1-Vehicle Glass Replacement, Repair, Tinting and accessories BPM0.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
Vehicle Glass Replacement, Repair, Tinting and accessories
Solicitation number
BPM007111
Issued by
Arizona

About this file

Vehicle Glass Replacement, Repair, Tinting and Accessories Pricing Sheet Summary

This is a pricing submission form for the Arizona Department of Transportation (ADOT) Solicitation No. BPM007111 for Vehicle Glass Replacement, Repair, Tinting and Accessories services. The solicitation covers three primary service categories: Facility Labor Rates for vehicle glass replacement or repair at contractor facilities, Mobile Repair Labor Rates for on-site mobile services, and Tinting Services. Contractors must complete the General Information tab and any applicable category tabs corresponding to their service offerings. Geographic coverage includes individual Arizona counties (Apache, Cochise, Coconino, Gila, Graham, Greenlee, La Paz, Maricopa, Mohave, Navajo, Pima, Pinal, Santa Cruz, Yavapai, and Yuma) or statewide coverage options. The contract term is twelve months with potential extensions up to forty-eight months total, and the proposal deadline is October 17, 2025, with offers valid for 120 days.

The pricing structure requires contractors to submit labor rates and extended amounts for each applicable category. For Category One (Facility Labor), the standard evaluation includes 950 annual hours at an hourly rate and a windshield replacement example for a 2025 Chevrolet Trax with a total extended amount of $85,657.30. Category Two (Mobile Repair) evaluation is based on 1,150 annual hours plus a windshield replacement example for a 2024 Chevrolet Silverado with a total extended amount of $101,115.30. Category Three (Tinting) requires pricing for the same vehicle examples with 150 and 210 estimated annual windows respectively. Contractors may include optional services such as recalibration, chip repair, and parts pricing (OEM Glass, Mouldings, Urethane kits), as well as any Purchasing Card surcharges. An administrative fee of 1.5% will be charged on contract sales, increasing to 2% effective January 1, 2025. Contractors must maintain appropriate insurance coverage and submit quarterly usage reports.

View the file

Other files

File Type Posted
1-BPM007111_Price_Increase_Percentages1.docx DOCX document
1-DOC093025-09302025132857.pdf PDF
1-BPM007111_Price_Increase_Percentages.pdf PDF
1-BPM007111_Pricing_Sheet GWM COMMERCIAL AUTO GLASS.xlsx XLSX spreadsheet
1-COI BPM007111.pdf PDF
1-BPM007111_Solicitation_Q_and_A_updated_10.17.25.xlsx XLSX spreadsheet
1-ATTACHEMENT OFFER AND ACCEPTANCE.pdf PDF
1-Financial Envelope-Proposal # 1-prop_answer.xls XLS spreadsheet
BPM007111_Award_Documents.pdf PDF
1-ADOT Confidential and Trade Secrets BPM007111.pdf PDF
1-BPM007111_Pricing_Sheet1.xlsx XLSX spreadsheet
1-ARIZANA.pdf PDF
1-Vehicle Glass Replacement, Repair, Tinting and accessories BPM0_638963031159853123 10-17-2025.xlsx XLSX spreadsheet
BPM007111_Solicitation_Requirements.pdf PDF
1-BPM007111_Price_Increase_Percentages GWM COMMERCIAL AUTO GLASS.pdf PDF
1-[Vehicle Glass Replacement^J Repair^J Tinting and accessories] BPM0.docx DOCX document
1-ADOT Confidentiality and Trade Secrets BPM0_638956216825883987.pdf PDF
1-Dot glass increase.docx DOCX document
1-Subcontractors.xlsx XLSX spreadsheet
1-BPM007111_Pricing_Sheet .xlsx XLSX spreadsheet
1-BPM007111_List_of_Subcontractor.xlsx XLSX spreadsheet
1-DOC093025-09302025133551.pdf PDF
1-Attachment Offer and Acceptance BPM007111.pdf PDF
1-OFFER AND ACCEPTANCE 10-17-2025 .pdf PDF
1-Proposal # 1-prop_items.xls XLS spreadsheet
1-BPM007111_Pricing_Sheet (4).xlsx XLSX spreadsheet
1-[Vehicle Glass Replacement^J Repair^J Tinting and accessories] BPM0_638956978073674734.docx DOCX document
1-Offer and Acceptance BPM0_638956216820605523.pdf PDF
1-BPM007111_Pricing_Sheet (2).xlsx XLSX spreadsheet
1-Vehicle Glass Replacement Repai^J Tinting and accessories BPM0_638956978071447807.xlsx XLSX spreadsheet
1-BPM007111 Pricing Sheet.xlsx XLSX spreadsheet
1-OFFER AND ACCEPTANCE.png PNG image
BPM007111_Pre-Solicitation_Documents.pdf PDF
1-Pricing Sheet.xlsx XLSX spreadsheet
1-CONFIDENTIALITY AND TRADE SECRETS.png PNG image
1-BPM007111_List_of_Subcontractor (1).xlsx XLSX spreadsheet
1-ADOT.pdf PDF
1-PRICE INCREASE PERCENTAGES 10-17-2025.pdf PDF
1-Price Increase Percentages BPM007111.docx DOCX document
1-PRICING SHEET.xlsx XLSX spreadsheet
1-BPM007111_List_of_Subcontractor GWM COMMERCIAL AUTO GLASS.xlsx XLSX spreadsheet
1-BPM007111_Offer_and_Acceptance.pdf PDF
1-List of Subcontractors BPM007111.xlsx XLSX spreadsheet
1-BPM007111_Confidentiality_and_Trade_Secrets GWM COMMERCIAL AUTO GLASS.pdf PDF
1-BPM007111_List_of_Subcontractor (version 1).xlsx XLSX spreadsheet
1-BPM007111_Confidentiality_and_Trade_Secrets.pdf PDF
1-OfferandAccemptance.pdf PDF
BPM007111_Solicitation_Instructions.pdf PDF
1-BPM007111_Pricing_Sheet(1).xlsx XLSX spreadsheet
1-ADOT CONFIDENTIALITY AND TRADE SECRETS.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions (READ FIRST) Instructions for the Vehicle Glass Replacement, Repair, Tinting and accessories attachment:

