUSPEND FANS FROM ROOF STRUCTURE WITH VIBRATION SPRING ISOLATORS.
FINNED PIPE RADIATION SCHEDULE
PLAN
CODE
MANUF.
MODEL
NUMBER
ENCLOSURE PERFORMANCE
ROW LENGTH DEPTH HEIGHT TYPE MOUNT HEIGHT MBH GPM EWT °F
TEMP
CHANGE °F
FT-1 RUNTAL RF-3 3 10' 1.6" 8.6" STEEL 3" AFF 7.90 1 180 20 PROVIDE END CAPS
FT-2 RUNTAL RF-3 3 9' 1.6" 8.6" STEEL 3" AFF 7.11 0.5 180 20 PROVIDE END CAPS
FT-3 RUNTAL RF-3 3 4' 1.6" 8.6" STEEL 3" AFF 3.16 0.5 180 20 PROVIDE END CAPS
NOTES:
1. ARCHITECT TO SELECT COLOR FROM STANDARD COLOR CHART. ALL BRACKETS, HARDWARE AND FASTENERS SHALL MATCH THE COLOR OF THE RADIATOR.
2. INSTALL WITH HANGING BOARD PER DETAIL 1/M4.1. PROVIDE TACO ZONE SENTRY HOT WATER 2-WAY CONTROL VALVE (OR EQUIVALENT VALVE FOR INSTALLATION IN TIGHT ENCLOSURES) AND ISOLATION VALVE BEHIND END CAP OF PANEL. PROVIDE PANEL WITH SAME SIDE INLET AND OUTLET CONFIGURATION. PROVIDE CUSTOM END CAPS TO COVER PIPING FROM UNIT TO WALL.
3. SEE ARCHITECTURAL ELEVATIONS FOR RADIATOR MOUNTING HEIGHTS. SEE DETAIL 1/M4.1 FOR PANEL INSTALLATION REQUIREMENTS.
HYDRONIC SIZING
SIZE GPM
3/4" 2.5
1" 6
1 1/4" 10
1 1/2" 17
2" 35
2 1/2" 65
3" 105
4" 320
ELEVATION NOTES
THE BUILDING SITE IS LOCATED IN MAMMOTH, WY. AT
APPROXIMATELY 6,300' ELEVATION. ACCOUNT FOR THIS
ELEVATION IN ALL EQUIPMENT SELECTIONS.
TEMPERATURE CONTROLS NOTES
MODIFY EXISTING HEAT EXCHANGER DISCHARGE WATER TEMPERATURE TO 180°F. HEAT EXCHANGERS LOCATED IN EXISTING MECHANICAL ROOM.
ALL THERMOSTATS IN PUBLIC SPACES (CORRIDORS, STAIR TOWERS, ELEVATOR LOBBY) AND OFFICE SPACES (LOCATION MANAGER, TIMEKEEPING/STAFF LOCKERS, OFFICE ASSISTANT, HOUSEKEEPING OFFICE, AND DOCK INTAKE) SHALL BE WIRED 24V NETWORK THERMOSTATS WITH DIGITAL DISPLAY TO TIE INTO THE BUILDING AUTOMATION SYSTEM. COORDINATE WITH E.C. FOR POWER TO RADIANT HEATER CONTROL PANELS IN
CRAWLSPACE AND ATTIC. PROVIDE WITH JCI T701DFP-4 THERMOSTAT OR EQUIVALENT 24V WIRED NETWORK THERMOSTAT.
ALL THERMOSTATS IN PUBLIC GUEST ROOMS AND ASSOCIATED BATHROOMS SHALL BE WIRED 120V STAND ALONE THERMOSTATS WITH DIGITAL DISPLAY. ALL HOT WATER RADIATOR CONTROL VALVES IN GUEST ROOMS AND ASSOCIATED BATHROOMS SHALL BE 120V VALVES. PROVIDE WITH
TACO ZONE SENTRY SERIES VALVE AND AUBE TH114-A THERMOSTAT OR EQUIVALENT 120V NON-PROGRAMMABLE, STAND-ALONE THERMOSTAT.
PROVIDE METER FOR ALL UTILITIES TO BE TIED INTO BUILDING AUTOMATION SYSTEM. METERED UTILITIES SHALL INCLUDE ELECTRIC SERVICE, DOMESTIC COLD WATER, DOMESTIC HOT WATER, AND GAS SERVICE.
T.C. RESPONSIBLE FOR ALL LOW VOLTAGE WIRING, CONDUIT, AND TERMINATIONS. E.C. RESPONSIBLE FOR THERMOSTAT ROUGH-IN.
DESIGN BASIS CODES
2015 INTERNATIONAL BUILDING CODE
2015 INTERNATIONAL MECHANICAL CODE
2015 INTERNATIONAL ENERGY CONSERVATION CODE
2015 INTERNATIONAL FIRE CODE
2015 INTERNATIONAL FUEL GAS CODE
HOT WATER UNIT HEATER SCHEDULE
PLAN CODE MANUFACTURER
MODEL
NUMBER
CFM
(100°)
MBH
INPUT
GPM MBH OUTPUT
ELECTRICAL DATA
REMARKS
RPM FLA HP VOLT PH
UH-1, 2, 3 STERLING HS-136A 750 18.4 2 18.4 900 1.4 1/20 120 1 SEE NOTES BELOW
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. PROVIDE WITH THERMOSTAT AND 3-WAY HOT WATER CONTROL VALVE. SEE DETAIL 10/M4.1 FOR MORE DETAILS.
3. ARCHITECT TO SELECT COLOR FROM STANDARD COLOR CHART.
ENERGY RECOVERY VENTILATOR SCHEDULE
PLAN
CODE
MANUF.
MODEL
NUMBER
SUPPLY AND EXHAUST SECTION ELECTRICAL DATA FILTER
REMARKS
FAN CFM E.S.P. HP VOLT PH AMPS WATTS TYPE
ERV-1 RENEWAIRE HE1.5XINV 900 1 1 208 1 8 1500 MERV 13 SEE NOTES BELOW
ERV-2 RENEWAIRE HE1.5XINV 600 1 1 208 1 8 1500 MERV 13 SEE NOTES BELOW
NOTES: 1. PROVIDE WITH SINGLE POINT POWER CONNECTION, FUSED DISCONNECT, DOUBLE WALL CONSTRUCTION, MERV 13 FILTERS, FACTORY MOUNTED FILTER ALARM, BMS INTEGRATION, AND MOTORIZED
ISOLATION DAMPERS ON OA AND EA. TC CONTRACTOR RESPONSIBLE FOR LOW VOLTAGE CONNECTIONS AND CONDUIT.
2. EXCAVATE AROUND UNIT TO PROVIDE ACCESS FOR MAINTENANCE AND DUCT ROUTING. PROVIDE NEW FILTER AT UPON SUBSTANTIAL COMPLETION.
