01505 Mobilization.docx
DOCX document 21 KB Posted
- Attached to
- SPLIT ROCK REC SITE PARKING LOT REBUILD
- Solicitation number
- 140L6221R0001
About this file
This document outlines mobilization requirements for a construction project to rebuild a parking lot at Split Rock Recreation Site. The contractor will be responsible for all preparatory work and operations necessary to mobilize personnel, equipment, and supplies to the project site, but no separate payment will be made for moves between sites. Mobilization will be paid as a lump sum after award of the contract by the Bureau of Land Management Wyoming Region for the Split Rock Rec Site Parking Lot Rebuild project solicited under number 140L6221R0001. The contractor's bid should include consideration for any inter-site moves in prices for other contract items.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| DIVISION 2 | SECTION 01505 |
| SITE CONSTRUCTION | MOBILIZATION/DEMOBILIZATION |
PART 1: GENERAL
1.1 SUMMARY
A. Section Includes: Preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies and incidentals to the project site; and for other work and operations which must be performed or costs incurred prior to beginning work on the various items on the project site. This specification does not include moves between project sites.
PART 2: PRODUCTS
(There are no applicable requirements.)
PART 3: EXECUTION
(There are no applicable requirements.)
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT:
A. Units: The work described in this section will not be measured for payment.
4.2.1 BASIS OF PAYMENT:
A. Payment: No direct payment for moves between project sites will be made. The Contractor shall include consideration for moves between project sites in the bid price for other items of the Contract. Prices and payment will be full compensation for the work described in this section. Payment will be made under:
Pay Item Pay Unit
01505 (01) Lump Sum
END OF SECTION
WFO BLM Split Rock Parking Lot Rebuild Project 01505 -
MOBILIZATION
11/01 Project Name (ftr B)