The Pricing Sheet Form for Vehicle Glass Replacement, Repair, Tinting and accessories is made up of the following sections: General Information, Facility Labor Rates, Mobile Repair Labor Rates, Tinting Rates which coincide with the tabs listed below. All Contractors placing a Bid Submittal shall at a minimum Complete the General Information Tab and any and all tabs for the categories being offered. Extended Amounts for each evaluation section must be entered into the items tab in the Arizona Procurement Portal.

Category One: Facility Labor Rates
Category Two: Mobile Repair Labor Rates
Category Three: Tinting Rates

General Information

Pricing Sheet for Vehicle Glass Replacement, Repair, Tinting and accessories
Vehicle Glass Replacement, Repair, Tinting and accessories - BPM007111

General Information

Instructions: The Contractor shall complete the sections of the General Information tab below to be considered for an award per section 4 of the Specifications.

If the contractor offers coverage areas for Glass Repair, they may indicate with an (X) next to the applicable countiesIf the contractor offers coverage for Categories 1,2 or 3, they may indicate with an (X) next to the applicable category
ApacheXCategory 1 Facility (Vehicle Glass Replacement or Repair)
CochiseXCategory 2 Mobile (Vehicle Glass Replacement or Repair)
CoconinoCategory 3 Tinting Services
Gila
Graham
Greenlee
La Paz
Maricopa
Mohave
Navajo
Pima
Pinal
Santa Cruz
Yavapai
Yuma
X(X) Statewide Coverage

If applicable, the Contractor may add a Trip Flat Rate fee for the first 30 miles from service location. Trip Flat Rate fee for Increments of 15 Miles thereafter Notes

The Offeror must list any Purchasing Card surcharges associated with payment of parts or services by the agency (Paragraph 3.4 in the Specifications).

1. Facility Labor Rates

Pricing Sheet for Vehicle Glass Replacement, Repair, Tinting and accessories
Vehicle Glass Replacement, Repair, Tinting and accessories - BPM007111

Facility Labor and Service Rates

Instructions: The Contractor shall complete the sections of the Labor and Service Rates tab below to be considered for an award for this category per section 4.6 of the Specifications.

The Contractor shall provide labor rates for any labor levels that may be applicable to the service being offered. This may include Emergency After Hours for drive in, etc. Any additional labor rates shall be listed.The Standard Facility Labor rates and Windshield replacement example will be used for evaluation purposes. Below indicate all labor rates as required in section 4.6.

