This is a Scope of Work document issued by the State of Hawaii Department of Land and Natural Resources, Division of State Parks for repair and maintenance work at the Hapuna Beach State Recreation Area Pavilion located in Waimea, Hawaii. The project (Job #F75C646H) involves demolition and in-kind replacement of deteriorated exterior siding and screen wall assemblies, installation of a continuous concrete curb at the building perimeter, surface preparation, priming, painting, and related incidental work to restore the pavilion's building envelope while preserving its architectural character. The work is divided into a Base Bid and two Additive Alternates covering different wall sections: the Base Bid encompasses portions of the North and South walls plus the entire West Wall; Additive Alternate No. 1 covers portions of the North and South walls; and Additive Alternate No. 2 covers portions of the North and South walls plus the entire East Wall with additional polycarbonate glazing panel replacement. Approximate materials include 4x4 posts, 2x4 and 1x2 lumber, plywood, stainless steel screen mesh, and an estimated 2,400 square feet of prime and paint work.

The contractor is responsible for obtaining all required permits and licenses prior to construction commencement and must verify all field measurements and quantities before bid submission. The work requires daily site cleanup, proper waste disposal via off-site dumpster, site security with barricades and safety signage, and compliance with all federal, state, and county laws including the Building Code of the County of Hawaii, NFPA standards, and ADMG barricade requirements. The park shall remain open during construction, necessitating comprehensive public safety measures. Project contacts include Renee Kamisugi, State Parks Planner, and Luisa Castro, State Parks District Superintendent. The contractor bears full responsibility for restoring any damaged elements caused by construction activities and must immediately notify the project manager upon encountering hazardous materials, which the contractor is not authorized to handle without specific authorization.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF HAWAI`I

DEPARTMENT OF LAND AND NATURAL RESOURCES

DIVISION OF STATE PARKS

1151 PUNCHBOWL ST, SUITE 310

HONOLULU, HI 96813

SCOPE OF WORK Date: 4/30/2026

To: Bidding Contractors

State Parks Job#: F75C646H

Project Name: HAPUNA BEACH SRA - PAVILION REPAIR AND MAINTENANCE

Location: Hapuna Beach State Recreation Area

Waimea, Hawaii, Hawaii

LOCATION MAP VICINITY MAP/OVERALL SITE PLAN

NOT TO SCALE NOT TO SCALE

HAPUNA BEACH STATE RECREATION AREA

CAMPGROUNDS AREA MAP, NOT TO SCALE

PROJECT SITE

HAPUNA BEACH SRA

LIMITS OF WORK

PROJECT SITE

HAPUNA BEACH SRA

LIMITS OF WORK

PAVILION

to HIGHWAY

BEACH

PARK

SCOPE OF WORK 1 F75C646H - HAPUNA BEACH SRA

State Parks Job#: F75C646H Project Name: HAPUNA BEACH SRA - PAVILION REPAIR AND MAINTENANCE

Scope of Work (continued)

SCOPE OF WORK

The contractor shall provide labor, materials and equipment necessary to satisfactorily complete all work associated with the project. The work generally includes repairs to the pavilion. This includes, but is not limited to, demolition and in-kind replacement of all interior and exterior walls, as well as surface preparation, priming, painting, and related incidental work. The contractor is responsible for verifying all quantities and field measurements prior to submitting a bid.

Project Objective:

Provide all labor, materials, equipment, and supervision necessary to perform repairs and maintenance at the Hapuna State Recreation Area Campgrounds Pavilion.

The project consists primarily of repair and maintenance work to the existing pavilion. Scope includes demolition and removal of deteriorated exterior siding and screen wall assemblies, installation of a continuous concrete curb at the building perimeter, and in-kind replacement of exterior siding and screen walls to match the existing materials and appearance. The work also encompasses surface preparation, priming, painting, and all incidental items necessary to restore and maintain the integrity of the existing building envelope while preserving its current architectural character.

1. Demolition and Disposal Remove and properly dispose of all existing exterior siding and screen wall assemblies. Protect adjacent construction to remain.

2. Concrete Curb Installation Install a continuous concrete curb along the perimeter wall line. Coordinate curb installation with existing structure to ensure proper drainage and support.

3. Exterior All Replacement Furnish and install new exterior siding to match existing in material, profile, and appearance (in-kind replacement) Furnish and install new screen wall assemblies to match existing configuration and function.

