Senior Center Building Roof Repairs Permit Set

This is a specification and permit document for the City of Tallahassee's Senior Center Building Roof Repairs project located at 1400 N Monroe Street, Tallahassee, Florida 32303. The project scope includes cleaning and patching the existing mineral surface low slope roofing system, removing parapet wall base flashing, and installing a fully adhered high solar reflectance index (SRI) 80 mil polyvinyl chloride (PVC) fleece-backed cap sheet roofing with a 60 mil PVC flashing membrane system. Additional work encompasses installing new prefinished aluminum parapet coping with sealed joint caps over existing stone coping, PVC clad scuppers, and at the annex, replacement of damaged skylights with new units matching existing installations. The specification document was prepared by MLD Architects, LLC and is dated August 12, 2025. The contractor must coordinate with the roofing system manufacturer's technical personnel for installation oversight and warranty compliance. The permit set includes detailed technical specifications for roofing installation methods, material requirements, quality control procedures, and closeout requirements.

The roofing system must provide a 20-year non-defects in labor (NDL) manufacturer warranty and a 3-year installer warranty from the date of Substantial Completion. Material specifications require 60 mil minimum thickness PVC sheet (ASTM D 4434/D 4434M, Type III, fabric reinforced with KEE and fleece-backed), with a solar reflectance index of not less than 68 and Energy Star certification. The roofing system must comply with FM Global listings for Class 1A-90 fire/windstorm classification and achieve Class A exterior fire-test exposure ratings. Auxiliary materials include SBS modified bitumen base sheets, bonding adhesives, metal termination bars, and flashing accessories as specified by the roofing manufacturer. The scope includes additive/deductive unit costs for wet isocyanurate and coverboard replacement and wet lightweight insulating concrete replacement, with baseline quantities of 150 SF and 60 SF respectively included in the base bid. The project requires compliance with the Florida Building Code (Eighth Edition 2023) and adherence to ASTM standards, NRCA guidelines, and manufacturer installation instructions throughout all construction phases.

View the file

Other files

File Type Posted
7-Form 5. Responsible Vendor Review Form3.2020.pdf PDF
6-Form 4. Representations and Certifications.pdf PDF
18-Attachment E - Senior Center Roof Plans - A03-A100.pdf PDF
2-Contract Between the City of Tallahassee and Company Sample .docx DOCX document
10-Form 8. Vendor References.pdf PDF
13-Attachment C - Contract Between The City of Tallahassee (City) and Company Name (Contractor) Sample (8).pdf PDF
15-Attachment E - Keever Mckee Roof Access - Senior Center Attic Access Structural.pdf PDF
21-Attachment E - Senior Center Roof Plans - A06-A700.pdf PDF
16-Attachment E - Senior Center Roof Plans - A01-G100.pdf PDF
1-FINAL (IFB) - Senior Center Roof Replacement KLM 1.6.2026.pdf PDF
4-Form 2. Non Collusion Affidavit of Respondent.pdf PDF
19-Attachment E - Senior Center Roof Plans - A04-A500.pdf PDF
20-Attachment E - Senior Center Roof Plans - A05-A501.pdf PDF
8-Form 6. Vendor Conflict of Interest Form.pdf PDF
17-Attachment E - Senior Center Roof Plans - A02-A000.pdf PDF
22-Attachment F - Senior Center Roof Bid Price Schedule (2).xlsx XLSX spreadsheet
11-Attachment A - Federal Provision and Labor Standards Clause (8).pdf PDF
9-Form 7. Affidavit HumanTrafficking CAO Final.docx DOCX document
3-Form 1. Certification of a Drug Free Workplace.pdf PDF
12-Attachment B - Wage Determination FL20260233 -1-2-2026.pdf PDF
5-Form 3. CONTRACTOR PRICE SCHEDULE .docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

211 JOHN KNOX ROAD, SUITE 105 AR96289 PH: (850) 385 9200 FAX: (850) 422 3140

TALLAHASSEE, FLORIDA 32303 www.mldarchitects.com Email: mld@mldarchitects.com

SENIOR CENTER BUILDING ROOF

REPAIRS

CITY OF TALLAHASSEE

TALLAHASSEE, FLORIDA

PERMIT SET

AUGUST 12, 2025

INDEX 1

SENIOR CENTER BUILDING ROOF REPAIRS

CITY OF TALLAHASSEE

MLD PROJECT. NO. 171824

INDEX – NONTECHNICAL AND TECHNICAL SPECIFICATIONS

DIVISION 1 - GENERAL REQUIREMENTS

SECTION 01 11 00 - SUMMARY OF THE WORK

SECTION 01 33 00 - SUBMITTAL PROCEDURES

SECTION 01 73 29 - CUTTING AND PATCHING

SECTION 01 77 00 - CLOSEOUT PROCEDURES

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

SECTION 07 54 19 - POLYVINYL-CHLORIDE (PVC) ROOFING

SECTION 07 60 00 - FLASHING AND SHEETMETAL

SECTION 07 70 00 - ROOF SPECIALTIES AND ACCESSORIES

SECTION 07 92 00 - JOINT SEALANTS

DIVISION 9 - FINISHES

SECTION 09 90 00 - PAINTING AND COATING

END OF INDEX

SUMMARY OF THE WORK 01 11 00 - 1

SECTION 01 11 00 - SUMMARY OF THE WORK

PART 1 - GENERAL

1.1 RELATED DOCUMENTS:

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification sections, apply to work of this section.