3. PROVIDE HOT WATER COILS IN SUPPLY AIR DUCTS. SEE ERV COIL SCHEDULE FOR MORE INFORMATION.
1. THE INTENT OF THESE DRAWINGS IS TO REMOVE ALL EXISTING MECHANICAL AND HYDRONIC
EQUIPMENT LOCATED IN THE BUILDING GUEST WING.
2. CONTRACTING OFFICER HAS FIRST RIGHT OF REFUSAL FOR ALL EQUIPMENT/MATERIAL CALLED
OUT TO BE REMOVED. CONTRACTOR SHALL PRESENT ALL DEMO'D EQUIPMENT/MATERIAL TO
CONTRACTING OFFICER PRIOR TO REMOVING FROM SITE. COORDINATE WITH LIST OF ITEMS TO
BE SALVAGED.
DEMOLITION NOTES
GRAVITY VENTILATOR SCHEDULE
PLAN
CODE
MANUF.
MODEL
NUMBER
FUNCTION HOOD SIZE
THROAT
SIZE
MATERIAL FINISH CFM DAMPER REMARKS
GV-1 COOK TRE INTAKE 35 3/4" X 35 3/4" X 9" 24" X 24" ALUMINUM BLACK SEE PLANS MOTORIZED SEE BELOW
GV-2 COOK TRE EXHAUST 35 3/4" X 47 3/4" X 12 1/2" 24" X 36" ALUMINUM BLACK SEE PLANS MOTORIZED SEE BELOW
GV-3 COOK TRE EXHAUST 35 3/4" X 47 3/4" X 16" 24" X 36" ALUMINUM BLACK SEE PLANS MOTORIZED SEE BELOW
GV-4 COOK TRE EXHAUST 35 3/4" X 47 3/4" X 16" 24" X 36" ALUMINUM BLACK SEE PLANS MOTORIZED SEE BELOW
NOTES:
1. PROVIDE WITH BIRD SCREEN AND PRE-MANUFACTURED 14" ROOF CURB. MATCH TAN COLOR OF GRAVITY VENTILATORS ON EXISTING BUILDING.
2. PROVIDE ALL VENTILATORS WITH MOTORIZED DAMPER. DAMPER SIZE SHALL BE THE SAME AS THROAT SIZE. TC CONTRACTOR RESPONSIBLE FOR LOW VOLTAGE
CONNECTIONS AND CONDUIT.
RADIANT SNOWMELT SCHEDULE (35% PROPYLENE GLYCOL)
PLAN
CODE
MANUF.
TUBE
SPACING
SUPPLY
TEMP. MAX
HWS
TEMP
HWR
TEMP
FT. OF
HEAD
GPM
HEADER
SIZE
TUBE
SIZE
# OF
CIRC.
LOAD
MBH
ZONE
SQ. FT.
REMARKS
SM-1
REHAU-
PEX
6" O.C. 95 92 72 10.0 11.00 1 1/4" 1" 5 129.0 768
MAXIMUM CIRCUIT
LENGTHS 300'
SM-2
REHAU-
PEX
6" O.C. 98 94 74 10.0 23.00 1 1/4" 1" 12 265.9 1583
MAXIMUM CIRCUIT
LENGTHS 300'
NOTES:
1. VERIFY EXACT RADIANT PANEL LOCATION WITH G.C. PRIOR TO INSTALL. INSTALL CONTROLLERS IN CRAWLSPACE ELECTRICAL ROOM.
2. PROVIDE MANIFOLD W/ CIRCUIT ISOLATION VALVES ON SUPPLY AND RETURN, CIRCUIT FLOW INDICATORS, VENT AND PURGE ASSEMBLY, AND PRESSURE GAUGES.
3. PROVIDE TEMPERATURE MIXING VALVE BEFORE MANIFOLD TO DECREASE WATER TEMP TO 95°F.
3. M.C. TO PROVIDE SENSORS, ALL LOW VOLTAGE CONTROL DEVICES, CONDUCTORS AND TERMINATIONS.
4. SUPPLIER TO PROVIDE RADIANT HEAT PIPING LAYOUT FOR REVIEW DURING SHOP DRAWING PROCESS.
5. PROVIDE AND INSTALL IN-SLAB SNOW MELT SENSOR AND WIRE TO DDC SYSTEM FOR CONTROL OF SNOW MELT ZONES. TIE INTO EXISTING BUILDING MANAGEMENT SYSTEM.
GRILLE - REGISTER - DIFFUSER SCHEDULE
PLAN
CODE
MANUFACTURER MODEL NUMBER FUNCTION NECK SIZE MATERIAL FINISH CFM
VOLUME
DAMPER
REMARKS
EG-1 KRUEGER S80 EXHAUST 6" X 6" STEEL BAKED ENEMEL SEE PLANS IN DUCT 6" X 6" WALL GRILLE
EG-2 KRUEGER 6490 EXHAUST 6" X 6" STEEL BAKED ENEMEL SEE PLANS IN DUCT 12" X 12" CEILING GRILLE
RG-1 KRUEGER S80 RETURN 6" X 6" STEEL BAKED ENEMEL SEE PLANS IN DUCT 6" X 6" WALL GRILLE
SG-1 KRUEGER S80 SUPPLY 6" X 6" STEEL BAKED ENEMEL SEE PLANS IN DUCT 6" X 6" WALL GRILLE
NOTES:
1. PROVIDE ALL DUCT TRANSITIONS TO AND FROM GRILLES/REGISTERS/DIFFUSERS AS REQUIRED.
2. CONTRACTOR SHALL VERIFY EXACT BUILDING CONSTRUCTION AND CEILING TYPES AND PROVIDE THE CORRECT FRAMES FOR ALL AIR DIFFUSION PRODUCTS AS REQUIRED.
3. PROVIDE MANUAL VOLUME DAMPERS FOR CONNECTION TO ALL GRD'S. PROVIDE MANUAL VOLUME DAMPERS WITH 2" STAND-OFF BRACKETS.
4. PROVIDE EXTENDED LINKAGE FROM HAND DAMPER TO A FLUSH CUP DAMPER REGULATOR IN ALL HARD CEILING LOCATIONS (HARD INACCESSIBLE CEILINGS. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR ALL TYPES OF CEILINGS.
5. SEE DRAWINGS FOR FURTHER GRD REQUIREMENTS.
LOUVER SCHEDULE
PLAN CODE MANUF. MODEL NUMBER FUNCTION SIZE
FREE
AREA VEL.
