B08_140P1422R0002_RFP_Amendment_Letter_4_Q_A_0004.pdf

PDF 96 KB Posted

Attached to
National Park Service, Northern Rockies MABO, Mult
Solicitation number
140P1422R0002
Issued by

View the file

Other files

File Type Posted
B08_140P1422R0002_RFP_Amendment_Letter_6_Q_A_0006.pdf PDF
Sol_140P1422R0002_Amd_0006.pdf PDF
B08_140P1422R0002_RFP_Amendment_Letter_5_Q_A_0005.pdf PDF
Sol_140P1422R0002_Amd_0005.pdf PDF
B08_140P1422R0002_RFP_Amendment_Letter_4_Site_Visit_Sign_In_Form_0004.pdf PDF
Sol_140P1422R0002_Amd_0004.pdf PDF
RFP_Amendment_Letter_3_Q_A_0003.pdf PDF
Sol_140P1422R0002_Amd_0003.pdf PDF
B08_140P1422R0002_MATOC_RFP_Revised_4May2023_0003.pdf PDF
RFP_Amendment_Letter_3_Asbestos_Sampling_Report2May2023_0003.pdf PDF
B08_140P1422R0002_Attachment_J10_Seed_TO_RFP_Form_Revised_4May2023_0003.pdf PDF
RFP_Amendment_Letter_3_Attachment_J6_SEED_TO_SOW_Revised_2May2023_0003.pdf PDF
B08_140P1422R0002_Attachment_J10_Seed_TO_RFP_Form_Revised_27Apr2023_0002.pdf PDF
RFP_Amendment_Letter_2_Drawing_YCC_MESS_HALL_0002.pdf PDF
Amendment_Questions_0002.pdf PDF
RFP_Amendment_Letter_2_Attachment_J6_SEED_TO_SOW_Revised_25Apr2023_0002.pdf PDF
B08_140P1422R0002_MATOC_RFP_Section_B_Revised_27Apr2023_0002.pdf PDF
Sol_140P1422R0002_Amd_0002.pdf PDF
RFP_Amendment_Letter_2_Site_visit_Sign_In_Log_0002.pdf PDF
Sol_140P1422R0002_Amd_0001.pdf PDF
B08_140P1422R0002_Attachment__J2_TO_RFP_Form_Sample.docx DOCX document
B08_140P1422R0002_Attachment_J9__SEED_TO_Proposed_Equals_Request.docx DOCX document
Sol_140P1422R0002.pdf PDF
B08_140P1422R0002_Attachment__J1_NPS_Safety_and_Checklist.pdf PDF
B08_140P1422R0002_Attachment__J4_Past_Performance_Questionnaire.docx DOCX document
B08_140P1422R0002_Attachment_J8_Wage_Determination_Park_Co_Bldg_WY20230013_Dated_27Jan2023.pdf PDF
B08_140P1422R0002_Attachment_J7_SEED_TO_Drawings_2021-11-24.pdf PDF
B08_140P1422R0002_Attachment__J3_Will_Not_Compete.docx DOCX document
B08_140P1422R0002_Attachment_J6_SEED_TO_SOW_Revised_30Mar2023.pdf PDF
B08_140P1422R0002_Attachment_J10_Seed_TO_RFP_Form.docx DOCX document
B08_140P1422R0002_Attachment_J11_Dry_Sprinkler_System_Design_Calculations_2021-11-24.pdf PDF
B08_140P1422R0002_Attachment__J5_LmtOnSubconRpt.xlsx XLSX spreadsheet
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P1422R0002 NR MATOC RFP – Amendment 4 Q&A

Q1.

Per Amendment 3, Item 10, bidders are to submit resumes for the following key staff positions; Senior PM, PM, QCM, and Safety Officer.

Per page 4, "SECTION B – BID SCHEDULE," bidders are to provide hourly pricing for a "Construction Superintendent/Foreman" and a "Construction Project Manager."

For the purpose of the resume section, is it acceptable for the Senior PM to also be considered Construction Project Manager and the Project Manager to be considered Construction Superintendent/Foreman. There appears to be some discrepancy on title of staffing. It would be an assumption that NPS would want to see the resume of an on-site superintendent.

A1.

Per Section L, resumes for the Senior PM, PM, QCM, and Safety Officer must be included in the proposal.

There is no requirement for a resume for a Superintendent. On the Section B – Bid Schedule the pricing provided under the labor disciplines Construction Superintendent / Foreman and Construction Project Manager are the firm fixed fully burdened binding rates that will be used through out the period of performance on all task orders issued against the MATOC IDIQ. The PM whose resume is provided in Section L can be the Construction Superintendent / Foreman. The Senior PM can be the Construction Project Manager. A contractor may have multiple Superintendents but may only have one PM and one Senior PM for the overarching contract.

Q2.

The SOW is a little confusing as to whether or not we are to remove all of the ceilings or just what is necessary to install the new sprinkler system. Please clarify

A2.

Clin 1 is to remove only the required access points in the ceiling to remove the fire suppression system and repair those access points.

2. Clin 2 is an option line item for contractors to provide pricing on the price is to remove all the ceiling all locations and install new ceilings in kind.

File details come from the government source that posted it. Updated .