1.2 PROJECT/WORK IDENTIFICATION:

A. General: Project name is Senior Center Building Roof Repairs, Tallahassee Florida as shown on the Contract Documents prepared by MLD Architects, LLC. 211 John Knox Road, Suite 105, Tallahassee, Florida, 32303 (1-850-385-9200).

B. Contract Documents: Indicate the work of the Contract and related requirements and conditions that have an impact on the project.

C. Summary of References: Work of the Contract can be summarized by references to the Contract, General Conditions, Supplementary Conditions, Specification Sections, Drawings, addenda and modifications to the contract documents issued subsequent to the initial printing of this project manual and including but not necessarily limited to printed material referenced by any of these. It is recognized that work of the contract is also unavoidably affected or influenced by governing regulations, natural phenomenon including weather conditions and other forces outside the contract documents.

D. Abbreviated Written Summary: Briefly and without force and effect upon the contract documents, the work of the Contract can be summarized as follows:

Work to include: cleaning and patching the existing mineral surface low slope roofing system, removing the parapet wall base flashing, fully adhering a high solar reflectance index (SRI), 80 mil polyvinyl chloride (PVC) fleece backed cap sheet roofing and 60 mil PVC flashing membrane system. Comply with the current Florida building code (FBC) and the roofing manufacturer's recommendations to provide a roofing manufacturer's 20-year NDL system warranty. Also include installing new prefinished aluminum parapet coping with sealed joint caps over the existing stone coping cap. Installing new PVC clad scuppers. At annex only replace existing damaged skylight with new to match.

Additive / Deductive Unit Costs:

The following unit cost are included in the scope of work:

Wet isocyanurate and coverboard replacement (150 SF included in Base Bid) $___/SF Wet lightweight insulating concrete replacement (60 SF included in Base Bid) $___/SF

1.3 CONTRACTOR USE OF PREMISES:

SUMMARY OF THE WORK 01 11 00 - 2

A. General: The Contractor shall limit his use of the premises to the work indicated, to allow for Owner occupancy and operations of adjacent property.

B. Use of the Site: Confine operations at the site to the areas permitted under the Contract. Portions of the site beyond areas on which work is indicated are not to be disturbed. Conform to site rules and regulations affecting the work while engaged in project construction.

1. Keep existing driveways and entrances serving the premises clear and available to the Owner and his employees, at all times. Do not use these areas for parking or storage of materials.

2. Do not unreasonably encumber the site with materials or equipment. Confine stockpiling of materials and location of storage sheds to the areas agreed upon. If additional storage is necessary, obtain and pay for such storage off site.

1.4 OWNER OCCUPANCY:

A. Full Owner Occupancy: The Owner will occupy the facilities, on the site. The Contractor is to cooperate fully with the Owner or his representative during construction operations to minimize conflicts, maintain safe conditions and to facilitate Owner usage. Perform the work so as not to interfere with the Owner's operations.

1.5 ALTERATIONS AND COORDINATION:

A. General: The work of this Contract includes coordination of the entire work of the project, including preparation of general coordination drawings, diagrams and schedules, and control of site utilization, from beginning of construction activity through project close-out and warranty periods.

B. Alterations: Where applicable, requirements of the contract documents apply to alteration work in the same manner as to new construction.

C. All work shall comply with the Florida Building Code Eighth Edition 2023

1.6 MISCELLANEOUS PROVISIONS:

A. Electrical Requirements of General Work:

1. Plumbing, sewer and water tap fees shall be paid by the Contractor.

2. Electrical Requirements: Except as otherwise indicated, comply with applicable provisions of 2020 National Electric Code for electrical components of general work. Provide Underwriters Laboratories listed and labeled products where applicable.

a. Unless otherwise indicated electrical components for general work shall comply with the items and work listed in Specification Division 26 and other areas of the Specifications.

SUMMARY OF THE WORK 01 11 00 - 3

B. Performance Requirements for Completed Work:

1. General: The Contract Documents indicated the intended occupancy and utilization of the building and its individual systems and facilities. Compliance with governing regulations is intended and required for the work and for the Owner's occupancy and utilization.

END OF SECTION 01 11 00

SUBMITTAL PROCEDURES 01 33 00 - 1

SECTION 01 33 00 – SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Supplementary

Conditions and other Division-1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section specifies administrative and procedural requirements for submittals required for performance of the Work, including;

1. Contractor's construction schedule.

2. Submittal schedule.

3. Daily construction reports and drawings.

4. Shop Drawings.

5. Product Data.

6. Samples.

B. Administrative Submittals: Refer to other Division-1 Sections and other Contract

Documents for requirements for administrative submittals. Such submittals include, but are not limited to:

1. Special prequalification requirements.

2. Applications for payment.

3. Performance and payment bonds.

4. Insurance certificates.

5. List of Subcontractors.

C. Inspection and test reports are included in Section "Quality Control Services."

1.3 SUBMITTAL PROCEDURES

A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. Transmit each submittal sufficiently in advance of performance of related construction activities to avoid delay.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals and related activities that require sequential activity.

2. Coordinate transmittal of different types of submittals for related elements of the Work so processing will not be delayed by the need to review submittals concurrently for coordination.

