This Statement of Work (SOW) details a roof replacement project for six Temporary Lodging Facilities (TLFs) at Whiteman Air Force Base in Missouri. The project involves removing and replacing approximately 27,882 square feet of roofing across buildings B3001, B3003, B3201, B3203, B3205, and B3206, with specific requirements including potential asbestos abatement, comprehensive roof system replacement, and adherence to multiple federal and installation standards.

The scope of work includes complete roof system removal and replacement, with more extensive work required for buildings B3001 and B3003, which have three attached carports and significant roof deterioration. The contractor must sample and validate potential asbestos-containing materials, remove and dispose of them according to state and federal regulations, replace sheathing, rafters, fascia, and soffit, and install new roofing components including impact-resistant shingles, ice and water shields, and proper flashing. The project requires compliance with multiple Unified Facilities Criteria (UFC), Unified Facilities Guide Specifications (UFGS), and Whiteman AFB Installation Facilities Standards. The contractor must provide a 25-year manufacturer's warranty and a 5-year workmanship warranty.

View the file

Other files

File Type Posted
Solicitation Amendment FA462525R00040004 SF 30.pdf PDF
TLF Roof Replacements Attachment 1_SOW_2025-04-28_Rev 5.pdf PDF
Solicitation Amendment FA462525R00040003 SF 30.pdf PDF
FA462525R0004 Questions and Answers 30Apr25.pdf PDF
TLF Roof Replacement Solicitation SIte Visit Sign In Sheet.pdf PDF
Solicitation Amendment FA462525R00040002 SF 30.pdf PDF
FA462525R0004 Amendment Questions and Answers dated 18 April 2025.pdf PDF
Amendment 2 TLF Roof Replacement Solicitation Site Visit Meeting Minutes.pdf PDF
Solicitation Amendment FA462525R00040001 SF 30.pdf PDF
FA462525R0004 Questions and Answers 04Apr25.pdf PDF
1148979_SOW_TLF Roof Replacements_2025-04-04_Rev 4_Redline.pdf PDF
Solicitation Amendment FA462525R00040001 SF 30.pdf PDF
TLF Roof Replacements Attachment 4 dated 19 Nov 2024.pdf PDF
TLF Roof Replacements Attachment 07 Special_Construction_Clauses_31 March 2025.pdf PDF
Davis-Bacon Act Wage Determination MO20250059 Attachment 6 Dated 03 Jan 2025.pdf PDF
TLF Roof Replacements Attachment 08 NAF Standard_Clauses_31 March 2025.pdf PDF
Solicitation - FA462525R0004.pdf PDF
TLF Roof Replacements Attachment 2 dated 19 Nov 2024.pdf PDF
TLF Roof Replacements Attachment 3 dated 19 Nov 2024.pdf PDF
Whiteman AFB Security Procedures Attachment 5 dated March 2024.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Whiteman Air Force Base

STATEMENT OF WORK

Project 1148979 Repair Roofs on TLFs

509 CES/CENMP

18 December 2024

Table of Contents

1.0 Introduction

1.1 Description

1.2 Location

1.3 Background

1.4 Objective

2.0 Scope of Work

2.1 Description of Work

2.2 Parameters

3.0 Standards and Codes

3.1 The contractor shall comply with the following UFCs:

3.2 The contractor shall comply with the following UFGS:

3.3 The contractor shall comply with the following IFS:

4.0 Submittals

4.1 Materials and Products

4.2 Other Submittals

5.0 Warranties

5.1 Manufacturer’s Warranty

5.2 Contractor’s Warranty

6.0 Maps

7.0 Attachments

1 | P a g e

1.0 Introduction

1.1 Description

Whiteman Air Force Base (WAFB) has six temporary lodging facilities (TLF)s. Buildings B3001 and B3003 offer three attached carports and buildings B3201, B3203, B3205 and B3206 do not offer carports but have a common parking area. The TLFs are predominately used to house military members and families during permanent change of station (PCS) moves. They offer extended stay hotel accommodations for military members and families who may not have housing during the in-processing or out-processing timeframes. The roofing on the TLFs is no longer functional and needs to be replaced. To continue to offer TLFs to guests the current roofing will be removed and replaced with like-style roofing.

1.2 Location

The TLFs are located on the northwest side of Whiteman AFB, on Gray Street. Buildings B3001 and B3003 are adjacent and B3201, B3203, B3205 and B3206 are adjacent.