PRES DROP MATERIAL FINISH CFM DAMPER REMARKS
L-1 RUSKIN ELF6375DX EXHAUST 39" X 12" 787 0.08 ALUMINUM ARCHITECT SELECTED SEE PLANS BACKDRAFT SEE NOTES BELOW
L-2 RUSKIN ELF6375DX EXHAUST 27" X 12" 776 0.07 ALUMINUM ARCHITECT SELECTED SEE PLANS BACKDRAFT SEE NOTES BELOW
NOTES: 1. PROVIDE EACH LOUVER WITH A MOTORIZED DAMPER. COORDINATE WITH EC ON INSTALLATION. TC CONTRACTOR RESPONSIBLE FOR LOW VOLTAGE CONNECTIONS AND CONDUIT.
2. SLOPE BOTTOM OF DUCT TOWARDS LOUVER CONNECTION. SEE DETAIL 11/M4.1 FOR MORE DETAILS.
HISTORIC HOT WATER RADIANT HEATER SCHEDULE
PLAN
CODE
MANUF.
MODEL
NUMBER
ENCLOSURE PERFORMANCE
REMARKS
SECTIONS SIZE (L/W/H) BTU GPM EWT °F TEMP CHANGE °F
HRP-1 BURNHAM
SLENDERIZED
19-4 14 24 12" / 4 7
16" / 19" 3808 0.5 180 20
HISTORIC BATHROOM
HEATER
HRP-2 BURNHAM
SLENDERIZED
25-6 18 31 12" / 6 15
16" / 25" 9180 1 180 20 ELEVATOR LOBBY HEATER
HRP-3 BURNHAM
SLENDERIZED
25-6 26 45 12" / 6 15
16" / 25" 13260 1.5 180 20
STAIRWELL / CORRIDOR
HEATER
HRP-4 BURNHAM
SLENDERIZED
25-6 16 28" / 6 15
16" / 25" 8160 1 180 20 SUITE 419 HEATER
NOTES:
1. ROUTE PIPING THROUGH FLOOR JOISTS AND UP THROUGH FLOOR TO RADIATOR. TRANSITION TO SCHEDULE 40 STEEL WITH DIELECTRIC NIPPLE UNDER FLOOR AND CLAMP
SCHEDULE 40 PIPE TO FLOOR. SEE DETAIL 6/M4.1 FOR MORE INFORMATION.
2. PROVIDE WITH BOTTOM SUPPLY AND RETURN CONNECTIONS. SEE DETAIL 6/M4.1 FOR PIPE MATERIALS AND REQUIREMENTS.
3. PROVIDE HOT WATER 2-WAY CONTROL VALVE AND ISOLATION VALVE IN WALL NEAR UNIT BEHIND ACCESS PANEL.
ERV COIL SCHEDULE
PLAN
CODE
MANUF. MODEL NUMBER FUNCTION
ELEMENT DATA AIR SIDE LIQUID SIDE
SENS
HTG MBHTYPE ROW
LENGTH
(IN)
HEIGHT
(IN)
F.V.
FPM
CFM
PD, IN
W.C.
EAT
DB
LAT
DB
GPM
PD, FT
H2O
EWT
°F
LWT °F
HWC-1 TEMTROL 5WC-8-12x14x2-9AL TEMPER HRV AIR HW 2 14 12 771 900 0.33 55 98.4 3.7 0.8 180 160 34.6
HWC-2 TEMTROL 5WC-16-12x12x2-6AL TEMPER HRV AIR HW 2 12 12 514 600 0.10 55 98.2 2.4 2.6 180 160 23.0
NOTES:
1. PROVIDE 2 WAY CONTROL VALVE AT PIPE CONNECTION. SEE DETAIL 2/M4.2 FOR PIPING CONNECTION DETAILS.
2. PROVIDE FREEZESTAT IN DUCT DOWN STREAM OF COIL.
PUMP SCHEDULE (35% PROPYLENE GLYCOL)
PLAN
CODE
MANUF.
MODEL
NUMBER
SIZE RPM GPM FT OF HD
ELECTRICAL DATA
REMARKS
HP VOLT AMP PH
P-1 TACO 0010-F3 1 1/2" X 1 1/2" 3250 23 10 1/8 115 1.10 1
SEE NOTES
BELOW
P-2 TACO 007-F5 1 1/4" X 1 1/4" 3250 11 10 1/25 115 0.74 1
SEE NOTES
BELOW
NOTES:
1. RADIANT SNOW MELT PUMP. CAST IRON CASING, STAINLESS STEEL CARTRIDGE PUMP. PUMP SEALS SHALL BE COMPATIBLE WITH PROPYLENE GLYCOL. CONNECT PUMPS TO
EXISTING BUILDING AUTOMATION SYSTEM.
GENERAL NOTES
1. THE CONTRACTING OFFICER HAS THE RIGHT OF REFUSAL FOR ANY SALVAGED MATERIALS AND EQUIPMENT. IF MATERIALS OR EQUIPMENT
ARE REFUSED BY THE CONTRACTING OFFICER, THE GENERAL CONTRACTOR SHALL ASSUME RESPONSIBILITY TO DISPOSE OF THE EQUIPMENT.
2. CONTRACTOR RESPONSIBLE FOR PROVIDING LAMINATED VALVE CHARTS FOR ALL VALVES INSTALLED IN PROJECT UPON SUBSTANTIAL
COMPLETION.
FIRE/SMOKE DAMPER NOTES
1) PROVIDE WITH 120V ACTUATORS.
2) PROVIDE ALL FIRE/SMOKE DAMPERS WITH REMOTE SWITCH
PACKAGE.
RE
VI
SI
ON
M3.1
FIRST FLOOR HYDRONIC PLAN
0 1 2 3 4 5 6 7 8 9 10 inches
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
YELL 101
135239
30402.28.2018
PKG 1
101 E. BROADWAY
BELGRADE, MT 59714
PH: (406) 388-3320
FAX: (406) 388-3389
ACE PROJECT #: 13BZ4199.005
PROJECT NO:
REVISIONS:
PMIS NO. 205796
15021.40
MAMMOTH HOTEL PHASE II
GUEST WING RENOVATION
NATIONAL PARK SERVICE - US DEPARTMENT OF THE INTERIOR
MAMMOTH HOT SPRINGS, WY - YELLOWSTONE NATIONAL PARK
KEY PLAN
04.09.20181
U P
U P
D N
U P
D N
U P
D N
6.1
6.2
6.3
RRPP
JJGG
EE
A.1
BB
DD FF NN QQKK
5.1
5.2
HH
A.2
CC MMLL
B.1
A
B
GENERAL HYDRONIC NOTES:
KEY HYDRONIC NOTES:
INSTALL FREE STANDING RADIATOR AT APPROXIMATE LOCATION. ROUTE HWS/HWR THROUGH CHASE AND CONNECT AS REQUIRED. INSTALL BALANCE AND ISOLATION VALVE BEHIND ACCESS PANEL IN CHASE.