3. Processing: Allow sufficient review time so that installation will not be delayed as a result of the time required to process submittals, including time for resubmittals.

B. Submittal Preparation: Place a permanent label or title block on each submittal for identification. Indicate the name of the entity that prepared each submittal on the label or title block.

SUBMITTAL PROCEDURES 01 33 00 - 2

1. Project name, and building reference.

2. Date.

3. Name and address of Architect.

4. Name and address of Contractor.

5. Name and address of subcontractor.

6. Name and address of supplier.

7. Name of manufacturer.

8. Number and title of appropriate Specification Section.

9. Drawing number and detail references, as appropriate.

C. Submittal Transmittal: Package each submittal appropriately for transmittal and handling.

Transmit each submittal from Contractor to Architect using a transmittal form.

Submittals received from sources other than the Contractor will be returned without action.

1. On the transmittal Record relevant information and requests for data. On the form, or separate sheet, record deviations from Contract Document requirements, including minor variations and limitations. Include Contractor's certification that information complies with Contract Document requirements.

1.4 CONTRACTOR'S CONSTRUCTION SCHEDULE

A. Bar-Chart Schedule: Prepare a fully developed, horizontal bar- chart type Contractor's construction schedule. Submit within 30 days of the date established for "Commencement of the Work".

1. Provide a separate time bar for each significant construction activity. Provide a continuous vertical line to identify the first working day of each week. Use the same breakdown of units of the Work as indicated in the "Schedule of Values".

2. Within each time bar indicate estimated completion percentage in 10 percent increments. As Work progresses, place a contrasting mark in each bar to indicate Actual Completion.

3. Prepare the schedule on a sheet, or series of sheets, of stable transparency, or other reproducible media, of sufficient width to show data for the entire construction period.

4. Secure time commitments for performing critical elements of the Work from parties involved. Coordinate each element on the schedule with other construction activities; include minor elements involved in the sequence of the Work. Show each activity in proper sequence. Indicate graphically sequences necessary for completion of related portions of the Work.

5. Coordinate the Contractor's construction schedule with the schedule of values, list of subcontracts, submittal schedule, progress reports, payment requests and other schedules.

6. Indicate completion in advance of the date established for Substantial Completion. Indicate Substantial Completion on the schedule to allow time for the Architect's procedures necessary for certification of Substantial Completion.

B. Work Stages: Indicate important stages of construction for each major portion of the

SUBMITTAL PROCEDURES 01 33 00 - 3

Work, including testing and installation.

C. Area Separations: Provide a separate time bar to identify each major construction area for each major portion of the Work. Indicate where each element in an area must be sequenced or integrated with other activities.

D. Cost Correlation: At the head of the schedule, provide a two-item cost correlation line, indicating "precalculated" and "actual" costs. On the line show dollar-volume of Work performed as of the dates used for preparation of payment requests.

E. Distribution: Following response to the initial submittal, print and distribute copies to the

Architect, Owner, subcontractors, and other parties required to comply with scheduled dates. Post copies in the Project meeting room and temporary field office.

1. When revisions are made, distribute to the same parties and post in the same locations. Delete parties from distribution when they have completed their assigned portion of the Work and are no longer involved in construction activities.

F. Schedule Updating: Revise the schedule after each meeting or activity, where revisions have been recognized or made. Issue the updated schedule concurrently with report of each meeting.

1.5 SUBMITTAL SCHEDULE

A. After development and acceptance of the Contractor's construction schedule, prepare a complete schedule of submittals. Submit the schedule within 10 days of the date required for establishment of the Contractor's construction schedule.

1.6 DAILY CONSTRUCTION REPORTS

A. Prepare a daily construction report, recording the following information concerning events at the site; and submit duplicate copies to the Architect at weekly intervals:

1. Work completed this date

2. Area of work

3. Products used, number of gallons, square feet covered, coverage rate, etc.

4. Approximate count of personnel at the site.

5. High and low temperatures, humidity, general weather conditions.

6. Accidents and unusual events.

7. Meetings and significant decisions.

8. Stoppages, delays, shortages, losses.

9. Emergency procedures.

10. Orders and requests of governing/inspecting authorities.

11. Change Orders received, implemented.

12. Field tests and inspections. Meter readings and similar recordings.

13. Partial Completions.

14. Substantial Completions authorized.

SUBMITTAL PROCEDURES 01 33 00 - 4

1.7 PRODUCT DATA

A. Collect Product Data into a single submittal for each element of construction or system.

Product Data includes printed information such as manufacturer's installation instructions, catalog cuts, standard color charts, and performance curves.

1. Mark each copy to show applicable choices and options. Where printed Product Data includes information on several products, some of which are not required, mark copies to indicate the applicable information. Include the following information:

a. Manufacturer's printed recommendations.

b. Compliance with recognized trade association standards.

c. Compliance with recognized testing agency standards.

d. Application of testing agency labels and seals.

e. Notation of dimensions verified by field measurement.

f. Notation of coordination requirements.

2. Do not submit Product Data until compliance with requirements of the Contract

Documents has been confirmed.

