02339 Watering.docx

DOCX document 20 KB Posted

Attached to
SPLIT ROCK REC SITE PARKING LOT REBUILD
Solicitation number
140L6221R0001
Issued by

About this file

This document outlines specifications for site construction watering required for a federal contract opportunity for the Split Rock Recreation Site Parking Lot Rebuild project issued by the Bureau of Land Management Wyoming Region. The scope of work includes distributing and applying water for compaction of backfilling, dust control, and construction of roadways and parking areas. Contractors must provide their own water source and any required permits, and the water must be clean and free of contaminants. Equipment such as pumps, piping, tanks, water trucks, and moisture measuring devices are also specified. Payment will be included in prices for other contract line items and this work will not be separately measured.

View the file

Other files

File Type Posted
140L6221R0001 AMD 00008 QUESTION AND ANSWERS.docx DOCX document
Sol_140L6221R0001_Amd_0008.pdf PDF
Pre-Bid Split Rock Parking Lot_0007.pdf PDF
140L6221R0001 AMD 0007 Questions and Answers_0007.docx DOCX document
Sol_140L6221R0001_Amd_0007.pdf PDF
140L6221R0001 AMD 0006 QUESTIONS AND ANSWERS_0006.docx DOCX document
Sol_140L6221R0001_Amd_0006.pdf PDF
Sol_140L6221R0001_Amd_0005.pdf PDF
140L6221R0001 AMD 0005 QUESTION AND ANSWER_0005.docx DOCX document
Typ Pavement Cross Section Concrete Cross Section 1_0004.pdf PDF
Sol_140L6221R0001_Amd_0004.pdf PDF
140L6221R0001 AMD 0004 QUESTIONS AND ANSWERS_0004.docx DOCX document
Sol_140L6221R0001_Amd_0003.pdf PDF
140L6221R0001 AMD 0003 QUESTIONS AND ANSWERS_0003.docx DOCX document
UPDATED 01 21 2021 01009 General Information and Requirements_0002.docx DOCX document
Split Rock Ruler_0002.pdf PDF
Sol_140L6221R0001_Amd_0002.pdf PDF
Split Rock_0002.jpg JPG image
140L6221R0001 AMD 0002 QUESTION AND ANSWER_0002.docx DOCX document
140L6221R0001 AMD 0001 QUESTIONS AND ANSWERS_0001.docx DOCX document
Sol_140L6221R0001_Amd_0001.pdf PDF
REVISED 01 19 2021 Bid Schedule Split Rock Parking Lot Rebuild_0001.xlsx XLSX spreadsheet
01009 General Information and Requirements.docx DOCX document
03310 Structural Concrete.docx DOCX document
02722 Aggregate Base Course.docx DOCX document
01458 Testing Laboratory Services.docx DOCX document
02223 Selective Site Demolition.docx DOCX document
Location Map.docx DOCX document
Bid Schedule Split Rock Parking Lot Rebuild.xlsx XLSX spreadsheet
01505 Mobilization.docx DOCX document
Typ Pavement Cross Section.pdf PDF
Typ Pavement Cross Section Existing Asphalt.pdf PDF
Typ Pavement Cross Section Concrete Cross Section.pdf PDF
Sol_140L6221R0001.pdf PDF
01500 Temporary Facilities and Controls.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIVISION 2SECTION 02339
SITE CONSTRUCTIONWATERING
DIVISION 2SECTION 02339
SITE CONSTRUCTIONWATERING

PART 1: GENERAL

1.1 SUMMARY

A. Section Includes: Distributing and applying water required for compaction of backfilling, dust control, roadways, and parking areas.

B. Related Sections

General Information and RequirementsSection 01009
Selective Site DemolitionSection 02223
Aggregate SurfacingSection 02722

1.2 PROJECT/SITE CONDITIONS

A. Water Source: Contractor shall furnish the water source for the work. All permits if needed are the responsibility of the Contractor.

PART 2: PRODUCTS

2.1 MATERIALS

A. Water: Shall be clean and free from harmful amounts of oils, acids, alkalis, salts and organic materials. Potable water is acceptable.

2.2 EQUIPMENT

A. Requirements: Provide necessary pumping equipment, piping, tanks, water trucks, and measuring devices. Water trucks shall be equipped with a spray bar of adequate capacity and design to ensure uniform application of water in the amounts designated.

PART 3: EXECUTION

3.1 APPLICATION

A. Compaction: Water shall be applied uniformly to each layer of backfill to obtain the optimum moisture content determined by AASHTO T 217 or T 239. The moisture content shall be ±2% of optimum unless otherwise approved. The amount of water used in compaction shall be sufficient to obtain the percent relative compaction required.

PART 4: MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT

A. Units: The work described in this section will not be measured for payment

4.2 BASIS OF PAYMENT

A. Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.

END OF SECTION