1.3 Background

Buildings B3001 and B3003 were constructed in 1959 and have had multiple sections of shingles replaced over the years. Buildings B3201, B3203, B3205 and B3206 were built in the mid-1990’s and have undergone multiple shingle repairs as well. None of the six buildings have had their roofs replaced in full and have surpassed their life expectancy. Due to shingle failures over the years, the roof sheathing for B3001 and B3003 is deteriorated and no longer in usable condition. The sheathing and rafters on the three attached carports are also deteriorated and require replacement. The sheathing on buildings B3201, B3203, B3205, and B3206 will be replaced on an as needed basis, as these roofs have not sustained as much water damage as B3001 and B3003. The roofs on the TLFs are in critical condition and need to be replaced to allow for FSS to carry out their mission requirements.

1.4 Objective

The contractor shall provide all services, materials, supplies, labor, studies, management, travel, and other resources to provide a roof replacement of roughly 27,882 square feet on buildings B3001, B3003, B3201, B3203, B3205 and B3206.

2.0 Scope of Work

The roof replacement on the TLFs will include the removal and replacement of the existing roofing system down to and including the rafters, sheathing, fascia, and soffit of the three carports attached to buildings B3001 and B3003. The contractor shall sample and validate, with test results, if the soffit panels on the carports of B3001 and B3003 are asbestos containing materials (ACM)s as stated in the as-built drawings. The contractor shall remove the soffit panels on the carports and dispose of the ACM in accordance with existing State, Federal, OSHA and EPA regulations. In addition to the carports, the main roofing components on buildings B3001 and B3003 shall be removed and replaced down to and including the sheathing. The fascia and soffit on B3001 and B3003 and their corresponding carports shall be replaced to support the installation of new rain and ice shields. The existing roofing system on buildings B3201, B3203, B3205, and B3206 shall be removed and

2 | P a g e replaced down to but not including the sheathing. Up to 10% of the cumulative sheathing on these four facilities shall be replaced if the deterioration is extensive. All roof vents, piping boots, and flashings shall be removed and replaced with like-style products for buildings B3001, B3003, B3201, B3203, B3205, and B3206. All buildings and carports shall have ice and water shields installed at all gutter lines and valleys.

2.1 Description of Work.

2.1.1 Site preparation and demolition

2.1.1.1 The contractor shall sample and validate, with test results, if the soffit panels on the carports of B3001 and B3003 are ACMs.

2.1.1.2 The contractor shall submit an Asbestos Project Notification to the State of Missouri’s Air Pollution Control Program at least 10 working days before starting the project. This notification must include a copy of the asbestos inspection report and laboratory analytical results (10 CSR 10-6.250 Asbestos Projects).

2.1.1.3 The contractor shall abate and properly dispose of the soffit panels on the carports of B3001 and B3003 in accordance with existing State, Federal, OSHA and EPA regulations.

2.1.1.4 The contractor shall remove all shingles, gravel stops, underlayment, rafters, sheathing, fascia, fascia boards, and soffit on the three carports attached to buildings B3001 and B3003.

2.1.1.5 The contractor shall remove all shingles, sheathing, underlayment, chimney flashing, roof piping boots/flashing, fascia, fascia boards, soffit and all roof vents on buildings B3001 and B3003.

2.1.1.6 The contractor shall remove all shingles, underlayment, roof piping boots/flashing, roof vents, and up to 10% of the cumulative sheathing on buildings B3201, B3203, B3205 and B3206.

2.1.1.7 All excess materials associated with the demolition and/or installation of the existing roof systems, shall be properly disposed of by the contractor.

2.1.2 Installation

2.1.2.1 Install new like-style rafters on the carports of buildings B3001 and B3003.

2.1.2.2 Install new like-style soffit panels on the carports of buildings B3001 and B3003.

2.1.2.3 Install new fascia and fascia boards on buildings B3001 and B3003 and their associated carports. The fascia shall match the roof color (WAFB IFS, D07.5.3).

2.1.2.4 Install new soffit on buildings B3001 and B3003 and their associated carports. The soffit color shall match the fascia color and be compatible with adjacent facilities (WAFB IFS, D07.1.10).

2.1.2.5 The contractor shall reinstall the existing gutters on buildings B3001 and B3003 and their associated carports.

2.1.2.6 Install and replace with like-style CDX plywood sheathing over the entire roof and carports on buildings 3001 and 3003. Replace up to 10% of the damaged roof sheathing on buildings B3201, B3203, B3205 and B3206, to be replaced with like-style CDX plywood.

3 | P a g e

2.1.2.7 Install a 30-pound minimum, non-perforated organic asphalt saturated roofing felt meeting ASTM D226/D226M Type 2 or ASTM D4869/D4869M Type 4 over the entire roof deck (UFC 3-110-03, 3-4.4).