3. Preliminary Submittal: Submit a preliminary single-copy of Product Data where selection of options is required.

4. Submittals: Submit a minimum of three (3) copies of each required submittal.

The Architect will retain two and will return the other marked with action taken and corrections or modifications required. If digital (pdf) files are provided, a minimum of one (1) hard copy is required.

a. Unless noncompliance with Contract Document provisions is observed, the submittal may serve as the final submittal.

5. Distribution: Furnish copies of final submittal to installers, subcontractors, suppliers, manufacturers, fabricators, and others required for performance of construction activities. Show distribution on transmittal forms.

6. Do not proceed with installation until an applicable copy of Product Data applicable is in the installer's possession.

7. Do not permit use of unmarked copies of Product Data in connection with construction.

B. As required by Florida Statute 553.842 and the Florida Administrative Code 9B-72, the

Contractor is required to provide the information and the product approval number(s) on building components listed on the attached PRODUCT APPROVAL SPECIFICATION SHEET prior to the start of work. Should you not know the product approval number of any of the listed products applicable to this project, contact your local product supplier or find the approved product number at www.floridabuilding.org.

1.8 SAMPLES

A. Submit full-size, fully fabricated Samples cured and finished as specified and physically identical with the material or product proposed. Samples include partial sections of materials, color range sets, and swatches showing color, texture and pattern.

1. Mount, display, or package Samples in the manner specified to facilitate review of qualities indicated. Include the following:

a. Generic description of the Sample.

SUBMITTAL PROCEDURES 01 33 00 - 5

b. Sample source.

c. Product name or name of manufacturer.

d. Compliance with recognized standards.

e. Availability and delivery time.

2. Submit Samples for review of kind, color, pattern, and texture, for a final check of these characteristics with other elements, and for a comparison of these characteristics between the final submittal and the actual component as delivered and installed.

3. Where variation in color, pattern, texture or other characteristics are inherent in the material or product represented, submit multiple units (not less than 3), that show approximate limits of the variations.

B. Submittals: Submit electronic sets; one will be returned marked with the action taken.

1. Maintain sets of Samples, as returned, at the Project site, for quality comparisons throughout the course of construction.

2. Unless noncompliance with Contract Document provisions is observed, the submittal may serve as the final submittal.

3. Sample sets may be used to obtain final acceptance of the construction associated with each set.

C. Field Samples specified in individual Sections are special types of Samples. Field Samples are full-size examples erected on site to illustrate finishes, coatings, or finish materials and to establish the standard by which the Work will be judged.

1. Comply with submittal requirements to the fullest extent possible. Process transmittal forms to provide a record of activity.

1.9 PROJECT MOCKUPS

A. Mockups: Build mockups to demonstrate aesthetic effects and set quality standards for materials and execution and for fabrication and installation. Prepare mockups so they are inconspicuous or reversible.

1. Locate mockups where directed by Architect in locations that enable viewing under same conditions as the completed Work.

2. Provide mockups as noted, but not limited to, materials and workmanship noted in specification sections.

3. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Architect specifically approves such deviations in writing.

4. Approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.

1.9 ARCHITECT'S ACTION

A. Except for submittals for record, information or similar purposes, where action and return is required or requested, the Architect will review each submittal, mark to indicate action taken, and return promptly.

SUBMITTAL PROCEDURES 01 33 00 - 6

1. Compliance with specified characteristics is the Contractor's responsibility

B. Action Stamp: The Architect will stamp each submittal with a uniform, self-explanatory action stamp.

PART 2 - PRODUCTS (Not Applicable).

PART 3 - EXECUTION (Not Applicable).

END OF SECTION 01 33 00

CUTTING AND PATCHING 01 73 29 - 1

SECTION 01 73 29 - CUTTING AND PATCHING

RELATED DOCUMENTS:

Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification sections, apply to work of this section.

DESCRIPTION OF REQUIREMENTS:

Definition: "Cutting and patching" includes cutting into existing construction to provide for the installation or performance of other work and subsequent fitting and patching required to restore surfaces to their original condition.

"Cutting and patching" is performed for coordination of the work, to uncover work for access or inspection, to obtain samples for testing, to permit alterations to be performed or for other similar purposes.

Cutting and patching performed during the manufacture of products, or during the initial fabrication, erection or installation processes is not considered to be "cutting and patching" under this definition. Drilling of holes to install fasteners and similar operations are also not considered to be "cutting and patching".

Refer to other sections of these specifications for specific cutting and patching requirements and limitations application to individual units of work.

Unless otherwise specified requirements of this section apply to mechanical and electrical work.

Refer to Division-23 and Division-26 sections for additional requirements and limitations on cutting and patching of mechanical and electrical work.

QUALITY ASSURANCE:

Requirements for Structural Work: Do not cut and patch structural work in a manner that would result in a reduction of load-carrying capacity or of load-deflection ratio.

Operational and Safety Limitations: Do not cut and patch operational elements or safety related components in a manner that would result in a reduction of their capacity to perform in the manner intended, including energy performance, or that would result in increased maintenance, or decreased operational life or decreased safety.

Visual Requirements: Do not cut and patch work exposed on the building's exterior or in its occupied spaces, in a manner that would, in the Architect/Engineer's opinion, result in lessening the building's aesthetic qualities. Do not cut and patch work in a manner that would result in substantial visual evidence of cut and patch work. Remove and replace work judged by the Architect/ Engineer to be cut and patched in a visually unsatisfactory manner.