Contractor shall enter the extended total amount in RED to Line #1 in APP under the line items tab.

Labor LevelEstimated Quantity -AnnuallyRate Price per HourExtended Amount (Rate X Estimated Quantity)
Standard Facility Labor Rate for Glass replacment95060$ 57,000.00
Windshield Replacement after NAGS Discount (Total Cost) for a 2025 Chevrolet Trax - Vin KL77LHEP6SC08841635818.78$ 28,657.30
$_______
$_______
$_______
$_______
$_______
$_______
$_______
Total amount to be entered into Line #1 in the APP Line Items tab
$ 85,657.30

2. Mobile Repair Labor Rates

Pricing Sheet for Vehicle Glass Replacement, Repair, Tinting and accessories
Vehicle Glass Replacement, Repair, Tinting and accessories - BPM007111

Mobile Repair Labor and Service Rates

Instructions: The Contractor shall complete the sections of the Labor and Service Rates tab below to be considered for an award for this category per section 4.6 of the Specifications.

The Contractor shall provide labor rates for any labor levels that may be applicable to the service being offered for Mobile service. This may include Emergency After Hours for mobile service, etc. Any additional labor rates shall be listed.The Standard Mobile Repair rates and windshield replacement example will be used for evaluation purposes. Below indicate all labor rates as required in section 4.6.

Contractor shall enter the extended total amount in RED to Line #2 in APP under the line items tab.

Labor LevelEstimated Quantity -AnnuallyRate Price per HourExtended Amount (Rate X Estimated Quantity)
Standard Mobile Repair Labor Rate for Glass Replacement115064.95$ 74,692.50
Windshield Replacement after NAGS Discount (Total Cost) for a 2024 Chevrolet Silverado - Vin 1GC1YLE74RF39262540660.57$ 26,422.80
$_______
$_______
$_______
$_______
$_______
$_______
$_______
$_______
Total amount to be entered into Line #2 in the APP Line Items tab
$ 101,115.30

3. Tinting Rates

Pricing Sheet for Vehicle Glass Replacement, Repair, Tinting and accessories
Vehicle Glass Replacement, Repair, Tinting and accessories - BPM007111

Tinting Service Rates

Instructions: The Contractor shall complete the sections of the Tinting Service Rates tab below to be considered for an award for this category per section 4.7 of the Specifications.

Contract Vehicle Tinting Pricing: The Contractor shall provide pricing structures for any and all manufacture tint being offered in accordance to section 4.7 of the specification. Additionally the Contractor shall provide evaluation pricing in the table to the left labeled Evaluation Pricing.
Evaluation Pricing: The Contractor shall provide pricing for the vehicles listed below if offering Category 3. The Vehicles listed below will be used for evaluation purposes.

Contractor shall enter the extended total amount in RED to Line #3 in APP under the line items tab.

Description/Manufacture Pricing Structure (i.e. discount off of catalog at cost etc.)

Vehicle WindowEstimated Quantity -AnnuallyRate Price per WindowExtended Amount (Rate X Estimated Quantity)
2025 Chevrolet Trax - Vin KL77LHEP6SC088416150$_______ERROR:#VALUE!
2024 Chevrolet Silverado - Vin 1GC1YLE74RF392625210$_______ERROR:#VALUE!
Total amount to be entered into Line #3 in the APP Line Items tab
ERROR:#VALUE!

4. Supplemental Pricing Sheet

Pricing Sheet for Vehicle Glass Replacement, Repair, Tinting and accessories
Vehicle Glass Replacement, Repair, Tinting and accessories - BPM007111

OFFEROR:

Supplemental Pricing Sheet

Instructions: The Contractor shall use this Supplemental Pricing Sheet tab to list any and all optional services and Parts being offered. Services may include chip repair, tint strips, laminate services and recalibrations. Offeror may add additional lines as necessary.

Additionally the Contractor shall list pricing structures for any and all parts associated with any services being offered in all catagories, such as OEM Glass replacement, Moundings and Urethane etc.

Description of ServiceUnit PriceUnit of MeasureNotesDescription of Parts and or MaterialsPricing Structure (i.e. discount off of NAGS)
Recalibration-Dynamic$300OEMList -10%
Recalibration-Static$300MouldingsList -10%
Recalibration-Dual$600
Urethane kit$29.45

File details come from the government source that posted it. Updated .