B08_140P1422R0002_RFP_Amendment_Letter_6_Q_A_0006.pdf

PDF 75 KB Posted

Attached to
National Park Service, Northern Rockies MABO, Mult
Solicitation number
140P1422R0002
Issued by

View the file

Other files

File Type Posted
Sol_140P1422R0002_Amd_0006.pdf PDF
B08_140P1422R0002_RFP_Amendment_Letter_5_Q_A_0005.pdf PDF
Sol_140P1422R0002_Amd_0005.pdf PDF
B08_140P1422R0002_RFP_Amendment_Letter_4_Site_Visit_Sign_In_Form_0004.pdf PDF
Sol_140P1422R0002_Amd_0004.pdf PDF
B08_140P1422R0002_RFP_Amendment_Letter_4_Q_A_0004.pdf PDF
RFP_Amendment_Letter_3_Q_A_0003.pdf PDF
Sol_140P1422R0002_Amd_0003.pdf PDF
B08_140P1422R0002_MATOC_RFP_Revised_4May2023_0003.pdf PDF
RFP_Amendment_Letter_3_Asbestos_Sampling_Report2May2023_0003.pdf PDF
B08_140P1422R0002_Attachment_J10_Seed_TO_RFP_Form_Revised_4May2023_0003.pdf PDF
RFP_Amendment_Letter_3_Attachment_J6_SEED_TO_SOW_Revised_2May2023_0003.pdf PDF
B08_140P1422R0002_Attachment_J10_Seed_TO_RFP_Form_Revised_27Apr2023_0002.pdf PDF
RFP_Amendment_Letter_2_Drawing_YCC_MESS_HALL_0002.pdf PDF
Amendment_Questions_0002.pdf PDF
RFP_Amendment_Letter_2_Attachment_J6_SEED_TO_SOW_Revised_25Apr2023_0002.pdf PDF
B08_140P1422R0002_MATOC_RFP_Section_B_Revised_27Apr2023_0002.pdf PDF
Sol_140P1422R0002_Amd_0002.pdf PDF
RFP_Amendment_Letter_2_Site_visit_Sign_In_Log_0002.pdf PDF
Sol_140P1422R0002_Amd_0001.pdf PDF
B08_140P1422R0002_Attachment__J2_TO_RFP_Form_Sample.docx DOCX document
B08_140P1422R0002_Attachment_J9__SEED_TO_Proposed_Equals_Request.docx DOCX document
Sol_140P1422R0002.pdf PDF
B08_140P1422R0002_Attachment__J1_NPS_Safety_and_Checklist.pdf PDF
B08_140P1422R0002_Attachment__J4_Past_Performance_Questionnaire.docx DOCX document
B08_140P1422R0002_Attachment_J8_Wage_Determination_Park_Co_Bldg_WY20230013_Dated_27Jan2023.pdf PDF
B08_140P1422R0002_Attachment_J7_SEED_TO_Drawings_2021-11-24.pdf PDF
B08_140P1422R0002_Attachment__J3_Will_Not_Compete.docx DOCX document
B08_140P1422R0002_Attachment_J6_SEED_TO_SOW_Revised_30Mar2023.pdf PDF
B08_140P1422R0002_Attachment_J10_Seed_TO_RFP_Form.docx DOCX document
B08_140P1422R0002_Attachment_J11_Dry_Sprinkler_System_Design_Calculations_2021-11-24.pdf PDF
B08_140P1422R0002_Attachment__J5_LmtOnSubconRpt.xlsx XLSX spreadsheet
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P1422R0002 NR MATOC RFP – Amendment 6 Q&A

1. The building has a drywall Ceiling above the grid ceilings. Does this ceiling layer need to be replaced/repaired prior to the new grid ceiling installation or can this be left out of the new ceiling installation?

• The repair of the ceilings if disturbed by the removal and installation shall be replaced in kind, this is considered a fire wall. In general, the fire suppression system is below the fire wall above the grid ceiling.

2. Is the drywall Ceiling over all areas of the building?

• The drywall ceilings are covered as a finished surface and as a fire break, all disturbed areas shall be repaired or replaced in kind to maintain the code requirement of this building.

3. Wallpaper is installed in areas of the building. With the ceilings be removed or repaired is the wallpaper to be repaired or left as is? Is attic stock available for repairs or is replacement required?

• The requirement does not specify any work to be done on the wall surfaces, if the awarded contractor damages the wall surface, they will be required to repair all damage.

4. Will all furniture, kitchen equipment and other government items be removed prior to contractor starting work?

• The Government shall be responsible for moving all government items. (The Park will not move the fixed kitchen appliances they will stay in place).

5. Will relocation and storage of these items be the responsibility of the contractor or Government provided?

• The Government shall be responsible for storing all government items.

6. Reference - Seed Project - If removing the ceiling and/or the making changes to the fire sprinkler will result in the need to replace insulation, what is the R-value requirement? Are both batt and blown-in insulation acceptable?

• The R value is 50 and batt or blown in is acceptable.

7. Are the subcontractors to be assumed MATOC task order specific or are these subcontractors identified for the SEED project?

• See FACTOR 3 – CONSTRUCTION TEAM / KEY PERSONNEL AND STAFFING