140L6221R0001 AMD 0003 QUESTIONS AND ANSWERS_0003.docx

DOCX document 16 KB Posted

Attached to
SPLIT ROCK REC SITE PARKING LOT REBUILD
Solicitation number
140L6221R0001
Issued by

About this file

This document contains questions and answers regarding Amendment 0003 to Solicitation Number 140L6221R0001 for the Split Rock Rec Site Parking Lot Rebuild project. The federal agency issuing this opportunity is the Department of the Interior Bureau of Land Management Wyoming Region. The amendment clarifies that the scope of work involves removing approximately 5,880 square yards of existing asphalt, base, and sub-base; reinstalling the sub-base and base; and then placing structural concrete. All specifications and attachments for this project have been posted on beta.sam.gov.

View the file

Other files

File Type Posted
140L6221R0001 AMD 00008 QUESTION AND ANSWERS.docx DOCX document
Sol_140L6221R0001_Amd_0008.pdf PDF
Pre-Bid Split Rock Parking Lot_0007.pdf PDF
140L6221R0001 AMD 0007 Questions and Answers_0007.docx DOCX document
Sol_140L6221R0001_Amd_0007.pdf PDF
140L6221R0001 AMD 0006 QUESTIONS AND ANSWERS_0006.docx DOCX document
Sol_140L6221R0001_Amd_0006.pdf PDF
Sol_140L6221R0001_Amd_0005.pdf PDF
140L6221R0001 AMD 0005 QUESTION AND ANSWER_0005.docx DOCX document
Typ Pavement Cross Section Concrete Cross Section 1_0004.pdf PDF
Sol_140L6221R0001_Amd_0004.pdf PDF
140L6221R0001 AMD 0004 QUESTIONS AND ANSWERS_0004.docx DOCX document
Sol_140L6221R0001_Amd_0003.pdf PDF
UPDATED 01 21 2021 01009 General Information and Requirements_0002.docx DOCX document
Split Rock Ruler_0002.pdf PDF
Sol_140L6221R0001_Amd_0002.pdf PDF
Split Rock_0002.jpg JPG image
140L6221R0001 AMD 0002 QUESTION AND ANSWER_0002.docx DOCX document
140L6221R0001 AMD 0001 QUESTIONS AND ANSWERS_0001.docx DOCX document
Sol_140L6221R0001_Amd_0001.pdf PDF
REVISED 01 19 2021 Bid Schedule Split Rock Parking Lot Rebuild_0001.xlsx XLSX spreadsheet
01009 General Information and Requirements.docx DOCX document
03310 Structural Concrete.docx DOCX document
02722 Aggregate Base Course.docx DOCX document
01458 Testing Laboratory Services.docx DOCX document
02223 Selective Site Demolition.docx DOCX document
Location Map.docx DOCX document
02339 Watering.docx DOCX document
Bid Schedule Split Rock Parking Lot Rebuild.xlsx XLSX spreadsheet
01505 Mobilization.docx DOCX document
Typ Pavement Cross Section.pdf PDF
Typ Pavement Cross Section Existing Asphalt.pdf PDF
Typ Pavement Cross Section Concrete Cross Section.pdf PDF
Sol_140L6221R0001.pdf PDF
01500 Temporary Facilities and Controls.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140L6221R0001 Amendment: 0003

Q1. On one of the questions, it states that we get 34,053 sf off of Google and at 6 inches that would be 630cy of concrete, the bid schedule shows 5880 SY of remove and replace and if so, that is 52,920 sf and at 6 inches that would be 980cy of concrete. That is a big difference.

A1. The Scope of Works states approximately 5,880 SY if existing asphalt, remove existing base and sub-base. Reinstall sub-base, base once compacted than place the structural concrete. In the Bid Schedule it states on Item 2: Removal of Base and Sub-base, Item 4: Reconstruct and stabilize roadway/parking lot. Both numbers are the 5,880 SY of material.

Q2. Do you have or plan to have some plans to upload on BetaSam?

A2. All specifications/attachments have been posted on beta.sam.gov that have been provided for this project.