2.1.2.8 Install ice and water shields at all gutter lines and valleys on all buildings and associated carports. The ice and water shield underlayment shall comply with ASTM D1970/D1970M for sealability around nails (UFGS 07-31-13, 2.1.4.1). Ice and water shields at the gutter lines shall match the color of the fascia.

2.1.2.9 Install impact resistant shingles conforming to UL 2218/ASTM 2218 Class 4, per manufacturer’s specifications using roofing nails meeting the specifications in

(UFGS 07-31-13, 2.1.6).

2.1.2.10 Install hip and ridge shingles formed from 9 by 12-inch individual shingles or from 12 by 12-inch shingles cut from 12 by 36-inch strip shingles (UFGS 07-31- 13, 3.2.5).

2.1.2.11 The contractor shall provide either closed cut or woven valley methods for strip shingles.

2.1.2.12 Install and properly secure roof vents. All vents shall match the color of the roof (WAFB IFS, D07.6.7).

2.1.2.13 Install and properly secure piping boots with like-style boots.

2.1.2.14 Vents and other projections through the roof shall be properly flashed and secured in position, and projecting nails must be driven flush with the deck. Metal flashings must be one of the materials listed in (UFC 3-110-03, 3-3.4) and the color of the flashings shall match the color of the predominant background material

(WAFB IFS, D07.4.5).

2.1.2.15 The contractor shall abide by the specifications listed in (UFGS 07-31-13, 3.3.7.4) for chimney flashings on buildings B3001 and B3003.

2.1.2.16 At the end of each workday the contractor shall completely seal the roof system from moisture intrusion, in such a way that it may withstand a head of water.

Existing drains must remain in working order until the new roof and associated drainage system is completely functional (UFC 03-110-03, 6-13.1).

2.2 Parameters

2.2.1 The contractor shall deliver materials in the manufacturer’s unopened bundles and containers bearing the manufacturer’s brand name.

2.2.2 The contractor shall store materials according to the manufacturer’s written instructions.

2.2.3 The contractor shall provide shingles manufactured with the same date and lot number.

2.2.4 The contractor shall abate and dispose of the soffit panels on the carports of B3001 and B3003 simultaneously to avoid multiple mobilization and demobilization costs.

2.2.5 The contractor shall complete the installation of one roofing system at a time, in the following order: B3001, B3003, B3201, B3206, B3205, and B3203.

2.2.6 The government shall furnish copies of available as-built drawings which are pertinent to the facility, as shown in attachments 1 through 3. The government does not guarantee the accuracy or adequacy of the available as-built drawings and the

4 | P a g e contractor shall verify, by field investigation, all conditions and information relevant to the project.

Standards and Codes

2.3 The contractor shall comply with the following UFCs:

2.3.1 UFC 1-200-02: High Performance and Sustainable Building Requirements

2.3.2 UFC 4-010-01: DoD Minimum Antiterrorism Standards for Buildings

2.3.3 UFC 1-200-01: DoD Building Codes

2.3.4 UFC 3-101-01: Architecture

2.3.5 UFC 3-110-03: Roofing

2.4 The contractor shall comply with the following UFGS:

2.4.1 UFGS 07-31-13: Thermal and Moisture Protection – Asphalt Shingles

2.4.2 UFGS 02-82-00: Asbestos Remediation

2.5 The contractor shall comply with the following IFS:

2.5.1 Whiteman Air Force Base Installation Facilities Standards

3.0 Submittals

3.1 Materials and Products

3.1.1 Shingles

3.1.2 Underlayment

3.1.3 Roofing nails

3.1.4 Flashing metal

3.1.5 Piping boots

3.1.6 Sheathing

3.1.7 Rafters

3.1.8 Roof vents

3.1.9 Fascia

3.1.10 Soffit

3.1.11 Soffit Panels

3.1.12 Ice and water shields

3.2 Other Submittals

3.2.1 Manufacture’s application instructions for shingles

3.2.2 Manufacture’s application instructions for underlayment

5 | P a g e

3.2.3 Summary of ACM validation for each carport. The summary shall include the materials tested, location of samples taken, and test results for each sample.

3.2.4 Asbestos Project Notification to the State of Missouri’s Air Pollution Control Program

3.2.5 Asbestos Abatement Remediation Plan

3.2.6 Removal hazardous waste manifest with transporter and Treatment, Storage, and Disposal Facility information

3.2.7 Return hazardous waste manifest with management method code

3.2.8 As-built drawings of the carports at B3001 and B3003 detailing ACM materials removed and the like-style materials which replaced the ACM materials.

3.2.9 Asbestos Occupation Certifications from the Missouri Department of Natural Resources for all personnel who participate in the asbestos inspection, testing, and abatement.

