02223 Selective Site Demolition.docx

DOCX document 24 KB Posted

Attached to
SPLIT ROCK REC SITE PARKING LOT REBUILD
Solicitation number
140L6221R0001
Issued by

About this file

This document outlines specifications for a selective site demolition project. The federal agency soliciting bids is the Bureau of Land Management Wyoming Region for the Split Rock Recreation Site Parking Lot Rebuild project. Work will include removing existing drainage structures, pavements, base and subbase materials, sawing or milling pavement, backfilling and grading the site. Bidders must submit a schedule and traffic control plan, and will be responsible for protecting existing structures and utilities, disposing of debris, and testing compaction of backfilled areas. Payment will be made on a lump sum basis for general work and per square yard for pavement removal and backfill of base and subbase.

View the file

Other files

File Type Posted
140L6221R0001 AMD 00008 QUESTION AND ANSWERS.docx DOCX document
Sol_140L6221R0001_Amd_0008.pdf PDF
Pre-Bid Split Rock Parking Lot_0007.pdf PDF
140L6221R0001 AMD 0007 Questions and Answers_0007.docx DOCX document
Sol_140L6221R0001_Amd_0007.pdf PDF
140L6221R0001 AMD 0006 QUESTIONS AND ANSWERS_0006.docx DOCX document
Sol_140L6221R0001_Amd_0006.pdf PDF
Sol_140L6221R0001_Amd_0005.pdf PDF
140L6221R0001 AMD 0005 QUESTION AND ANSWER_0005.docx DOCX document
Typ Pavement Cross Section Concrete Cross Section 1_0004.pdf PDF
Sol_140L6221R0001_Amd_0004.pdf PDF
140L6221R0001 AMD 0004 QUESTIONS AND ANSWERS_0004.docx DOCX document
Sol_140L6221R0001_Amd_0003.pdf PDF
140L6221R0001 AMD 0003 QUESTIONS AND ANSWERS_0003.docx DOCX document
UPDATED 01 21 2021 01009 General Information and Requirements_0002.docx DOCX document
Split Rock Ruler_0002.pdf PDF
Sol_140L6221R0001_Amd_0002.pdf PDF
Split Rock_0002.jpg JPG image
140L6221R0001 AMD 0002 QUESTION AND ANSWER_0002.docx DOCX document
140L6221R0001 AMD 0001 QUESTIONS AND ANSWERS_0001.docx DOCX document
Sol_140L6221R0001_Amd_0001.pdf PDF
REVISED 01 19 2021 Bid Schedule Split Rock Parking Lot Rebuild_0001.xlsx XLSX spreadsheet
01009 General Information and Requirements.docx DOCX document
03310 Structural Concrete.docx DOCX document
02722 Aggregate Base Course.docx DOCX document
01458 Testing Laboratory Services.docx DOCX document
Location Map.docx DOCX document
02339 Watering.docx DOCX document
Bid Schedule Split Rock Parking Lot Rebuild.xlsx XLSX spreadsheet
01505 Mobilization.docx DOCX document
Typ Pavement Cross Section.pdf PDF
Typ Pavement Cross Section Existing Asphalt.pdf PDF
Typ Pavement Cross Section Concrete Cross Section.pdf PDF
Sol_140L6221R0001.pdf PDF
01500 Temporary Facilities and Controls.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIVISION 2SECTION 02223
SITE CONSTRUCTIONSITE DEMOLITION

PART 1: GENERAL

1.1 SUMMARY

A. Section Includes: The removal and disposal of drainage structures, pavements, base and subbase material, other obstructions, salvage of items, and backfilling cavities left after removal is complete.

1.2 SUBMITTALS

A. General: Submittals shall be according to Section 01009 - General Information and Requirements.

B. Schedule: Submit one (1) copy of a schedule indicating proposed methods and sequence of operations for demolition work prior to commencement of work. Include coordination and details for dust, noise, erosion, sediment and traffic. Provide detailed sequence of removal work to ensure uninterrupted progress of Government's on-site operations.