CUTTING AND PATCHING 01 73 29 - 2

PART 2 - PRODUCTS

MATERIALS:

General: Except as otherwise indicated, or as directed by the Architect/Engineer, use materials for cutting and patching that are identical to existing materials. If identical materials are not available, or cannot be used, use materials that match existing adjacent surfaces to the fullest extent possible with regard to visual effect. Use materials for cutting and patching that will result in equal-or-better performance characteristics.

PART 3 - EXECUTION

INSPECTION:

Before cutting, examine the surfaces to be cut and patched and the conditions under which the work is to be performed. If unsafe or otherwise unsatisfactory conditions are encountered, take corrective action before proceeding with the work.

PREPARATION:

Temporary Support: To prevent failure provide temporary support of work to be cut.

Protection: Protect other work during cutting and patching to prevent damage. Provide protection from adverse weather conditions for that part of the project that may be exposed during cutting and patching operations.

Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.

Take precautions not to cut existing pipe, conduit or duct serving the building but scheduled to be relocated until provisions have been made to bypass them.

PERFORMANCE:

General: Employ skilled workmen to perform cutting and patching work. Except as otherwise indicated or as approved by the Architect/Engineer, proceed with cutting and patching at the earliest feasible time and complete work without delay.

Cutting: Cut the work using methods that are least likely to damage work to be retained or adjoining work.

Where possible review proposed procedures with the original installer; comply with original installer's recommendations.

In general, where cutting is required use hand or small power tools designed for sawing or grinding, not hammering and chopping. Cut through concrete and masonry using a cutting machine such as a carborundum saw or core drill to insure a neat hole. Cut holes and slots neatly to size required with minimum disturbance of adjacent work. To avoid marring existing finished surfaces, cut or drill from the exposed or finished side into concealed surfaces.

CUTTING AND PATCHING 01 73 29 - 3

Temporarily cover openings when not in use.

Comply with requirements of applicable sections of Division 2 where cutting and patching requires excavating and backfilling.

By-pass utility services such as pipe and conduit, before cutting, where such utility services are shown or required to be removed, relocated or abandoned. Cut-off conduit and pipe in walls or partitions to be removed. After by-pass and cutting, cap, valve or plug and seal tight remaining portion of pipe and conduit to prevent entrance of moisture or other foreign matter.

Patching: Patch with seams which are durable and as invisible as possible. Comply with specified tolerances for the work.

Where feasible, inspect and test patched areas to demonstrate integrity of work.

Restore exposed finishes of patched areas and where necessary extend finish restoration into retained adjoining work in a manner which will eliminate evidence of patching and refinishing.

Where removal of walls or partitions extends one finished area into another finished area, patch and repair floor and wall surfaces in the new space to provide an even surface of uniform color and appearance. If necessary to achieve uniform color and appearance, remove existing floor and wall coverings and replace with new materials.

Where patch occurs in a smooth painted surface, extend final paint coat over entire unbroken surface containing patch, after patched area has received prime and base coat.

Patch, repair or rehang existing ceilings as necessary to provide an even plane surface of uniform appearance.

CLEANING:

Thoroughly clean areas and spaces where work is performed or used as access to work. Remove completely point, mortar, oils, putty and items of similar nature. Thoroughly clean piping, conduit and similar features before painting or other finishing is applied. Restore damaged pipe covering to its original condition.

END OF SECTION 01 73 29

CLOSEOUT PROCEDURES 01 77 00 - 1

SECTION 01 77 00 - CLOSEOUT PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following:

1. Inspection procedures.

2. Warranties.

3. Final cleaning.

B. Related Sections include the following:

1. Division 1 Section "Payment Procedures" for requirements for Applications for Payment for Substantial and Final Completion.

2. Division 1 Section "Photographic Documentation" for submitting Final Completion construction photographs and negatives.

3. Division 1 Section "Execution Requirements" for progress cleaning of Project site.

4. Divisions 2 through 16 Sections for specific closeout and special cleaning requirements for the Work in those Sections.

1.3 SUBSTANTIAL COMPLETION

A. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.

1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.

2. Advise Owner of pending insurance changeover requirements.

3. Submit specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.

4. Obtain and submit releases permitting Owner unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.

5. Prepare and submit Project Record Documents, operation and maintenance manuals, Final Completion construction photographs damage or settlement surveys, property surveys, and similar final record information.

CLOSEOUT PROCEDURES 01 77 00 - 2

6. Deliver tools, spare parts, extra materials, and similar items to location designated by Owner. Label with manufacturer's name and model number where applicable.

7. personnel of changeover in security provisions.

8. Complete startup testing of systems.

9. Submit test/adjust/balance records.

10. Terminate and remove temporary facilities from Project site, along with mockups, construction tools, and similar elements.

11. Advise Owner of changeover in heat and other utilities.

12. Submit changeover information related to Owner's occupancy, use, operation, and maintenance.

13. Complete final cleaning requirements, including touchup painting.

14. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.

B. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Architect, that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

2. Results of completed inspection will form the basis of requirements for Final Completion.

1.4 FINAL COMPLETION

A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:

1. Submit a final Application for Payment according to Division 1 Section "Payment Procedures."

2. Submit certified copy of Architect's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Architect. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.