ROUTE HWS/HWR UP FROM CRAWLSPACE BELOW TO SNOW MELT MANIFOLD AT APPROXIMATE LOCATION SHOWN. PROVIDE ACCESS DOOR IN WALL WITH LOCKING COVER TO ACCESS VALVES.
ROUTE SNOW MELT PIPING THROUGHOUT DOCK IN DASHED AREA AS SHOWN. ROUTE PIPING UNDERNEATH METAL STAIRCASE WITHIN DASHED REGION.
ROUTE SNOW MELT PIPING THROUGHOUT ENTRANCE AND UNDER OVERHANG IN DASHED AREA AS SHOWN. CONTINUE PIPING DOWN SIDEWALK TO CROSSWALK. INSTALL ALL VALVES AND ACCESSORIES BEHIND ACCESS PANEL
LOCATED IN LINEN STORAGE 125.
ROUTE HWS/HWR THROUGH JOIST SPACE AND UP THROUGH FLOOR AT LOCATIONS SHOWN. CONTINUE PIPING TO UH-1 AS SHOWN AND CONNECT AS REQUIRED.
ROUTE HWS/HWR UP IN WALL AND TEE OFF TO EACH RADIANT PANEL AS REQUIRED. INSTALL BALANCE AND ISOLATION VALVES BEHIND PANEL END CAP. PROVIDE END CAP TO COVER EXPOSED PIPING FROM WALL TO PANEL.
CONTINUE HWS/HWR PIPING UP TO FLOOR ABOVE.
SEE ELECTRICAL SHEETS FOR ELECTRIC HEATER LOCATIONS ABOVE BATHROOM DOOR. COORDINATE WITH E.C. FOR INSTALLATION.
MOUNT UNIT HEATER AT APPROXIMATE LOCATION PER MANUFACTURERS RECOMMENDATION.
INSTALL RADIANT PANEL HEATER ON WALL AT APPROXIMATE LOCATION PER MANUFACTURER'S RECOMMENDATION. INSTALL ISOLATION AND BALANCE VALVE BEHIND PANEL END CAP.
ROUTE HWS/HWR THROUGH JOIST SPACE AND THROUGH FLOOR TO EACH RADIANT PANEL. PROVIDE COVER FOR PIPING ALONG WALL. CONTINUE PIPING UP IN WALL TO CEILING SPACE AND ROUTE OVER TO LOCATIONS SHOWN
AND ROUTE UP IN WALL ON FLOOR ABOVE. SEE DETAIL 13/M4.1 FOR MORE INFO. INSTALL ALL VALVES BEHIND PANEL COVER.
ROUTE 3/4" HWS/HWR RETURN UP FROM CRAWLSPACE THROUGH FLOOR TO RADIATOR. CONNECT TO RADIATOR AS REQUIRED. INSTALL BALANCE AND ISOLATION VALVES IN CRAWLSPACE.
ROUTE HWS/HWR PIPING UP IN WALL AS SHOWN FROM CRAWLSPACE TO FIRST FLOOR. ROUTE PIPING THROUGH JOISTS AND CONTINUE PIPING UP TO FLOOR ABOVE. SEE M3.2 FOR PIPE CONTINUATION.
ROUTE 3/4" HWS/HWR UP THROUGH SLAB TO RADIATOR AT APPROXIMATE LOCATION. CONNECT TO RADIATOR PER MANUFACTURERS RECOMMENDATION.
ROUTE HWS/HWR UP FROM BASEMENT TO JOIST SPACE AND OVER TO LOCATION SHOWN AND UP IN WALL ABOVE. TEE OFF FOR RADIANT PANEL ON FIRST FLOOR AND PROVIDE COVER FOR EXPOSED PIPING. INSTALL ALL VALVES
BEHIND RADIANT PANEL COVER.
INSTALL HRP-3 ON BOTTOM LANDING OF STAIRWELL AT APPROXIMATE LOCATION. ROUTE PIPING FROM CRAWLSPACE THROUGH VESTIBULE WALL TO RADIATOR. INSTALL BALANCE AND ISOLATION VALVES IN CRAWLSPACE.
ROUTE 1" HWS/HWR PIPING THROUGH JOISTS AND UP IN WALL ABOVE. SEE M3.2 FOR PIPING CONTINUATION.
INSTALL TEKMAR 090-091 RADIANT SNOW MELT SENSOR IN CONCRETE AT APPROXIMATE LOCATION. CONNECT SENSOR TO RADIANT SNOW MELT CONTROLS IN CRAWLSPACE.
PROVIDE LOCKING COVER FOR THERMOSTAT AT APPROXIMATE LOCATION.
ROUTE SNOW MELT PIPING THROUGHOUT EXISTING BUILDING ENTRY IN DASHED AREA AS SHOWN. CONTINUE PIPING AROUND PATIO OF SKI SHOP. SEE DETAIL 13/M4.2 FOR SNOW MELT PIPING EXTENTS.
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
FT
2FT
FT
HRP
HRP
FT
HRP
1FT
UH
6 6 6 6 66 6 6
6 6 6 66
9 FIRST FLOOR HYDRONIC PLAN
MD3.1 : M3.1 1/8" = 1' - 0"
NORTH
HRP
HRP
HRP
HRP
HRP
HRP
HRP
HRP
11 11
11 11
HRP
10 10
M4.1
HRP
HRP
LUGGAGE
DOCK INTAKE/
RECYLABLES SORTING
LINEN
ELEVATOR
E2
STAIR
S5
LINEN
CART
STORAGE
AMENITY
STORAGE
ACCESSIBLE
BATH
104A
ACCESSIBLE
GUEST
ROOM
GUEST
ROOM
HALLWAY
BATH
106A
KING
GUEST
ROOM
BATH
108A
BATH
116A
BATH
118A
BATH
120A
HISTORIC
BATH
122A
HISTORIC
BATH
114A
GUEST
ROOM
KING
GUEST
ROOM
GUEST
ROOM
KING
GUEST
ROOM
GUEST
ROOM
122LINEN
STORAGE
ELEVATOR
LOBBY
STAIR
S4
VESTIBULE
ACCESSIBLE
GUEST
SUITE
GUEST
ROOM
GUEST
ROOM
GUEST
ROOM
GUEST
ROOM
GUEST
ROOM
GUEST
ROOM
GUEST
ROOM
KING
GUEST
ROOM
GUEST
ROOM
LOCATION
MANAGER
HOUSEKEEPING
OFFICE
OFFICE
ASSISTANT
TIMEKEEPING/
STAFF
LOCKERS
BATH
101A
BATH
103A
BATH
105A
BATH
107A
BATH
109A
ELECTRICAL
BATH
113A
BATH
117A
BATH
115A
MAINT.
