A04_UPDATED_BID_SHEET_COMANCHE_OXBOW_FENCING_v_08_28_2026_0002.pdf
PDF 146 KB Posted
- Attached to
- BLM-NM RFO COMANCHE OXBOW FENCING
- Solicitation number
- 140L1726R0009
About this file
This is a Bid Schedule for a Request for Offer (RFO) issued by the Bureau of Land Management, New Mexico (BLM-NM) for the Comanche Oxbow Fencing project. The schedule presents nine line items with estimated quantities for fencing materials and installation services to be completed within a 90-day period of performance. The primary deliverable is 6,380 linear feet of four-strand barbed wire fence. Supporting items include eight angle iron corner panels, nine angle iron end panels, one angle iron stress panel, three four-wire barbed wire gates, and five single angle metal posts. Additionally, one mobilization/demobilization (Mob/Demob) lump sum item is included to cover project setup and closeout activities. Fence removal is listed as a line item with zero quantity.
Bidders must complete the schedule by providing unit prices for each line item, with totals calculated for each item and a grand total reflecting the complete project cost. The schedule emphasizes an "All or Nothing" award approach, indicated by the highlighted Grand Total row, meaning the contractor must provide pricing for all line items. All quantities are identified as estimates, indicating potential variations in actual quantities required during performance. Contractors should note the 90-day performance window when developing their bids and pricing strategies.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLM-NM RFO COMANCHE OXBOW FENCING
Bid Schedule Pay Item Description Quantity* Unit Unit Price Total
1 Fence Removal 0 LF 2 Barbed Wire Fence (4 Strand) 6380 LF 3 Angle Iron Corner Panel (CP) 8 EA 4 Angle Iron Corner Panel 3 brace (3BCP) 0 EA 5 Angle Iron End Panel (EP) 9 EA 6 Angle Iron Stress Panel (SP) 1 EA 7 Barbed Wire Gate - 4 Wire (WG) 3 EA 8 Single Angle Metal Post (SMP) 5 EA
9 Mob/Demob 1 LS
TOTAL Total
Grand Total (All or Nothing) *All quantities are estimates ** 90-day Period of Performance