3. Submit evidence of final, continuing insurance coverage complying with insurance requirements.

4. Submit pest-control final inspection report and warranty.

5. Instruct Owner's personnel in operation, adjustment, and maintenance of products, equipment, and systems.

B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements.

Architect will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

CLOSEOUT PROCEDURES 01 77 00 - 3

1.5 LIST OF INCOMPLETE ITEMS (PUNCH LIST)

A. Preparation: Submit three copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.

1. Organize list of spaces in sequential order

2. Organize items applying to each space by major element, including categories for ceiling, individual walls, floors, equipment, and building systems.

3. Include the following information at the top of each page:

a. Project name.

b. Date.

c. Name of Architect.

d. Name of Contractor.

e. Page number.

1.6 WARRANTIES

A. Submittal Time: Submit written warranties on request of Architect for designated portions of the Work where commencement of warranties other than date of Substantial Completion is indicated.

B. Organize warranty documents into an orderly sequence based on the table of contents of the Project Manual.

1. Bind warranties and bonds in heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, thickness as necessary to accommodate contents, and sized to receive 8-1/2-by-11-inch (215-by-280-mm) paper.

2. Provide heavy paper dividers with plastic-covered tabs for each separate warranty. Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer.

3. Identify each binder on the front and spine with the typed or printed title "WARRANTIES," Project name, and name of Contractor.

C. Provide additional copies of each warranty to include in operation and maintenance manuals.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

CLOSEOUT PROCEDURES 01 77 00 - 4

PART 3 - EXECUTION

3.1 FINAL CLEANING

A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions.

1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:

a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.

b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits.

c. Rake grounds that are neither planted nor paved to a smooth, even-textured surface.

d. Remove tools, construction equipment, machinery, and surplus material from Project site.

e. Remove snow and ice to provide safe access to building.

f. Sweep concrete floors broom clean in unoccupied spaces.

g. Clean ducts, blowers, and coils if units were operated without filters during construction.

h. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original condition.

i. Remove debris and surface dust from limited access spaces, including roofs, plenums, shafts, trenches, equipment vaults, manholes, attics, and similar spaces.

j. Vacuum carpet and similar soft surfaces, removing debris and excess nap; shampoo if visible soil or stains remain.

k. Clean transparent materials, including mirrors and glass in doors and windows.

Remove glazing compounds and other noticeable, vision-obscuring materials.

Replace chipped or broken glass and other damaged transparent materials. Polish mirrors and glass, taking care not to scratch surfaces.

l. Remove labels that are not permanent.

m. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.

Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.

1) Do not paint over "UL" and similar labels, including mechanical and electrical nameplates.

CLOSEOUT PROCEDURES 01 77 00 - 5

n. Wipe surfaces of mechanical and electrical equipment and similar equipment.

Remove excess lubrication, paint and mortar droppings, and other foreign substances.

o. Replace parts subject to unusual operating conditions.

p. Clean plumbing fixtures to a sanitary condition, free of stains, including stains resulting from water exposure.

q. Replace disposable air filters and clean permanent air filters. Clean exposed surfaces of diffusers, registers, and grills.

r. Clean light fixtures, lamps, globes, and reflectors to function with full efficiency.

Replace burned-out bulbs, and those noticeably dimmed by hours of use, and defective and noisy starters in fluorescent and mercury vapor fixtures to comply with requirements for new fixtures.

s. Leave Project clean and ready for occupancy.

C. Pest Control: Engage an experienced, licensed exterminator to make a final inspection and rid Project of rodents, insects, and other pests. Prepare a report.

D. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Owner's property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.

END OF SECTION 01 77 00

POLYVINYL-CHLORIDE (PVC) ROOFING 07 54 19-1

SECTION 07 54 19 - POLYVINYL-CHLORIDE (PVC) ROOFING

PART 2 - GENERAL

2.7 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

2.8 SUMMARY

A. Section Includes:

1. Adhered polyvinyl-chloride (PVC) roofing system.

2. Preparation for reroofing or recover application.

3. SBS base sheet fully adhered.

4. Heavy vented base sheet mechanically fastened.

B. Related Requirements:

1. Section 07 62 00 "Sheet Metal Flashing and Trim" for metal roof flashings and counterflashings.

2. Section 07 92 00 "Joint Sealants" for joint sealants, joint fillers, and joint preparation.

2.9 DEFINITIONS

A. Roofing Terminology: Definitions in ASTM D 1079 and glossary in NRCA's "The NRCA Roofing and Waterproofing Manual" apply to work of this Section.

2.10 PREINSTALLATION MEETINGS

A. Preliminary Roofing Conference: Before starting roof construction, conduct conference at Project site.

1. Meet with Owner, Architect, Owner's insurer if applicable, testing and inspecting agency representative, Roofing Installer, roofing system manufacturer's representative, and installers whose work interfaces with or affects roofing, including installers of roof accessories and roof-mounted equipment.

2. Review methods and procedures related to roofing installation, including manufacturer's written instructions.

3. Review and finalize construction schedule, and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

4. Review substrate requirements for conditions and finishes, including and fastening.

5. Review structural loading limitations of roof deck during and after roofing.

6. Review base flashings, special roofing details, roof drainage, roof penetrations, equipment curbs, and condition of other construction that affects roofing system.