HISTORIC
BATH
111A
SLEEPING
ROOM
119 B
ACCESSIBLE
BATH
119 A
VENDING
FT
7 7 7
SM-2
SM-1
1. MECHANICAL CONTRACTOR SHALL CUT ALL FLOORS,
WALLS, CEILINGS AND ROOF AS REQUIRED TO PERFORM
THE WORK DEPICTED IN THESE CONTRACT DOCUMENTS
AND SPECIFICATIONS. GENERAL CONTRACTOR SHALL
PATCH ALL ASSOCIATED FLOORS, WALLS, CEILINGS, AND
ROOF AS REQUIRED TO THE SATISFACTION OF THE
CONTRACTING OFFICER.
2. SEAL ALL MECHANICAL PENETRATIONS THROUGH FIRE
RATED ASSEMBLIES WITH UL-APPROVED FIRE RATED
SYSTEM.
3. HYDRONIC VALVES 2" AND SMALLER TO BE BALL VALVES.
HYDRONIC VALVES LARGER THAN 2" TO BE LUG STYLE
BUTTERFLY VALVES.
4. LOCATE ALL VALVES ABOVE ACCESSIBLE CEILINGS OR
PROVIDE ACCESS PANEL IN CEILING FOR VALVE ACCESS.
ACCESS PANELS SHALL BE RATED WHERE REQUIRED.
5. CONTRACTOR SHALL PROVIDE CONTRACTING OFFICER
WITH VALVE CHART OF ALL VALVES INSTALLED IN PROJECT
UPON COMPLETION.
6. COORDINATE HVAC AND PLUMBING ROUTING AND
EQUIPMENT WITH ALL OTHER TRADES AS REQUIRED.
7. VERIFY EXACT LOCATION OF THERMOSTATS WITH
CONTRACTING OFFICER PRIOR TO INSTALLATION.
9. COORDINATE ACCESS PANEL LOCATIONS WITH
CONTRACTING OFFICER BEFORE INSTALLATION.
RE
VI
SI
ON
M4.3
BASEMENT AND SECOND FLOOR
HYDRONIC PLAN - EXISTING
0 1 2 3 4 5 6 7 8 9 10 inches
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
YELL 101
135239
30402.28.2018
PKG 1
101 E. BROADWAY
BELGRADE, MT 59714
PH: (406) 388-3320
FAX: (406) 388-3389
ACE PROJECT #: 13BZ4199.005
PROJECT NO:
REVISIONS:
PMIS NO. 205796
15021.40
MAMMOTH HOTEL PHASE II
GUEST WING RENOVATION
NATIONAL PARK SERVICE - US DEPARTMENT OF THE INTERIOR
MAMMOTH HOT SPRINGS, WY - YELLOWSTONE NATIONAL PARK
04.09.20181
11 SECOND FLOOR HYDRONIC PLAN - EXISTING BUILDING
M4.3 : M4.3 1/8" = 1' - 0"
NORTH
U P
D N
KEY HYDRONIC DEMOLITION NOTES:
CAREFULLY REMOVE FINISH ON INTERIOR SIDE OF PANTRY WALL AND ROUTE PIPING FROM CU-3
UP IN WALL CAVITY TO CEILING SPACE. CONTINUE PIPING INTO ATTIC SPACE AS SHOWN AND
CONNECT TO EXISTING REFRIGERANT PIPING AT LOCATION SHOWN. FIELD VERIFY EXACT
LOCATION OF EXISTING REFRIGERATION PIPING. PATCH AND REPAIR WALLS AND CEILING AS
REQUIRED.
EXISTING REFRIGERANT PIPING TO REMAIN AS-IS.
EXISTING FAN COIL TO REMAIN AS-IS.
PROVIDE EXISTING CONDENSING UNIT WITH SPRING VIBRATION ISOLATOR RACK. FIELD
FABRICATE RACK FOR AAON UNIT WITH SPRING ISOLATOR IN EACH CORNER. FIELD FABRICATE
ONE RACK FOR BOTH DAIKIN UNITS WITH SIX SPRING ISOLATORS. ENSURE ALL REFRIGERANT
PIPING AND POWER CONNECTIONS REMAIN CONNECTED.
INSTALL CU-3 AT APPROXIMATE LOCATION WITH VIBRATION SPRING ISOLATORS. FIELD FABRICATE
RACK WITH SPRING ISOLATORS ON EACH CORNER. ROUTE PIPING ALONG WALL AS SHOWN TO
MAINTAIN ACCESS THROUGH WINDOW FROM PANTRY.
CONNECT NEW REFRIGERANT PIPING TO EXISTING PIPING AS REQUIRED. FIELD VERIFY EXACT
LOCATION OF EXISTING PIPING. INSULATE ALL NEW REFRIGERANT PIPING.
EX
CU
EX
CU
EX
CU
TO EXISTING FC-6
IN ATTIC
EX
FC-2
EX
FC-1
EX
FC-4
EX
FC-3
EX
FC-5
GENERAL HYDRONIC NOTES:
1. MECHANICAL CONTRACTOR SHALL CUT ALL FLOORS, WALLS, CEILINGS AND ROOF AS REQUIRED TO PERFORM THE WORK DEPICTED IN THESE CONTRACT DOCUMENTS AND SPECIFICATIONS. GENERAL CONTRACTOR SHALL PATCH ALL ASSOCIATED FLOORS, WALLS, CEILINGS, AND ROOF AS
REQUIRED TO THE SATISFACTION OF THE CONTRACTING OFFICER.
2. SEAL ALL MECHANICAL PENETRATIONS THROUGH FIRE RATED ASSEMBLIES WITH UL-APPROVED FIRE RATED SYSTEM.
3. HYDRONIC VALVES 2" AND SMALLER TO BE BALL VALVES. HYDRONIC VALVES LARGER THAN 2" TO BE LUG STYLE BUTTERFLY VALVES.
4. LOCATE ALL VALVES ABOVE ACCESSIBLE CEILINGS OR PROVIDE ACCESS PANEL IN CEILING FOR VALVE ACCESS. ACCESS PANELS SHALL BE RATED
WHERE REQUIRED.
5. CONTRACTOR SHALL PROVIDE CONTRACTING OFFICER WITH VALVE CHART OF ALL VALVES INSTALLED IN PROJECT UPON COMPLETION.
6. COORDINATE HVAC AND PLUMBING ROUTING AND EQUIPMENT WITH ALL OTHER TRADES AS REQUIRED.
CONFERENCE ROOM
CONFERENCE ROOM
PANTRY
HALLWAY
STOR
STAIR
S1
BOARD ROOM
CU
TO EXISTING FC-10
IN ELECTRICAL
ROOM
9 CRAWLSPACE MECHANICAL PLAN - EXISTING BUILDING
MD4.3 : MD4.3 1/8" = 1' - 0"
NORTH
U P
D A
C B
KEY HYDRONIC DEMOLITION NOTES:
EXISTING FAN COIL FC-10 TO REMAIN AS-IS. CONNECT
COMMUNICATIONS LINE TO NEW CU-3 LOCATED ON
ROOF BY PANTRY.
