2. In Section L, Technical Factor 4 – Relevant Experience, it states “Offerors shall identify the following in list form: All Federal, State or Local Government agencies and commercial businesses for whom the offeror has been awarded a contract during the past three (3) years.”
“…..identify no more than 10 contracts applicable to the work of this MATOC.” If we have 10 projects that were awarded in the past 3 years, are we required to provide 10 projects for Factor 4 Experience, which will then also require 10 CPARS/PPQs for Factor 5?
• Yes, Submit Past Performance information for the same projects submitted under Relevant Similar Experience (Technical Factor 4)
2. In Section L, Technical Factor 4 – Relevant Experience, it states “Recent experience is defined as currently on-going, or completed within the past five years of the solicitation close date” and then in the next paragraph it states: “Offerors shall identify the following in list form: All Federal, State or Local Government agencies and commercial businesses for whom the offeror has been awarded a contract during the past three (3) years.” Please clarify if project experience is to be within 5 years or 3 years.
• 3 years
3. Per page 67 of the solicitation, “For each project submitted as past experience/past performance, the offeror shall provide a copy of this questionnaire (standardized past performance questionnaire provided).”
Per page 68 of solicitation “the offeror shall address each of the following aspects of past performance: quality of product/service, documentation quality, work site safety, cost control, management responsiveness, contract management
Does NPS require references and/or reference projects and/or additional narratives of the reference projects in addition to the past performance questionnaires? I believe there is a maximum of 10 reference projects and past performance questionnaires per page 67 of solicitation.
• Submit Past Performance information for the same projects submitted under Relevant Similar Experience (Technical Factor 4)
4. If bid per Amendment CLIN 1, it appears to call for, "ceiling area repairs only not the the removal / demolition of all ceiling types"
• Clin 1 is to remove only the required access points in the ceiling to remove the fire suppression system and repair those access points.
• 2. Clin 2 is an option line item for contractors to provide pricing on the price is to remove all the ceiling all locations and install new ceilings in kind.
5. Per SOW, page 3 of 8, it appears that all gypsum ceilings that require repair (including exposed/painted gypsum, and gypsum with glued acoustic ceiling tiles) are to receive a 1/2" drywall overlay. Is the intent to receive 1/2" new drywall over the majority of drywall ceilings?
• The statement is there to reduce labor hours of repair, If a contractor determined that the 5/8 gypsum board access holes would be easier to repair by cover all ceiling areas with an additional ½ gypsum board to achieve the level 4 finish. that is acceptable.
• The 5/8 fire board shall be replaced before covering with the ½ inch