140P1422R0002 NR MATOC RFP – Amendment 4 Q&A
Q1.
Per Amendment 3, Item 10, bidders are to submit resumes for the following key staff positions; Senior PM, PM, QCM, and Safety Officer.
Per page 4, "SECTION B – BID SCHEDULE," bidders are to provide hourly pricing for a "Construction Superintendent/Foreman" and a "Construction Project Manager."
For the purpose of the resume section, is it acceptable for the Senior PM to also be considered Construction Project Manager and the Project Manager to be considered Construction Superintendent/Foreman. There appears to be some discrepancy on title of staffing. It would be an assumption that NPS would want to see the resume of an on-site superintendent.
A1.
Per Section L, resumes for the Senior PM, PM, QCM, and Safety Officer must be included in the proposal.
There is no requirement for a resume for a Superintendent. On the Section B – Bid Schedule the pricing provided under the labor disciplines Construction Superintendent / Foreman and Construction Project Manager are the firm fixed fully burdened binding rates that will be used through out the period of performance on all task orders issued against the MATOC IDIQ. The PM whose resume is provided in Section L can be the Construction Superintendent / Foreman. The Senior PM can be the Construction Project Manager. A contractor may have multiple Superintendents but may only have one PM and one Senior PM for the overarching contract.
Q2.
The SOW is a little confusing as to whether or not we are to remove all of the ceilings or just what is necessary to install the new sprinkler system. Please clarify
A2.
Clin 1 is to remove only the required access points in the ceiling to remove the fire suppression system and repair those access points.
2. Clin 2 is an option line item for contractors to provide pricing on the price is to remove all the ceiling all locations and install new ceilings in kind.