EXISTING REFRIGERANT PIPING TO REMAIN AS-IS. SEE
SHEET M4.3 FOR NEW REFRIGERANT PIPING
CONNECTIONS AND ROUTING.
EXISTING THERMOSTAT TO REMAIN AS-IS CONNECTED
TO FC-10.
ROUTE 22"X16" OUTSIDE AIR DUCT UP IN CHASE TO
LOUVER L-6. INSULATE ENTIRE DUCT.
INSTALL L-6 LOUVER ON EXTERIOR WALL UNDER
EXISTING LOUVER. MOVE EXISTING LOUVER UP TO FIT
NEW LOUVER BELOW AND EXTEND EXISTING DUCT AS
REQUIRED. PATCH AND REPAIR WALL AS REQUIRED.
SUSPEND EXHAUST FAN FROM CEILING AT
APPROXIMATE LOCATION. UNIT SHALL BE CONTROLLED
BY REVERSE ACTING THERMOSTAT TIED TO THE LOW
LEAKAGE MOTORIZED DAMPER IN DUCT. CONNECT FAN
AND THERMOSTAT TO BUILDING AUTOMATION SYSTEM
AS REQUIRED.
FIELD FABRICATE FILTER RACK INSIDE DUCT AND
INSTALL MERV 8 FILTERS. PROVIDE ACCESS PANEL IN
CEILING TO ACCESS FILTER RACK.
MOUNT REVERSE ACTING THERMOSTAT ON WALL AT
APPROXIMATE LOCATION SHOWN. TIE THERMOSTAT
INTO EXHAUST FAN AND LOW LEAKAGE MOTORIZED
DAMPER IN EXHAUST DUCT AND INTEGRATE INTO
BUILDING AUTOMATION SYSTEM.
SUSPEND EXHAUST FAN FROM CEILING WITH VIBRATION
ISOLATORS. CONNECT DUCT TO FAN WITH FLEX
CONNECTORS. TERMINATE DUCT WITH OPEN END IN
MECHANICAL ROOM.
INSTALL LOW LEAKAGE MOTORIZED DAMPER IN DUCT AT
APPROXIMATE LOCATION SHOWN. CONNECT DAMPER
TO REVERSE ACTING THERMOSTAT AND EXHAUST FAN
TIED INTO BUILDING AUTOMATION SYSTEM.
INSTALL LOW LEAKAGE MOTORIZED DAMPER IN DUCT AT
APPROXIMATE LOCATION SHOWN. PROVIDE ACCESS TO
DAMPERS IN HARD LID CEILING IN CORRIDOR. CONNECT
MOTORIZED DAMPERS TO EXHAUST FANS. DAMPERS
SHALL OPEN WHEN EXHAUST FAN IS ENERGIZED.
INSTALL SG-1 AT APPROXIMATE LOCATION SHOWN.
RELOCATE EXISTING HWS AND FIRE SPRINKLER PIPING
AS REQUIRED TO FIT DUCTWORK AND GRILLE.
SAW CUT 20" X 20" HOLE THROUGH WALL AND ROUTE 20"
X 20" DUCT THROUGH WALL. TERMINATE DUCT WITH
OPEN END. FIELD VERIFY EXACT LOCATION OF SAW CUT.
ROUTE 20" X 20" DUCT THROUGH WALL AND TERMINATE
WITH OPEN ENDS.
CONDENSING UNIT SCHEDULE
PLAN
CODE
MANUF
MODEL
NUMBER
SERVES LOCATION
TOTAL CAP.
BTUH
SEN. CAP.
BTUH
AMB
TEMP
COMPRESSOR REFERENCE
PRODUCT
REMARKS
VOLTS PH FLA
CU-3 DAIKIN RXTQ48TAVJU FC-10 ROOF BY PANTRY 49.5 45.5 95 208 1 29.1 R-410A SEE NOTES BELOW
NOTES: PROVIDE WITH FACTORY DISCONNECT. INSTALL UNIT ON ROOF SUCH THAT ACCESS TO WINDOW AND OTHER UNITS REMAIN. PROVIDE WITH SPRING VIBRATION ISOLATORS.
MECHANICAL
ELECTRICAL / TEL DATA
HALLWAY
STAIR
S1
EX
FC-10
T
T
EF
EF
4 5
8 T
SG-1
EXHAUST FAN SCHEDULE
PLAN
CODE
MANUF
MODEL
NUMBER
CFM ESP RPM
ELECTRICAL
REMARKS
VOLT AMP PH
EF-4 ACME DM10 2200 0.5 913 120 13.8 1 BELT DRIVE
EF-5 ACME DM10 800 0.5 913 120 13.8 1 BELT DRIVE
NOTES: 1) PROVIDE REVERSE ACTING THERMOSTAT AND INTEGRATE INTO BUILDING AUTOMATION
SYSTEM. FANN SHALL OPERATE AND DAMPERS SHALL OPEN WHEN TEMPERATURE OF SPACE
EXCEEDS TEMPERATURE SETPOINT. PROVIDE FACTORY MOUNTED DISCONNECT.
GRILLE - LOUVER SCHEDULE
PLAN
CODE
MANUF
MODEL
NUMBER
MATERIAL FINISH CFM
VOLUME
DAMPER
REMARKS
SG-1 KRUEGER 580 ALUMINUM WHITE
SEE
PLAN
MOTORIZED
IN DUCT
30" X 12" GRILLE
SEE BELOW
SG-2 KRUEGER 580 ALUMINUM WHITE
SEE
PLAN
MOTORIZED
IN DUCT
14" X 10" GRILLE
SEE BELOW
L-3 RUSKIN ELF6375DX ALUMINUM
MATCH
EXTERIOR
3200 BACKDRAFT
22" x 48" LOUVER
SEE BELOW
NOTES: 1) PROVIDE ALL DUCT TRANSITIONS TO AND FROM GRILLES AND LOUVERS AS REQUIRED. PROVIDE
MOTORIZED DAMPERS IN DUCT BEFORE GRILLE. CONNECT MOTORIZED DAMPERS TO REVERSE ACTING
THERMOSTAT. PROVIDE ACCESS TO DAMPER IN CORRIDOR CEILING.
2) INSTALL L-3 BELOW EXISTING LOUVER AND PATCH AND REPAIR WALL AS REQUIRED.
SG-2
KEY PLAN KEY PLAN
RE
VI
SI
ON
P1.0
PLUMBING LEGENDS
0 1 2 3 4 5 6 7 8 9 10 inches
DESIGNED
CADD
TECH. REVIEW
DATE
SUB SHEET NO. DRAWING NO.
PKG.
NO.
