B08_140P1422R0002_MATOC_RFP_Revised_4May2023_0003.pdf

PDF 234 KB Posted

Attached to
National Park Service, Northern Rockies MABO, Mult
Solicitation number
140P1422R0002
Issued by

View the file

Other files

File Type Posted
B08_140P1422R0002_RFP_Amendment_Letter_6_Q_A_0006.pdf PDF
Sol_140P1422R0002_Amd_0006.pdf PDF
B08_140P1422R0002_RFP_Amendment_Letter_5_Q_A_0005.pdf PDF
Sol_140P1422R0002_Amd_0005.pdf PDF
B08_140P1422R0002_RFP_Amendment_Letter_4_Site_Visit_Sign_In_Form_0004.pdf PDF
Sol_140P1422R0002_Amd_0004.pdf PDF
B08_140P1422R0002_RFP_Amendment_Letter_4_Q_A_0004.pdf PDF
RFP_Amendment_Letter_3_Q_A_0003.pdf PDF
Sol_140P1422R0002_Amd_0003.pdf PDF
RFP_Amendment_Letter_3_Asbestos_Sampling_Report2May2023_0003.pdf PDF
B08_140P1422R0002_Attachment_J10_Seed_TO_RFP_Form_Revised_4May2023_0003.pdf PDF
RFP_Amendment_Letter_3_Attachment_J6_SEED_TO_SOW_Revised_2May2023_0003.pdf PDF
B08_140P1422R0002_Attachment_J10_Seed_TO_RFP_Form_Revised_27Apr2023_0002.pdf PDF
RFP_Amendment_Letter_2_Drawing_YCC_MESS_HALL_0002.pdf PDF
Amendment_Questions_0002.pdf PDF
RFP_Amendment_Letter_2_Attachment_J6_SEED_TO_SOW_Revised_25Apr2023_0002.pdf PDF
B08_140P1422R0002_MATOC_RFP_Section_B_Revised_27Apr2023_0002.pdf PDF
Sol_140P1422R0002_Amd_0002.pdf PDF
RFP_Amendment_Letter_2_Site_visit_Sign_In_Log_0002.pdf PDF
Sol_140P1422R0002_Amd_0001.pdf PDF
B08_140P1422R0002_Attachment__J2_TO_RFP_Form_Sample.docx DOCX document
B08_140P1422R0002_Attachment_J9__SEED_TO_Proposed_Equals_Request.docx DOCX document
Sol_140P1422R0002.pdf PDF
B08_140P1422R0002_Attachment__J1_NPS_Safety_and_Checklist.pdf PDF
B08_140P1422R0002_Attachment__J4_Past_Performance_Questionnaire.docx DOCX document
B08_140P1422R0002_Attachment_J8_Wage_Determination_Park_Co_Bldg_WY20230013_Dated_27Jan2023.pdf PDF
B08_140P1422R0002_Attachment_J7_SEED_TO_Drawings_2021-11-24.pdf PDF
B08_140P1422R0002_Attachment__J3_Will_Not_Compete.docx DOCX document
B08_140P1422R0002_Attachment_J6_SEED_TO_SOW_Revised_30Mar2023.pdf PDF
B08_140P1422R0002_Attachment_J10_Seed_TO_RFP_Form.docx DOCX document
B08_140P1422R0002_Attachment_J11_Dry_Sprinkler_System_Design_Calculations_2021-11-24.pdf PDF
B08_140P1422R0002_Attachment__J5_LmtOnSubconRpt.xlsx XLSX spreadsheet
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation

Document No.

140P1422R0002

Document Title Northern Rockies MABO Construction MATOC

PART I – THE SCHEDULE

SECTION A – SOLICITATION / CONTRACT FORM

Solicitation, Offer, and Award (SF-1442) - pages 1- 2 of this package

As requirements develop, task orders will be competed among the MATOC awardees. This is not a Requirements contract per FAR 16.503; the Government reserves the right to issue additional solicitations and award additional contracts within the locations covered by this solicitation outside of this MATOC. In accordance with the Federal Acquisition Streamlining Act and FAR 16.505(b), the Contracting Officer will provide each awardee a “fair opportunity” to be considered for each order in excess of $2,000, unless one of the conditions outlined MULTIPLE AWARDEES, FAIR OPPORTUNITIES CLAUSE (SPECIAL PROVISION) at FAR 16.505(b) applies.

SECTION B – BID SCHEDULE

MATOC BINDING RATES

DIRECT LABOR RATES-MAXIMUM CEILING RATES PRICED PER YEAR

Burdened: Rates shall be burdened with taxes, insurance, and home office overhead; but shall not include job site overhead or profit.

LABOR

DISCIPLINES

UNIT YEAR 1

RATES

YEAR 2

RATES

YEAR 3

RATES

YEAR 4

RATES

YEAR 5

RATES

Construction Superintendent / Foreman

HR

Construction Project Manager HR

MATOC - INDIRECT COSTS

Overhead, General and Administrative (G&A)

PROFIT TABLE

ROM up to - $150k %

ROM $150k - $250k %

ROM $250k - $500k %

ROM $500k - $1.0M %

ROM >$1.0M %

Yearly Rate 1 will go into effect upon contract award date. The subsequent Yearly Rates 2-5 will go into effect each year on anniversary of contract award for the life of the contract. The contractor shall be responsible to ensure correct pricing is being utilized each year.