POLYVINYL-CHLORIDE (PVC) ROOFING 07 54 19-2

7. Review governing regulations and requirements for insurance and certificates if applicable.

8. Review temporary protection requirements for roofing system during and after installation.

9. Review roof observation and repair procedures after roofing installation.

10. Review roof access, security, background checks, parking, and staging.

B. Preinstallation Roofing Conference: Conduct conference at Project site.

1. Meet with Owner, Architect, Owner's insurer if applicable, testing and inspecting agency representative, roofing Installer, roofing system manufacturer's representative and installers whose work interfaces with or affects roofing, including installers of roof accessories and roof-mounted equipment.

2. Review methods and procedures related to roofing installation, including manufacturer's written instructions.

3. Review and finalize construction schedule, and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

4. Examine deck substrate conditions and finishes for compliance with requirements, including flatness and fastening.

5. Review structural loading limitations of roof deck during and after roofing.

6. Review base flashings, special roofing details, roof drainage, roof penetrations, equipment curbs, and condition of other construction that affects roofing system.

7. Review governing regulations and requirements for insurance and certificates if applicable.

8. Review temporary protection requirements for roofing system during and after installation.

9. Review roof observation and repair procedures after roofing installation.

2.11 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Green Submittals:

1. Product Data for adhesives and sealants used inside the weatherproofing system, documentation including printed statement of VOC content.

C. Shop Drawings: For roofing system. Include plans, elevations, sections, details, and attachments to other work, including:

1. Base flashings and membrane terminations.

2. Roof plan showing orientation of roofing, fastening spacing, and patterns for mechanically fastened roofing.

D. Samples for Verification: For the following products:

1. Sheet roofing, PVC and modified bitumen base sheet of color required.

2. Walkway pads or rolls, of color required.

POLYVINYL-CHLORIDE (PVC) ROOFING 07 54 19-3

2.12 INFORMATIONAL SUBMITTALS

A. Qualification Data: For Installer and manufacturer.

1. Contractor approval for this specific project on manufacturer’s letterhead form manufacturer’s authorized representative for the specific project area.

B. Manufacturer Certificates: Signed by roofing manufacturer certifying that roofing system complies with requirements specified in "Performance Requirements" Article.

1. Submit evidence of compliance with performance requirements.

C. Product Test Reports: For components of roofing system, for tests performed by manufacturer and witnessed by a qualified testing agency.

D. Research/Evaluation Reports: For components of roofing system, from ICC-ES.

E. Field quality-control reports.

F. Sample Warranties: For manufacturer's special 20 year NDL warranties and installer’s sample 3 year warranty.

2.13 CLOSEOUT SUBMITTALS

A. Maintenance Data: For roofing system to include in maintenance manuals.

2.14 QUALITY ASSURANCE

A. Manufacturer Qualifications: A qualified manufacturer that is UL listed, for roofing system identical to that used for this Project.

B. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by roofing system manufacturer to install manufacturer's product and that is eligible to receive manufacturer's special warranty for this specific project.

2.15 DELIVERY, STORAGE, AND HANDLING

A. Deliver roofing materials to Project site in original containers with seals unbroken and labeled with manufacturer's name, product brand name and type, date of manufacture, approval or listing agency markings, and directions for storing and mixing with other components.

B. Store liquid materials in their original undamaged containers in a clean, dry, protected location and within the temperature range required by roofing system manufacturer. Protect stored liquid material from direct sunlight.

1. Discard and legally dispose of liquid material that cannot be applied within its stated shelf life.

C. Protect roof insulation materials from physical damage and from deterioration by sunlight, moisture, soiling, and other sources. Store in a dry location. Comply with insulation manufacturer's written instructions for handling, storing, and protecting during installation.

POLYVINYL-CHLORIDE (PVC) ROOFING 07 54 19-4

D. Handle and store roofing materials, and place equipment in a manner to avoid permanent deflection of deck.

2.16 FIELD CONDITIONS

A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed according to manufacturer's written instructions and warranty requirements.

2.17 WARRANTY

A. Special Warranty: Manufacturer agrees to repair or replace components of roofing system that fail in materials or workmanship within specified warranty period.

1. Special warranty includes membrane roofing, base flashings, adhesive and fasteners, roofing accessories, and other components of roofing system provided by manufacturers for this project.

2. Warranty Period: 20 years from date of Substantial Completion.

B. Special Project Warranty: Submit roofing Installer's warranty, on warranty form at end of this Section, signed by Installer, covering the Work of this Section, including all components of roofing system such as membrane roofing, base flashing, roof insulation, fasteners, cover boards, substrate boards, vapor retarders, and walkway products, for the following warranty period:

1. Warranty Period: Three years from date of Substantial Completion.

PART 3 - PRODUCTS

3.1 MANUFACTURERS

A. Source Limitations: Obtain components including heavy nailed base temporary, base sheets/interply membrane for roofing system recommended and approved by membrane roofing manufacturer.

3.2 PERFORMANCE REQUIREMENTS

A. General Performance: Installed roofing and base flashings shall withstand specified uplift pressures, thermally induced movement, and exposure to weather without failure due to defective manufacture, fabrication, installation, or other defects in construction. Roofing and base flashings shall remain watertight.

1. Accelerated Weathering: Roofing system shall withstand 2000 hours of exposure when tested according to ASTM G 152, ASTM G 154, or ASTM G 155.