SHEET
OF
TITLE OF SHEET
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
YELL 101
135239
30402.28.2018
PKG 1
101 E. BROADWAY
BELGRADE, MT 59714
PH: (406) 388-3320
FAX: (406) 388-3389
ACE PROJECT #: 13BZ4199.005
PROJECT NO:
REVISIONS:
PMIS NO. 205796
15021.40
MAMMOTH HOTEL PHASE II
GUEST WING RENOVATION
NATIONAL PARK SERVICE - US DEPARTMENT OF THE INTERIOR
MAMMOTH HOT SPRINGS, WY - YELLOWSTONE NATIONAL PARK
04.09.20181
AND SCHEDULES 226
DRAWING LIST
P1.0 PLUMBING LEGENDS AND SCHEDULES P2.3 THIRD FLOOR DOMESTIC WASTE AND VENT PLAN
PD2.0 CRAWLSPACE PLUMBING DEMOLITION PLAN P2.4 FOURTH FLOOR DOMESTIC WASTE AND VENT PLAN
PD2.1 FIRST FLOOR PLUMBING DEMOLITION PLAN P3.0 CRAWLSPACE DOMESTIC WATER PLAN
PD2.2 SECOND FLOOR PLUMBING DEMOLITION PLAN P3.1 FIRST FLOOR DOMESTIC WATER PLAN
PD2.3 THIRD FLOOR PLUMBING DEMOLITION PLAN P3.2 SECOND FLOOR DOMESTIC WATER PLAN
PD2.4 FOURTH FLOOR PLUMBING DEMOLITION PLAN P3.3 THIRD FLOOR DOMESTIC WATER PLAN
PD4.0 TUNNEL PLUMBING DEMOLITION PLAN P3.4 FOURTH FLOOR DOMESTIC WATER PLAN
P2.0 CRAWLSPACE DOMESTIC WASTE AND VENT PLAN P4.0 PLUMBING DETAILS
P2.1 FIRST FLOOR DOMESTIC WASTE AND VENT PLAN
P2.2 SECOND FLOOR DOMESTIC WASTE AND VENT PLAN
GLOBE VALVE
3-WAY (ELECTRIC)
THIS IS A STANDARDIZED SYMBOLS LEGEND, ALL SYMBOLS SHOWN MAY
or or or
NOT APPEAR ON OR WITHIN THIS SET OF CONTRACT DOCUMENTS.
VENT THRU ROOF
STRAINER W/ BLOW-OFF
3-WAY (PNEU. MTR.)
GAS COCK
3-WAY (PNEUMATIC)
PRESSURE GAUGE
TEMP. GAUGE
SENSOR (TEMP./FLOW)
FLEX. CONNECTION
SOLENOID GATE VALVE
HOSE BIBB
FLOAT VALVE
BALANCING VALVE
DRAIN
PLUG VALVE
CHECK VALVE
STRAINER
VTR
PIPING FITTINGS, VALVES & SPECIALTIES
P1P-1 or or or or or
PRESS. REDUCING
2-WAY (ELECTRIC)
2-WAY (PNEU. MTR.)
2-WAY (SOLENOID)
PNEUMATIC MOTOR
ANGLE VALVE
EXIST. FIXTURE TO REMAIN EXIST. FIXT. TO BE REMOVED NEW PLUMBING FIXTURE
FIXT. NUMBER - SEE SCHED.
GATE VALVE
BALL VALVE
CROSS IN HORIZ. RUN
90° AND 45° ELBOWS
END CAP CONNECTION
BELL AND SPIGOT
UNION FITTING
BRANCH TEE TURNED UP
BRANCH TEE TURNED DN.
DOMESTIC PIPING
DIRECTION OF FLOW
ELBOW TURNED DN.
TEE TURNED DN.
DROP IN HORIZ. RUN
TEE TURNED UP
ELBOW TURNED UP
REDUCER FITTING
or or
(TYPE)
TEE IN HORIZ. RUN
BRANCH TEE W/ OFFSETEXIST. TO BE REMOVED
GENERAL PIPING
EXISTING TO REMAIN or or
PUMPFIRE EXTINGUISHER
FIRE SPRINKLER HEAD
DISCONNECTION
P.O.D.C.-POINT OF
P.O.C.-POINT OF CONNECTION
MISCELLANEOUS/MECHANICAL PIPING
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RECIRC.
NATURAL GAS
BUTTERFLY VALVE
SANITARY WASTE - ABOVE FLOOR
SANITARY WASTE - BELOW FLOOR
VENT - ABOVE FLOOR
VENT - BELOW FLOOR
STEAM
or or
(TYPE)
G STM
HWRC
HW
CW
V
V
SAN
SAN
PLUMBING SYMBOLS LEGEND
ELEVATOR SUMP PUMP SCHEDULE
PLAN
CODE
MANUFACTURER MODEL NUMBER RPM GPM FT OF HD
ELECTRICAL
REMARKS
HP VOLT PH AMP
SP-1 LIBERTY MODEL 233-2 3450 30 10 1/3 115 1 5.2 INSTALL IN ELEVATOR PIT. SEE NOTES
PLUMBING FIXTURE SCHEDULE
PLAN CODE ITEM MANUFACTURER MODEL NUMBER MATERIAL & FINISH TRIM
ROUGH-IN SIZE
REMARKS
CW HW SAN VENT
BT-1 BATH TUB/SHOWER SIGN OF THE CRAB P0700C
ENAMELED WHITE CAST IRON, CHROME
TRIM
SIGN OF THE CRAB SP889C1* FAUCET, SIGN OF THE CRAB
P0342C SUPPLY, KOHLER K-45202 SHOWER, SIGN OF THE
CRAB P0007BEC DRAIN
2"
2" 2" 11
2" FAUCET TO BE P0889C BODY WITH SHOWER DIVERTER ASSEMBLY LESS HANDSHOWER. PROVIDE WITH ALL NECESSARY ACCESSORIES FOR A
COMPLETE INSTALLATION.
BT-2 ACCESSIBLE TUB/SHOWER KOHLER MEMOIRS K-722 CAST IRON W/ ENAMEL, CHROME TRIM
KOHLER K-496-V DIVERTER SPOUT, KOHLER K-TS16117-4A
HANDLE, KOHLER K-99899 HAND SHOWER, KOHLER K-304
VALVE
2"
2" 2" 11
2" 1.5 GPM ACCESSIBLE BATH/SHOWER WITH DIVERTER SPOUT.
BT-3 HISTORIC TUB/SHOWER OWNER PROVIDED ---- ----
SIGN OF THE CRAB SP889C1* FAUCET, SIGN OF THE CRAB
P0342C SUPPLY, KOHLER K-45202 SHOWER, SIGN OF THE
CRAB P0007BEC DRAIN
2"
2" 2" 11
2" FAUCET TO BE P0889C BODY WITH SHOWER DIVERTER ASSEMBLY LESS HAND SHOWER. REFINISH EXISTING ENAMEL FIXTURE AND INSTALL NEW
SHOWER TRIM. PROVIDE WITH ALL NECESSARY ACCESSORIES FOR A COMPLETE INSTALLATION.
