02339 Watering.docx
DOCX document 20 KB Posted
- Attached to
- SPLIT ROCK REC SITE PARKING LOT REBUILD
- Solicitation number
- 140L6221R0001
About this file
This document outlines specifications for site construction watering required for a federal contract opportunity for the Split Rock Recreation Site Parking Lot Rebuild project issued by the Bureau of Land Management Wyoming Region. The scope of work includes distributing and applying water for compaction of backfilling, dust control, and construction of roadways and parking areas. Contractors must provide their own water source and any required permits, and the water must be clean and free of contaminants. Equipment such as pumps, piping, tanks, water trucks, and moisture measuring devices are also specified. Payment will be included in prices for other contract line items and this work will not be separately measured.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| DIVISION 2 | SECTION 02339 |
| SITE CONSTRUCTION | WATERING |
| DIVISION 2 | SECTION 02339 |
| SITE CONSTRUCTION | WATERING |
PART 1: GENERAL
1.1 SUMMARY
A. Section Includes: Distributing and applying water required for compaction of backfilling, dust control, roadways, and parking areas.
B. Related Sections
| General Information and Requirements | Section 01009 | ||
| Selective Site Demolition | Section 02223 | ||
| Aggregate Surfacing | Section 02722 |
1.2 PROJECT/SITE CONDITIONS
A. Water Source: Contractor shall furnish the water source for the work. All permits if needed are the responsibility of the Contractor.
PART 2: PRODUCTS
2.1 MATERIALS
A. Water: Shall be clean and free from harmful amounts of oils, acids, alkalis, salts and organic materials. Potable water is acceptable.
2.2 EQUIPMENT
A. Requirements: Provide necessary pumping equipment, piping, tanks, water trucks, and measuring devices. Water trucks shall be equipped with a spray bar of adequate capacity and design to ensure uniform application of water in the amounts designated.
PART 3: EXECUTION
3.1 APPLICATION
A. Compaction: Water shall be applied uniformly to each layer of backfill to obtain the optimum moisture content determined by AASHTO T 217 or T 239. The moisture content shall be ±2% of optimum unless otherwise approved. The amount of water used in compaction shall be sufficient to obtain the percent relative compaction required.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this section will not be measured for payment
4.2 BASIS OF PAYMENT
A. Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.
END OF SECTION