4. Compliance and Site management Compliance: The Contractor shall be responsible for obtaining all permits, licenses, and approvals required for the performance of the work. All permits shall be secured prior to commencement of construction activities.

The Contractor shall comply with all applicable federal, state, and county laws, regulations, and ordinances.

Site Security: Secure the work sites with proper barricades, safety signage, and caution tape to protect personnel and property.

Cleanup and Waste Management: Furnish and stage an appropriately sized dumpster or roll-off container on site. Clean the work site daily.

Repair or replace any damage to adjacent surfaces caused by construction activities.

CONTACTS

Project Coordinator: On-site contact persons during construction:

Renee Kamisugi, State Parks Planner Luisa Castro, State Parks District Superintendent renee.y.kamisugi@hawaii.gov (808) 895-1660

SCOPE OF WORK 2 F75C646H - HAPUNA BEACH SRA

Scope of Work (continued)

All work shall be confined to the existing pavilion and shall be divided between the Base Bid, Additive Alternate No.

1, and Additive Alternate No. 2 as outlined below. The contractor is responsible for verifying all quantities and field measurements prior to submitting a bid.

EXISTING PAVILION FLOOR PLAN

NOT TO SCALE

BASE BID

Portion of North Wall, from Beam-3 to corner of West Wall, Portion of South Wall from Beam-7 to corner of West Wall, and entire West Wall

- Demolition of walls, from concrete slab to underside of existing beam

- Save and reuse existing doors

- Provide cast-in-place concrete curb, 3-1/2” (W) x 5-1/2” (H) along perimeter of existing Pavilion wall line, with an opening at existing weep hole on the West Wall.

- Replace-in-kind screen wall

- Prep, prime, and paint

NORTH WALL

SOUTH WALL

E A

ST

W

A

LL

W

ES

T W

A

LL

ELECTRICAL CLOSET

SHALL REMAIN INTACT

BASE BID ADDITIVE ALT #2ADDITIVE

ALT #1

STATE PARKS TO REMOVE ALL INTERIOR

FURNISHINGS PRIOR TO START OF THE PROJECT

SCOPE OF WORK 3 F75C646H - HAPUNA BEACH SRA

Scope of Work (continued) The contractor is responsible for verifying all quantities and field measurements prior to submitting a bid.

ADDITIVE ALTERNATE NO. 1

Portion of North Wall, from Beam-3 to Beam-4 & Portion of South Wall from Beam-6 to Beam-7

- Demolition of walls, from concrete slab to underside of existing beam

- Provide cast-in-place concrete curb, 3-1/2” (W) x 5-1/2” (H) along perimeter of existing Pavilion wall line

- Replace-in-kind screen wall

- Prep, prime, and paint

ADDITIVE ALTERNATE NO. 2

Portion of North Wall, from Beam-4 to corner of East Wall, & Portion of South Wall from Beam-6 to corner of East Wall, and entire East Wall

- Demolition of walls, from concrete slab to underside of existing beam

- Provide cast-in-place concrete curb, 3-1/2” (W) x 5-1/2” (H) along perimeter of existing Pavilion wall line

- Replace-in-kind screen wall

- Replace-in-kind screen mesh, 1/2” thick, bronze tinted polycarbonate glazing panels, and trim.

- Prep, prime, and paint

GENERAL NOTES:

1. THE CONTRACTOR SHALL OBSERVE AND COMPLY WITH ALL FEDERAL, STATE AND LOCAL LAWS REQUIRED FOR THE

PROTECTION OF PUBLIC HEALTH AND SAFETY AND ENVIRONMENTAL QUALITY.

2. ALL CONSTRUCTION WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST ISSUE AND ITS AMENDMENTS OF THE

BUILDING CODE OF THE COUNTY OF HAWAII.

3. THE BIDDER(S) SHALL VERIFY AND CHECK ALL DIMENSIONS AND DETAILS SHOWN ON THE DRAWINGS PRIOR TO BID

SUBMITTAL. ANY DISCREPANCIES SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE PROJECT MANAGER

FOR CLARIFICATION PRIOR TO BID SUBMITTAL.