Document Title

The following contract line items for the seed task order shall be incorporated as binding rates for identical future work that meets the description for each line below. Reference the Seed Task Order Statement of Work, Attachment J6, Section 10, for a definition of each Contract Line-Item Number (CLIN) below SEED Task Order CLIN 1: The base line funding shall be all work related to the installation of the fire suppression system including the repairs to return to as condition of the ceilings all areas (ceiling area repairs only not the removal / demolition of all ceiling types)

1a: Demo all points of entry within the ceiling to provide access to the current fire suppression system.

This line item consists of all the labor, equipment, and materials necessary to:

Remove and dispose of the required ceiling sections to provide access for the removal of the current fire suppression system components.

Total $ ________________ 1b: Demo current fire suppression system and prepare area for the new suppression system upgrade.

This line item consists of all the labor, equipment, and materials necessary to disconnect, remove and dispose of the current fire suppression system components including the riser.

Total $ ________________

1c: Installation of the new fire suppression system.

This line item consists of all the labor, equipment, and materials necessary to install the new fire suppression as per the attached drawing / design requirements.

Total $ ________________

1d: Suppression System testing.

This line item consists of all the labor, equipment, and materials necessary to soft start and test the new fire suppression system as per the attached drawing/ design requirements.

The testing shall include Yellowstone National Park technical experts and the Park Fire Chief.

Total $ ________________ 1e: Replace/repair all points of entry in the ceiling.

This line item consists of all the labor, equipment, and materials necessary to repair all points of entry in the ceiling.

The cost shall include the replacement of all ceiling tiles updated to a 2’x2’ drop ceiling. The cost shall include updating/replacing all lighting fixtures to LED.

Total $ ________________ 1f: Clean and decontaminate all surfaces.

This line item consists of all the labor, equipment, and materials necessary to clean and decontaminate all surfaces. This shall include a final wipe test to determine cleanliness.

The tests shall be used to monitor the cleanliness of the working surfaces in the area where asbestos was present. The samples shall be collected using micro-vacuuming on PCM cassettes or as wipe samples on all work areas. Independent test results shall be provided to the Government with the final approvals punch list.

Total $ ________________ Seed Task Order CLIN 2: Option line shall be work related to the removal of all Asbestos material within the building this line option is dependent on the availability of funds and will be awarded or declined not to exceed 30 days after

NTP.

Document Title

Test, demo, remove and the dispose of all hazardous materials.

• Test for hazardous materials (all locations of work)

• This line item consists of all the labor, equipment, and supplies necessary to test for all hazardous materials and for the removal and disposal of the above hazardous materials as per State and Federal requirements.

Total $ ________________

Seed Task Order CLIN 2: Option line two shall be related to the removal/demolition of all ceiling components including: ceiling tiles/ grid system, gypsum board and glue down ceiling tiles on gypsum board.

• To access all the required demolition of the fire suppression system the awarded contractor shall remove all the ceiling types where required and replace in kind.

• The determination for award of this option line item shall be determined at the time of award.

Total $ ________________

SECTION A – SOLICITATION / CONTRACT FORM
SECTION B – BID SCHEDULE
SECTION C – SPECIFICATIONS / DRAWINGS
SECTION D – PACKAGING AND MARKING
SECTION E – INSPECTION AND ACCEPTANCE
SECTION F – DELIVERIES OR PERFORMANCE
SECTION G – CONTRACT ADMINISTRATION DATA
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1 PROHIBITION OF ALL TERRAIN VEHICLES (ATV)S – OFFICE SUPPORTING REGIONS 6, 7, & 8
H.2 FIRE DANGER SEASON
H.3 EXTENT OF OBLIGATION
H.4 WORK BY THE GOVERNMENT
H.5 COMPLIANCE WITH STATE AND FEDERAL LAWS AND REQUIREMENTS
H.6 KEY PERSONNEL (WILL BE COMPLETED WITH AWARD)
H.7 UTILITY SERVICES
H.8 GENERIC GENDER TERMINOLOGY
H.9 NON-DISCRIMINATION NOTICE
H.10 EXPENSES RELATED TO OFFERS
H.11 SPECIAL MATOC CONTRACT REQUIREMENTS
PART II – CONTRACT CLAUSES
SECTION I – Contract Clauses
CLAUSES INCORPORATED BY REFERENCE (CLAUSES CONTAING FILL-INS OR BLANK SPACES WILL BE COMPLETED IN THE TASK oRDER SOLICITATION AND INCORPORATED BY FULL TEXT):
CLAUSES INCORPORATED BY FULL TEXT:
PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J – List of Attachments
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K – Representations, Certifications and Other Statements of Offerors
52.204-8 Annual Representations and Certifications (MAR 2023)
SECTION L – Instructions, Conditions and Notices to OFFERORS
52.211-3 Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions.

SECTION M – EVALUATION FACTORS FOR AWARD