2. Impact Resistance: Roofing system shall resist impact damage when tested according to ASTM D 3746 or ASTM D 4272.

POLYVINYL-CHLORIDE (PVC) ROOFING 07 54 19-5

B. Material Compatibility: Roofing materials shall be compatible with one another and adjacent materials under conditions of service and application required, as demonstrated by roofing manufacturer based on testing and field experience.

C. FM Global Listing: Roofing, base flashings, and component materials shall comply with requirements in FM Global 4450 or FM Global 4470 as part of a built-up roofing system, and shall be listed in FM Global's "RoofNav" for Class 1 or noncombustible construction, as applicable. Identify materials with FM Global markings.

1. Fire/Windstorm Classification: Class 1A-90.

2. Hail-Resistance Rating: MH

D. Solar Reflectance Index: Not less than 68 when calculated according to ASTM E 1980, based on testing identical products by a qualified testing agency.

E. Energy Star Listing: Roofing system shall be listed on the DOE's ENERGY STAR "Roof Products Qualified Product List" for low-slope roof products.

F. Energy Performance: Roofing system shall have an initial solar reflectance index of not less than 0.62 and an emissivity of not less than 0.60 when tested according to CRRC-1.

G. Exterior Fire-Test Exposure: ASTM E 108 or UL 790, Class A; for application and roof slopes indicated; testing by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.

H. Fire-Resistance Ratings: Comply with fire-resistance-rated assembly designs indicated.

Identify products with appropriate markings of applicable testing agency.

2.3 SBS MODIFIED BITUMEN BASE SHEET MATERIAL

A. Roofing membrane and flashing base sheet: ASTM D 6163, Grade, Type 1, glass fiber reinforced, SBS modified asphalt sheet, for application method specified.

1. Basis of Design: JM DynaWeld Cap FR

2. Soprema Elastophene 180

3. Carlisle’s Modified Base Sheet

2.4 PVC ROOFING

A. PVC Sheet: ASTM D 4434/D 4434M, Type III, fabric reinforced containing KEE (Elvaloy) to reduce plasticized migration and fabric backed.

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

2. Basis-of-Design Product:

a. JM PVC Fleece Backed http://www.specagent.com/LookUp/?ulid=5098&mf=04&mf=95&src=wd&mf=04&src=wd

POLYVINYL-CHLORIDE (PVC) ROOFING 07 54 19-6

b. Soprema Sentinel 200 HFB

c. Carlisle’s FleeceBack PVC KEE

3. Thickness: 60 mils (0.1524 mm), minimum.

4. Exposed Face Color: White

2.5 AUXILIARY ROOFING MATERIALS

A. General: Auxiliary materials recommended by roofing system manufacturer for intended use and compatible with roofing.

1. Liquid-type auxiliary materials shall comply with VOC limits of authorities having jurisdiction.

2. Adhesives and sealants that are not on the exterior side of weather barrier shall comply with the testing and product requirements of the California Department of Public Health's (formerly, the California Department of Health Services') "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers."

B. Sheet Flashing: Manufacturer's standard sheet flashing of same material, type, reinforcement, thickness, and color as PVC sheet.

C. Bonding Adhesive: Manufacturer's standard.

D. Slip Sheet: Manufacturer's standard, of thickness required for application.

E. Metal Termination Bars: Manufacturer's standard, predrilled stainless-steel or aluminum bars, approximately 1 by 1/8 inch (25 by 3 mm) thick; with anchors.

F. Metal Battens: Manufacturer's standard, aluminum-zinc-alloy-coated steel sheet, or extruded aluminum bar approximately 1 inch wide by 0.05 inch (25 mm wide by 1.3 mm) thick, pre-punched.

G. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion-resistance provisions in FM Global 4470, designed for fastening roofing to substrate, and acceptable to roofing system manufacturer.

H. Miscellaneous Accessories: Provide pourable sealers, preformed cone and vent sheet flashings, preformed inside and outside corner sheet flashings, T-joint covers, lap sealants, termination reglets, and other accessories.

2.6 WALKWAYS

A. Flexible Walkways: Factory-formed, nonporous, heavy-duty, slip-resisting, surface-textured walkway pads or rolls approximately 72 mils (1.83 mm) thick and acceptable to roofing system manufacturer.

POLYVINYL-CHLORIDE (PVC) ROOFING 07 54 19-7

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements and other conditions affecting performance of the Work:

1. Verify that roof openings and penetrations are in place, curbs are set and braced, and roof-drain bodies are securely clamped in place.

2. Verify that wood blocking, curbs, and nailers are securely anchored to roof deck at penetrations and terminations and that nailers match thicknesses of insulation.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Clean substrate of dust, debris, moisture, and other substances detrimental to roofing installation according to roofing system manufacturer's written instructions. Remove sharp projections.

B. Prevent materials from entering and clogging roof drains and conductors and from spilling or migrating onto surfaces of other construction. Remove roof-drain plugs when no work is taking place or when rain is forecast.

3.3 RECOVER PREPARATION

A. Prepare existing roof according to roofing system manufacturer’s written instructions, applicable recommendations of the roofing manufacturer and requirements in this section.

B. Tear out failed/deteriorated base flashings, counterflashings, all pitch pans, pipe flashings, scuppers, vents and like components necessary for application of new membrane.