140L6221R0001 AMD 0002 QUESTION AND ANSWER_0002.docx
DOCX document 16 KB Posted
- Attached to
- SPLIT ROCK REC SITE PARKING LOT REBUILD
- Solicitation number
- 140L6221R0001
About this file
This document contains questions and answers regarding Amendment 0002 to Solicitation Number 140L6221R0001 for the Split Rock Rec Site Parking Lot Rebuild project. The Bureau of Land Management Wyoming Region is seeking to remove existing asphalt and replace it with six inches of reinforced structural concrete across 34,053 square feet to rebuild the parking lot, requiring approximately 630 cubic yards of concrete. The asphalt will be fully removed rather than replaced. Reinforcements and a concrete cross section design are specified.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140L6221R0001 Amendment: 0002
Q1. It appears from the cross-section sheets that the parking lot is going to be paved. I couldn't find anywhere in the solicitation documents where the concrete is to be installed on this project.
The 630 CY amount is still a huge amount. I assume you are installing curb and gutter around the parking lot. Measuring from Google earth, that is in the neighborhood of 600 linear feet.
See attached picture. The curb and gutter equates to 0.0556 CY/linear foot. So, if you do 600 feet long that would only be about 33 CY.
Where is the concrete going on this project? Are you putting sidewalk too or something? ( 600 LF of sidewalk would be another 37 CY of concrete)
A1. There is not going to be any curb and gutter on this parking lot. The asphalt is being removed and building up the subbase, base and placing concrete six inches thick as per section 1009 Part 1 General last sentence. I also have in the contract section 3310 Structural Concrete with reinforcements. The area I get in google earth is 34,053 square feet as shown in the image from google earth. Take this times the .5 feet in depth of the concrete gives 630.6 cy.
We are not replacing any asphalt. The asphalt is being pulled and replaced with concrete. Please see Typ Pavement Cross Section Concrete Cross Section Drawing.