4.0 Warranties

4.1 Manufacturer’s Warranty

The contractor shall furnish the asphalt shingle manufacturer’s standard 25-year warranty for the shingles. The manufacturer’s warranty shall meet the criteria stated in (UFC 3-110-03, 1-8.12) and the warranty must begin on the date of government acceptance of the work.

4.2 Contractor’s Warranty

The contractor shall provide a 5-year warranty for the asphalt shingle roofing system, as installed, is free from defects in workmanship. When repairs due to defective workmanship are required during the contractor’s warranty period, the contractor shall make such repairs within 72 hours of notification. When repairs are not performed within the specified time, emergency repairs performed by others will not void the warranty. The contractor’s warranty must begin on the date of government acceptance of the work.

5.0 Maps

1. Site Location Map

2. Site Plan Map

HOLE 18

HOLE 17

HOLE 16

806 802 849

106103

75092

97101

808 846

75091

75090

810 807

20005

1561316

890700

705707

213 217

177176

819 832

727729

304 303

30033003

823 712 708 706

333334

811 809

807 803

821 831

802804

805843809

817 835

GRAY LANE

VA

ND

EN

BE

R G

AV

EN

UE

SU

MM

IT

CIRCLE

MITCHELL AVENUE

2ND

STREET

TR

AV

IS

LA

NE

MC

CO

NN

EL

L L

AN

E

LIN

D B

ER

GH

ST

RE

ET

5TH STREET

AL

TU

SCIRCLE

DOW

LANE

6TH

STREET

MARCH

DRIVE

KELLY ROAD

SPIRITBOULEVARD

DOOLIT

TL

E

DRIVE

TH

OR

LA

NE

RAMEY

LANE

HOUX DRIVE

8TH

STREET

MACE CIRCLE

MITCHELL

AVE

NUE

9TH STREET

TRAVIS

LANE

SPIRIT BOULEVARD

3RD STREET

10TH STREET

POSTDRIVE

SO

UT

H

TR

AV

IS

DOOLIT

TLE

DRIVE

DOOLITTL E

DRIVE

TITANLOOP

WRIGHT STREET

SUMMIT DRIVE

CENTER STREET

4TH STREET

1ST STREET

CHENNAU

LT

LA

NE

SIJAN AVENUE

SPIRITBOULEVARD

SE 170 JC

FORBES STREET

ELLSWORTH LANE

TINIAN LANE

20013

20014

2054 186

75095

WHITEMAN AFB - MISSOURI

Pat h:

B:\

CE

NM

E\

_M

AP

S\

Ta b M ap s\S ite Lo cat ion

M ap

\S

ITE

LO

CA

TIO

N W

AF

B 2

4.m xd

1:7,200 1 inch = 600 feet.

0 600300 Ft

Date: 14 Nov 2024

DEPARTMENT OF THE AIR FORCE

CO N TR OL L ED U NC L AS S IFI ED INF O R MA T ION (C UI )

SITE LOCATION MAP

PROJECT

LOCATION

SPIRIT GATE

3005 3005

GRAY LANE

DOOLIT

TLE

DRIVE

TR

AV

IS L

AN

E

TR

AV

IS L

AN

E

DOOLITTLE

DRIVE

SPIRIT BOULEVARDSPIRIT BOULEVARD

ELLSWORTH LANE

SO

UT

H T

RA

VIS

DOOLITTLE

DRIVE

FO

RB

ES

ST

R E

ET

FORBES STREET

WHITEMAN AFB - MISSOURI

Pat h:

B:\

CE

NM

E\

_M

AP

S\

Ta b M ap s\S ite Lo cat ion

M ap

\S

ITE

LO

CA

TIO

N W

AF

B 2

4.m xd

1:1,750 1 inch = 146 feet.

0 14673 Ft

Date: 14 Nov 2024

DEPARTMENT OF THE AIR FORCE

CO N TR OL L ED U NC L AS S IFI ED INF O R MA T ION (C UI )

SITE PLAN

1537116630C Text Box Laydown yard

1537116630C Line

1537116630C Polygonal Line

8 | P a g e

6.0 Attachments

1. Building B3001 As-builts

2. Building B3003 As-builts

3. Buildings B3201, B3203, B3205, and B3206 As-builts

1.0 Introduction
2.0 Scope of Work
2.2 Parameters
Standards and Codes
2.3 The contractor shall comply with the following UFCs:
2.4 The contractor shall comply with the following UFGS:
2.5 The contractor shall comply with the following IFS:
3.0 Submittals
3.1 Materials and Products
3.2 Other Submittals
4.0 Warranties
4.1 Manufacturer’s Warranty
4.2 Contractor’s Warranty
5.0 Maps
6.0 Attachments

File details come from the government source that posted it. Updated .