Seismic Stabilization and Rehabilitation of Mammoth Hotel Phase II
Solicitation number
140P2018R0039
Issued by

About this file

Amendment 0002 - List of Changes

View the file

Other files

File Type Posted
Amendment_0009_Q_and_A_05.04.2018.pdf PDF
Amendment_0009_SF30.pdf PDF
Amendment_0008_Addendum_4.pdf PDF
Amendment_0008_Attendance_List_Second_Site_Visit.pdf PDF
Amendment_0008_Q_and_A.pdf PDF
Amendment_0008_SF30.pdf PDF
Amendment_0007_Alternate_Contract_Price_Schedule_B.pdf PDF
Amendment_0007_SF30.pdf PDF
Amendment_0007_SF_1442.pdf PDF
Amendment_0007_Clause_Updates.pdf PDF
Amendment_0007_Alternate_Contract_Price_Schedule_C.pdf PDF
Amendment_0007_Alternate_Contract_Price_Schedule_A.pdf PDF
Amendment_0007_Section_L_&_M.pdf PDF
Amendment_0006_Addendum_3.pdf PDF
Amendment_0006_SF30.pdf PDF
Replacement_Q_and_A_from_Amendment_0004_04.26.2018.pdf PDF
Amendment_0006_-_Q&A_04.26.2018.pdf PDF
SF30_Amendment_0005.pdf PDF
Amendment_0004_SF30.pdf PDF
Amendment_0004_Q&A.pdf PDF
Amendment_0004_Attendance_List_Site_Visit_04.11.2018.pdf PDF
Amendment_0004_Addendum_2_YELL_205796.pdf PDF
B09_YELL_205796_Amend_0003__Addendum_1_Specs.pdf PDF
B09_YELL_205796_Amend_0003_Q&A.pdf PDF
B09__YELL_205796_Amend_0003_SF_30.pdf PDF
B09_YELL_205796_Amend_0002_Q&A.pdf PDF
B09_Amendment_0002_Attach_02_Geotechnical_Report.pdf PDF
B09_Amendment_0002_Attach_01_HSR_.pdf PDF
B08_YELL_205796_140P2018R0039_Amend_0002.pdf PDF
B09_Amendment_0002_Attach_03_Hazardous_Material_Survey.pdf PDF
B08_YELL_205796_140P2018R0039_Amend_0001.pdf PDF
B08_YELL_205796_Solit_Attach_02A_Drawings_Volume_1.pdf PDF
B08_YELL_205796_Solit_Attach_02B_Drawings_Volume_2.pdf PDF
B08_YELL_205796_Solit_Attach_01A_Specs_Volume_I.pdf PDF
B08_YELL_205796_Solit_Attach_07_Bid_Bond_Form.pdf PDF
B08_YELL_205796_140P2018R0039.pdf PDF
B08_YELL_205796_Solit_Attach_06_SubRefs.doc DOC document
B08_YELL_205796_Solit_Attach_01B_Specs_Volume_II.pdf PDF
B08_YELL_205796_Solit_Attach_05_KeyPers.docx DOCX document
B08_YELL_205796_Solit_Attach_03_WD.pdf PDF
B08_YELL_205796_Solit_Attach_11_SubCtrPlan.doc DOC document
B08_YELL_205796_Solit_Attach_12_PastPerf.doc DOC document
B08_YELL_205796_Solit_Attach_08_Equals.doc DOC document
B08_YELL_205796_Solit_Attach_10_GenRefs.doc DOC document
B08_YELL_205796_Solit_Attach_09_HazMat.doc DOC document
B08_YELL_205796_Solit_Attach_04_Experience.docx DOCX document
B01_YELL_205796_Synopsis_PreSolitNotice.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The following changes to solicitation 140P2018R0061 are as follows as a result of Amendment 0002:

1. Section F – Clause 52.211-10 Alt 1 (Apr 1984) is here by corrected to Clause 52.211-10 (Apr 1984), clause 52.211-10 reads as follows:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR

1984)

The Contractor shall be required to

(a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,

(b) prosecute the work diligently, and

(c) complete the entire work relating to the interior guest wing ready for overnight guest occupancy use not later than May 31, 2019, and all remaining work under the contract in its entirety by September 02, 2019. The time stated for completion shall include final cleanup of the premises.

(End of Clause)

2. Section F – Clause 52.211-12 (Sept 2000) verbiage is changed from:

52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,338.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause) is changed to:

52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,338.00 for each calendar day of delay until the work is completed or accepted, the amount of $1,338.00 applies to both period of performance end dates of May 31, 2019 and September 02, 2019.

(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

3. Section L – Factor IV – Project, Cost, and Schedule Management provided sample dates to build the schedule is changed from:

Offeror shall submit a general management approach narrative for maintaining and managing project safety, quality control and coordination, cost management, and schedule management.

The narrative should address how these general management procedures will be applied specifically to the scope, location, and schedule of this project. In addition, the offeror shall submit a proposed construction schedule. There is no pre-printed form for this submittal:

Notice to Proceed: September 10, 2018 (Monday)

Project End Date: September 09, 2019 (Monday)

The narrative and construction schedule shall provide a robust project management plan that meets the project objectives and requirements in an efficient and expeditious manner.”

is changed to:

“Offeror shall submit a general management approach narrative for maintaining and managing project safety, quality control and coordination, cost management, and schedule management.

The narrative should address how these general management procedures will be applied specifically to the scope, location, and schedule of this project. In addition, the offeror shall submit a proposed construction schedule. There is no pre-printed form for this submittal:

Notice to Proceed: August 01, 2018 (Wednesday) Beneficial Occupancy of Guest Wing: May 31, 2019 (Friday) Project End Date: September 02, 2019 (Monday)

The narrative and construction schedule shall provide a robust project management plan that meets the project objectives and requirements in an efficient and expeditious manner.”

52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
52.211-12 Liquidated Damages—Construction (SEPT 2000)

File details come from the government source that posted it.