BT-4 BATH TUB WITH TUB FILLER SIGN OF THE CRAB P0700C
ENAMELED WHITE CAST IRON, CHROME
TRIM
SIGN OF THE CRAB SP889C1* FAUCET, SIGN OF THE CRAB
P0342C SUPPLY, SIGN OF THE CRAB P0007BEC DRAIN
2"
2" 2" 11 2"
FAUCET TO BE P0889C BODY ONLY ASSEMBLY WITH PLUG FOR SHOWER. PROVIDE WITH ALL NECESSARY ACCESSORIES FOR A COMPLETE
INSTALLATION.
EW-1 EYE/FACE WASH BRADLEY S19294JBT STAINLESS STEEL CABINET S19-2000EFX MIX VALVE 1 2"
2" 2" 11
2" EMERGENCY FOLD DOWN EYE WASH. PROVIDE WITH MANUFACTURER RECOMMENDED THERMOSTATIC MIX VALVE AND INSTALL IN MAINTENANCE
CABINET OF EYE WASH UNIT.
FD-1 FLOOR DRAIN SCHLUTER KERDI-DRAIN KD2/ABS/6RE ABS BODY WITH STAINLESS STEEL GRATE 6RE 6" GRATE ---- ---- 2" 11
2" PROVIDE WITH TRAP GUARD.
FS-1 FLOOR SINK WADE W-9113-16 CAST IRON BODY A.R.E. INTERIOR ---------- ---- --- 3" 11
2" PROVIDE W/ 3 4 GRATE AND TRAP GUARD.
HB-1 HOSE BIBB WOODFORD MODEL 68 CHROME "T" HANDLE KEY 3
4" ---- ---- ---- BACKFLOW PROTECTED W/ VACUUM BREAKER
KS-1 1-COMP SINK 71
2" DEPTH KOHLER NORTHLAND K-6589-U ENAMELED CAST IRON, CHROME TRIM SIGN OF THE CRAB SP549-12C1* 1
2"
2" 2" 11 2"
WALL MOUNTED FAUCET WITH LEVER HANDLES. INSULATE HW, CW, SAN, & STOPS AS REQ'D. OFFSET P-TRAP. MOUNT TO CONFORM TO ALL A.N.S.I. &
A.B.A. REQUIREMENTS. GRID STRAINER AND STOPPER TYPE DRAIN.
LAV-1 COUNTERTOP LAVATORY KOHLER KELSTON K-2382 VITREOUS CHINA WHITE, CHROME TRIM SIGN OF THE CRAB SP549-12C1* 1 2"
2" 2" 11
2" WALL MOUNTED FAUCET WITH LEVER HANDLES. INSULATE HW, CW, SAN, & STOPS AS REQ'D. PROVIDE WITH LIFT AND TURN DRAIN.
LAV-2
ACCESSIBLE COUNTERTOP
LAVATORY
KOHLER KELSTON K-2382 VITREOUS CHINA WHITE, CHROME TRIM SIGN OF THE CRAB SP549-12C1* 1
2"
2" 2" 11 2"
WALL MOUNTED FAUCET WITH LEVER HANDLES. INSULATE HW, CW, SAN, & STOPS AS REQ'D. OFFSET P-TRAP. MOUNT TO CONFORM TO ALL A.N.S.I. &
A.B.A. REQUIREMENTS. PROVIDE WITH LIFT AND TURN DRAIN.
LAV-3 HISTORIC LAVATORY OWNER PROVIDED --- --- SIGN OF THE CRAB P0549-12C FAUCET 1 2"
2" 2" 11
2" DECK MOUNTED FAUCET WITH CROSS HANDLES. INSTALL NEW TRIM. VERIFY EXISTING HOLE PUNCHING CENTERS OF ALL FIXTURES BEFORE
ORDERING FAUCET. PROVIDE WITH LIFT AND TURN DRAIN.
LAV-4 PEDESTAL LAVATORY KOHLER MEMOIRS K-2238-8 VITREOUS CHINA WHITE, CHROME TRIM SIGN OF THE CRAB P0565-8C 1 2"
2" 2" 11
2" DECK MOUNTED FAUCET WITH LEVER HANDLES. INSULATE HW, CW, SAN, & STOPS AS REQ'D. OFFSET P-TRAP. MOUNT TO CONFORM TO ALL A.N.S.I. &
A.B.A. REQUIREMENTS. PROVIDE WITH LIFT AND TURN DRAIN AND CHROME CENTER HOLE COVER.
MS-1 MOP SINK FIAT MSB-2424 MOLDED STONE KOHLER K-8928 FAUCET 3
4"
4" 3" 11
2" PROVIDE WITH VACUUM BREAKER, INTEGRAL CHECK STOPS, HOSE & BRACKET, FIAT MOP HANGER #889-CC, & VINYL BUMPER GUARD #E-77-AA.
SB-1 ICE MACHINE SUPPLY BOX OATEY 39121 THERMOSET FIRE-RATED PLASTIC, WHITE --- 1 2" --- --- --- FIRE-RATED, QUARTER TURN VALVE. PROVIDE ICE MAKER WITH BACKFLOW PREVENTION.
SH-1 SHOWER VALVE AND TRIM KOHLER K-304-KS BRASS VALVE, CHROME TRIM
KOHLER K-TS16117-4A HANDLE, K-45202 SHOWERHEAD,
KERDI-LINE KLB LINEAR DRIAIN
2"
2" 2" 11
2" 1.5 GPM SHOWER. CONTRACTOR TO VERIFY LINEAR TRENCH DRAIN LENGTH.
SH-2
ACCESSIBLE SHOWER VALVE AND
TRIM
KOHLER K-304-KS BRASS VALVE, CHROME TRIM
KOHLER K-TS16117-4A HANDLE, KOHLER K-99899 HAND
SHOWER, KERDI-LINE KLB LINEAR DRIAIN
2"
2" 2" 11 2"
1.5 GPM ACCESSIBLE SHOWER. MOUNT TO CONFORM TO ALL A.N.S.I. & A.B.A. REQUIREMENTS. CONTRACTOR TO VERIFY LINEAR TRENCH DRAIN
LENGTH.
TD-1 LINEAR SLOT DRAIN SCHLUTER KERDI-LINE STAINLESS STEEL BODY KLB PERFORATED GRATE ---- ---- 2" 11 2" PROVIDE WITH TRAP SEAL. CONTRACTOR TO VERIFY EXACT CHANNEL LENGTH PER ARCHITECT DRAWINGS.
WC-1 F.T. H.C. F.M. WATER CLOSET KOHLER MEMOIRS K-3812 VITREOUS CHINA WHITE,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.