1.3 PROJECT/SITE CONDITIONS

A. Work Limits and Control Points: Will be established by the Contracting Officer.

B. Traffic Control Plan: [Provide for approval by the Contracting Officer a plan to control and protect public traffic [adjacent to and] within the project according to the MUTCD.]

PART 2: PRODUCTS

(There are no applicable requirements.)

PART 3: EXECUTION

3.1 EXAMINATION

A. Verification of Conditions: Visit the site with the Contracting Officer and verify the extent and location of the demolition work required. Photograph existing damage to structure surfaces, equipment, or to surrounding properties which could be misconstrued as damage resulting from demolition work and give copies to the Contracting Officer prior to starting work.

3.2 PREPARATION:

A. Landscape Preservation: Protect vegetation that is outside the work limits from injury.

B. Protection: Protect existing buildings, facilities or utilities outside the work limits from damage. Damage shall be repaired or replaced at the Contractor's expense. Repair work shall not begin until authorized in writing by the Contracting Officer. Protect the site with temporary erosion and sediment control measures.

C. Traffic Control: Roadways shall not be closed or obstructed without written permission of the Contracting Officer. All operations shall be conducted with minimum interference to public or private roadways according to section 01500 Temporary Facilities and Controls.

3.3 DEMOLITION

A. General: Raze, remove and dispose of pavements, and other obstructions to complete the specifications of the contract.

B. Removal of Pavement: Saw or mill existing pavement as shown on the drawings. Break into pieces or store and either use with new asphalt or dispose of offsite according to section 01009 3.3A General Information and Requirements.

3.4 EXPLOSIVES

A. Requirements: Use of explosives will not be approved.

3.5 BURNING

A. The use of burning at the project site on government controlled lands will not be permitted.

3.6 SALVAGE

A. Requirements: Shall be according to Section 01009 - General Information and Requirements.

3.7 DISPOSAL OF DEBRIS

A. Requirements: Items or debris not designated as salvage for the Government shall become the property of the Contractor. Remove and dispose of such materials off government controlled lands according to Section 01009 - General Information and Requirements.

3.8 BACKFILLING

A. General: Fill cavities caused as a result of demolition.

B. Backfill Placement: Backfill materials shall be spread over the full width of the cross section of the cavity to a maximum loose thickness of 6-inches and shall be compacted as specified below before the next layer is spread. Use any type of compaction equipment except rubbertired or smoothsteelwheel non-vibratory rollers to obtain the required degree of compaction. The inplace materials shall be free of lenses, pockets, streaks, or layers of materials differing substantially in texture or gradation from the surrounding materials.

C. Frozen Material: Embankment shall not be placed when either the material or the surface on which it is to be placed is frozen.

3.9 FIELD QUALITY CONTROL

A. Testing: Furnish necessary equipment, labor, and materials to conduct the testing. Testing shall be conducted in the presence of the Contracting Officer who shall be given 48 hours notice before any test is to be conducted. Make arrangements for a certified independent testing laboratory, according to the requirements of Section 01458 - Testing Laboratory Services, to perform the required testing, recording, and distributing of the results.

B. Moisture Content: During placing and compacting of backfill, the optimum moisture content (± 2 percent) as determined by AASHTO T 217 or AASHTO T 239, unless otherwise approved in writing by the Contracting Officer, shall be maintained by wetting or drying, as required.

C. Compaction: The backfill shall be compacted to a minimum density of 95 percent of the maximum dry density as determined by AASHTO T 99, Method C.

3.10 CLEANUP

A. Site Grading: Rough grade areas affected by demolition and leave level to within 1 percent. As per typical pavement cross section drawing.

PART 4: MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT

A. Units: The work described in this section will be paid for on a lump sum basis. Removal of pavement will be paid for by the square yard.

4.2 BASIS OF PAYMENT

A. Payment: Prices and payment will be made at the contract price, as indicated in the Bid Schedule, and will include full compensation for the work described in this section. Payment will be made under:

Pay Item Description Pay Unit

02223(01)Removal of Bituminous PavementSquare Yard
02223 (02)Backfill of Base & SubbaseSquare Yard

END OF SECTION