4. THE BIDDER(S) SHALL VISIT THE PROJECT SITE PRIOR TO SUBMITTING THE PROPOSAL TO VERIFY THE EXISTING CONDITIONS AND LIMITATIONS UNDER WHICH THE WORK IS TO BE PERFORMED, AND SHALL INCLUDE IN THE PRICE A SUM TO COVER THE COST OF ITEMS NECESSARY TO PERFORM THE WORK AS SET FORTH IN THE PROPOSED CONTRACT DOCUMENTS. NO ALLOWANCE WILL BE MADE TO A BIDDER (EVENTUAL CONTRACTOR OR SUBCONTRACTOR) BECAUSE OF LACK OF SUCH EXAMINATION OR KNOWLEDGE. THE SUBMISSION OF A PROPOSAL WILL BE CONSIDERED AS CONCLUSIVE EVIDENCE THAT THE BIDDER (EVENTUAL CONTRACTOR OR SUBCONTRACTOR)

HAS MADE SUCH EXAMINATION.

5. THE CONTRACTOR SHALL RESTORE TO THEIR ORIGINAL CONDITION ALL ELEMENTS/ITEMS DAMAGED AS A RESULT OF THE CONSTRUCTION, WHETHER OR NOT SHOWN ON THE DRAWINGS, INCLUDING PAVEMENTS, EMBANKMENTS, CURBS, SIGNS, LANDSCAPING, STRUCTURES, UTILITIES, WALLS, FENCES, ALL COMMON AREAS, UNLESS OTHERWISE NOTED. THE COST OF RESTORING DAMAGED IMPROVEMENTS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

6. THE CONTRACTOR TO COORDINATE AND PROVIDE CONSTRUCTION SCHEDULE, CONSTRUCTION / SAFETY BARRICADES, AND DESIGNATED STAGING AREA WITH THE STATE ENGINEER AND SHALL ASSURE.SAFETY OF THE

PUBLIC AT ALL TIMES.

7. THE PARK SHALL REMAIN OPEN DURING THE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL NECESSARY SIGNS, LIGHTS, FLARES, BARRICADES, MARKERS, CONES, AND OTHER PROTECTIVE FACILITIES AND SHALL TAKE NECESSARY PRECAUTIONS FOR THE PROTECTION, CONVENIENCE AND SAFETY OF THE

PUBLIC. ALL TEMPORARY BARRICADES SHALL COMPLY W/ ADMG 201.3 AND 206.1

8. DEBRIS GENERATED FROM THE WORK INDICATED SHALL BE DISPOSED OF "OFF-SITE" BY THE CONTRACTOR.

9. THE CONTRACTOR SHALL REVIEW THE PROJECT FOR ANY LONG LEAD ITEMS AND PROVIDE SPECIAL CONSIDERATIONS

TO AVOID UNNECESSARY DELAYS TO THE COMPLETION OF THE PROJECT.

10. THE CONTRACTOR SHALL NOTIFY THE PROJECT MANAGER IMMEDIATELY UPON ENCOUNTERING ANY HAZARDOUS

MATERIALS DURING THE COURSE OF THE PROJECT. CONTRACTOR IS NOT AUTHORIZED TO HANDLE, TEST, OR REMOVE

SUCH MATERIALS WITHOUT SPECIFIC AUTHORIZATION FROM THE PROJECT MANAGER.

11. FIRE SAFETY STRUCTURES UNDERGOING CONSTRUCTION, ALTERATION OR DEMOLITION OPERATIONS, INCLUDING THOSE IN UNDERGROUND LOCATIONS, SHALL COMPLY WITH NFPA241 - STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATIONS AND DEMOLITION OPERATIONS AND CHAPTER 16.1.1, NFPA 1, 2006 EDITION.

SCOPE OF WORK 4 F75C646H - HAPUNA BEACH SRA

Site Pictures

NORTH WALL

WEST WALL EAST WALL

SOUTH WALL

BASE BIDADD. ALT NO. 2 ADD.

ALT

NO. 1

BASE BID ADDITIVE ALT NO. 2

BASE BID ADD. ALT

NO. 1 ADD. ALT NO. 2

SCOPE OF WORK 5 F75C646H - HAPUNA BEACH SRA

Site Pictures The contractor is responsible for verifying all quantities and field measurements prior to submitting a bid.

