B08_YELL_205796_140P2018R0039_Amend_0001.pdf

PDF 154 KB Posted

Attached to
Seismic Stabilization and Rehabilitation of Mammoth Hotel Phase II
Solicitation number
140P2018R0039
Issued by

About this file

Amendment 0001 - Correct Site Visit Date

View the file

Other files

File Type Posted
Amendment_0009_Q_and_A_05.04.2018.pdf PDF
Amendment_0009_SF30.pdf PDF
Amendment_0008_Addendum_4.pdf PDF
Amendment_0008_Attendance_List_Second_Site_Visit.pdf PDF
Amendment_0008_Q_and_A.pdf PDF
Amendment_0008_SF30.pdf PDF
Amendment_0007_Alternate_Contract_Price_Schedule_B.pdf PDF
Amendment_0007_SF30.pdf PDF
Amendment_0007_SF_1442.pdf PDF
Amendment_0007_Clause_Updates.pdf PDF
Amendment_0007_Alternate_Contract_Price_Schedule_C.pdf PDF
Amendment_0007_Alternate_Contract_Price_Schedule_A.pdf PDF
Amendment_0007_Section_L_&_M.pdf PDF
Amendment_0006_Addendum_3.pdf PDF
Amendment_0006_SF30.pdf PDF
Replacement_Q_and_A_from_Amendment_0004_04.26.2018.pdf PDF
Amendment_0006_-_Q&A_04.26.2018.pdf PDF
SF30_Amendment_0005.pdf PDF
Amendment_0004_SF30.pdf PDF
Amendment_0004_Q&A.pdf PDF
Amendment_0004_Attendance_List_Site_Visit_04.11.2018.pdf PDF
Amendment_0004_Addendum_2_YELL_205796.pdf PDF
B09_YELL_205796_Amend_0003__Addendum_1_Specs.pdf PDF
B09_YELL_205796_Amend_0003_Q&A.pdf PDF
B09__YELL_205796_Amend_0003_SF_30.pdf PDF
B09_YELL_205796_Amend_0002_Q&A.pdf PDF
B09_Amendment_0002_Attach_02_Geotechnical_Report.pdf PDF
B09_Amendment_0002_List_of_Changes.pdf PDF
B09_Amendment_0002_Attach_01_HSR_.pdf PDF
B08_YELL_205796_140P2018R0039_Amend_0002.pdf PDF
B09_Amendment_0002_Attach_03_Hazardous_Material_Survey.pdf PDF
B08_YELL_205796_Solit_Attach_02A_Drawings_Volume_1.pdf PDF
B08_YELL_205796_Solit_Attach_02B_Drawings_Volume_2.pdf PDF
B08_YELL_205796_Solit_Attach_01A_Specs_Volume_I.pdf PDF
B08_YELL_205796_Solit_Attach_07_Bid_Bond_Form.pdf PDF
B08_YELL_205796_140P2018R0039.pdf PDF
B08_YELL_205796_Solit_Attach_06_SubRefs.doc DOC document
B08_YELL_205796_Solit_Attach_01B_Specs_Volume_II.pdf PDF
B08_YELL_205796_Solit_Attach_05_KeyPers.docx DOCX document
B08_YELL_205796_Solit_Attach_03_WD.pdf PDF
B08_YELL_205796_Solit_Attach_11_SubCtrPlan.doc DOC document
B08_YELL_205796_Solit_Attach_12_PastPerf.doc DOC document
B08_YELL_205796_Solit_Attach_08_Equals.doc DOC document
B08_YELL_205796_Solit_Attach_10_GenRefs.doc DOC document
B08_YELL_205796_Solit_Attach_09_HazMat.doc DOC document
B08_YELL_205796_Solit_Attach_04_Experience.docx DOCX document
B01_YELL_205796_Synopsis_PreSolitNotice.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2018R0039 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

03/22/20180001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/22/2018

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of Amendment 0001 is to correct the Pre-Award Site Visit date from Tuesday, April 10, 2018 to Wednesday, April 11, 2018. The time for the Pre-Award Site Visit at 9:00 a.m. and meeting location remains unchanged.

1. Clause 52.236-27 Site Visit (Construction) - Alternate I (FEB 1995) has been updated and attached as part of this Amendment 0001.

2. There is no extension to the response date issued as part of this Amendment 0001, response date remains 04/30/2018 @ 2:30 p.m. (MT)

3. There is no extension to the due date for receiving questions, the due date to receive questions remains 04/23/2018 @ 2:30 p.m. (MT)

Legacy Doc #: NPS

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Frank Camacho

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

03/22/2018

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2018R0039/0001

Period of Performance: 06/01/2018 to 11/01/2019

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Solicitation Revised 12/20/17

Document No.

140P2018R0039

Document Title

YELL 205796 – Seismic Stabilization Mammoth Hotel Phase II

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the

GAO.

(c) A copy of the protest served on the Contracting Officer shall be simultaneously furnished by the protester to the

Department of the Interior Assistant Solicitor, Acquisitions and Intellectual Property, 1849 C Street, NW, Room 6511, Washington, DC 20240.

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the

Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for—

Wednesday, April 11, 2018 at 9:00am (MT)

(c) Participants will meet at—

Lobby of the Mammoth Hot Springs Hotel

Grand Loop Road Yellowstone National Park, WY 82190

*Note* Please call the Yellowstone Visitor Services Office for Current Road Information Before Traveling:

(307) 344-7115 or (307) 344-2107

52.236-28 PREPARATION OF PROPOSALS—CONSTRUCTION (OCT 1997)

(a) Proposals must be (1) submitted on the forms furnished by the Government or on copies of those forms; and

(2) manually signed. The person signing a proposal must initial each erasure or change appearing on any proposal form.

(b) The proposal form may require offerors to submit proposed prices for one or more items on various bases, including—

(1) Lump sum price;

(2) Alternate prices;

(3) Units of construction; or

(4) Any combination of paragraphs (b)(1) through (b)(3) of this provision.

(c) If the solicitation requires submission of a proposal on all items, failure to do so may result in the proposal being rejected without further consideration. If a proposal on all items is not required, offerors should insert the words “no proposal” in the space provided for any item on which no price is submitted.

(d) Alternate proposals will not be considered unless this solicitation authorizes their submission.

B08_YELL 205796_140P2018R0039_Amend 0001 SF-30
B08_YELL 205796_140P2018R0039_Amend 0001 Clause

File details come from the government source that posted it.