A04_UPDATED_BID_SHEET_COMANCHE_OXBOW_FENCING_v_08_27_2026_0001.pdf
PDF 181 KB Posted
- Attached to
- BLM-NM RFO COMANCHE OXBOW FENCING
- Solicitation number
- 140L1726R0009
About this file
This is a Bid Schedule for a Request for Offer (RFO) issued by the Bureau of Land Management, New Mexico (BLM-NM) for the Comanche Oxbow Fencing project. The schedule outlines eleven line items for fencing construction and related services with estimated quantities. The primary scope includes installation of 6,380 linear feet of 4-strand barbed wire fence, eight angle iron corner panels, nine angle iron end panels, one angle iron stress panel, three barbed wire gates (4-wire), and five single angle metal posts. Secondary items include fence removal (quantity 0), angle iron corner panels with 3-brace configuration (quantity 0), and lump sum charges for mobilization/demobilization, bonding, and taxes.
Bidders are required to submit unit prices for each line item, with totals calculated by multiplying quantity by unit price. The contract specifies a 90-day period of performance and indicates an "All or Nothing" award approach for the grand total. All quantities are noted as estimates. The bid schedule provides columns for unit pricing and total cost calculations but does not specify response deadlines, award dates, or contract value thresholds within this document.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLM-NM RFO COMANCHE OXBOW FENCING
Bid Schedule Pay Item Description Quantity* Unit Unit Price Total
1 Fence Removal 0 LF 2 Barbed Wire Fence (4 Strand) 6380 LF 3 Angle Iron Corner Panel (CP) 8 EA 4 Angle Iron Corner Panel 3 brace (3BCP) 0 EA 5 Angle Iron End Panel (EP) 9 EA 6 Angle Iron Stress Panel (SP) 1 EA 7 Barbed Wire Gate - 4 Wire (WG) 3 EA 8 Single Angle Metal Post (SMP) 5 EA
9 Mob/Demob 1 LS 10 Bonding 1 LS 11 Taxes 1 LS
TOTAL Total
Grand Total (All or Nothing) *All quantities are estimates ** 90-day Period of Performance
File details come from the government source that posted it. Updated .