Pavilion at Hapuna State Recreation Area Interior/Exterior

- Approx. 1,000 sf paint prep

- Approx. 2,400 sf prime and paint

North Wall South Wall Demo and replace in kind, cast-in-place concrete curb, exterior screen wall from bottom to top plate.

Approx. 4x4 posts (20 LF). 2x4 (88 LF), 1x4 Trim (12 LF), 1x6 Trim (10 LF), 1x2 (129 LF), 3/4” Plywood (34 sf), Stainless Steel Screen mesh (119 sf)

Demo and replace in kind, cast-in-place concrete curb, exterior screen wall from bottom to top plate. Approx. 4x4 posts (20 LF). 2x4 (88 LF), 1x4 Trim (12 LF), 1x6 Trim (10 LF), 1x2 (129 LF), 3/4” Plywood (34 sf), Stainless Steel Screen mesh (119 sf)

West Wall West Wall (Interior Elevation) Demo and replace in kind, cast-in-place concrete curb, exterior screen wall from bottom to top plate.

Approx. 2x4 (194 LF), 1x2 (310 LF), 4x4 (10 LF), 3/4” Plywood (54 sf), Stainless Steel Screen mesh (336 sf)

SCOPE OF WORK 6 F75C646H - HAPUNA BEACH SRA

Site Pictures The contractor is responsible for verifying all quantities and field measurements prior to submitting a bid.

Existing Drain Outlet at West Wall

TYPICAL SECTION - CONCRETE CURB AT EXSTG SLAB-ON-GRADE

NOT TO SCALE

- Surface finish to match existing

- Dowels shall be #3 bars @ 12” OC, epoxy-set into existing slab. Dowels shall be embedded 2” minimum into exstg slab and extend 3” into curb.

- Sawcut exstg slab as required for clean, straight edge. Clean and prep surface prior to installing concrete curb.

- Provide expansion joint at intervals as required

- Where concrete curb abuts existing post, leave 1/4” - 1/2” gap around each post when forming. Fill gap with polyurethane sealant once cured.

- Verify existing slab thickness before drilling downs

- Field verify all dimensions

3-1/2” WIDE x 5-1/2” HIGH CONCRETE CURB w/

#3 CONT. HORIZONTAL BAR, TIE TO DOWELS

#3 DOWELS @ 12” OC, TYP

EPOXY SET INTO EXSTG SLAB

2” MIN EMBEDMENT INTO EXSTG CONCRETE

JOINT SEALER AND FILLER, TYP

EXSTG CONC SLAB

3-1/2”

5-1/2”

SCOPE OF WORK 7 F75C646H - HAPUNA BEACH SRA

Site Pictures The contractor is responsible for verifying all quantities and field measurements prior to submitting a bid.

North Wall (Partial Base Bid & Add. Alt No.1) South Wall (Partial Base Bid & Add. Alt. No.1) Demo and replace in kind, cast-in-place concrete curb, exterior screen wall from bottom to top plate.

Approx. 4x4 posts (20 LF), 2x4 (68 LF), 1x4 Trim (12 LF), 1x2 Trim (103 LF), 3/4” Plywood (30 sf), Stainless Steel Screen mesh (100 sf)

Demo and replace in kind, cast-in-place concrete curb, exterior screen wall from bottom to top plate. Approx. 4x4 posts (20 LF), 2x4 (68 LF), 1x4 Trim (12 LF), 1x2 Trim (103 LF), 3/4” Plywood (30 sf), Stainless Steel Screen mesh (100 sf)

East Wall (Additive Alternate No.2) Replace T1-11 Siding (approx. 260 sf), cast-in-place concrete curb, exterior screen wall from top plate to bottom of rafter.

Replace in kind screen mesh, 1/2” thick, bronze tinted polycarbonate glazing panels, and trim. (Measurements for trim, screen, and polycarbonate glazing shall be verified in field)

North Wall (Additive Alternate No.2) South Wall (Additive Alternate No.2) Demo and replace in kind, cast-in-place concrete curb, replace T1-11 Siding (approx. 170 sf)

Demo and replace in kind, cast-in-place concrete curb, replace T1-11 Siding (approx. 170 sf)

ADDITIVE

ALT. NO. 1 BASE BID ADDITIVE

ALT. NO. 1BASE BID

ADDITIVE ALT. NO. 2

ADDITIVE ALT. NO. 2 ADDITIVE ALT. NO. 2