04 RFP 25RE001 - TE1 Service Delivery Summary (SDS).xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Warrior Care Global Support RFP
Solicitation number
H9240025RE001
Issued by

About this file

This document is a Technical Exhibit (TE-1) Service Delivery Summary (SDS) for the Warrior Care Global Support RFP (Solicitation H9240025RE001) issued by the U.S. Special Operations Command (USSOCOM). The summary outlines five critical performance objectives for a contractor supporting the Warrior Care Program (WCP), which provides non-clinical case management and advocacy services for Special Operations Forces wounded, ill, or injured service members.

The performance objectives cover five key areas: (1) timely and accurate task order deliverables, (2) assistance to Resilient Service Members (RSM) with minimal discrepancies, (3) comprehensive case management processes, (4) training and professional development support, and (5) administrative and outreach support. Each objective includes specific performance standards with maximum allowable deviations and requires a Corrective Action Plan (CAP) if standards are not met. The services extend to families, veterans, caregivers, and significant others, focusing on Recovery Care Coordination, Military Adaptive Sports, Benevolence, and Career Transition for Special Operations Forces personnel.

View the file

Other files

File Type Posted
00A RFP 25R0001 - Section L (r1 20250408).docx DOCX document
05 RFP 25R0001 - TE2 MSR Template (r120250408).docx DOCX document
12 RFP 25R0001 - PPI Rel Base (r1 20250408).XLSX XLSX spreadsheet
00C RFP 25R0001 - SOW (r1 20250408).docx DOCX document
02 DD254 WCGS Tentative Draft.pdf PDF
06 RFP 25R0001 - TE3 PLSQs (r1 20250408).xlsx XLSX spreadsheet
09 RFP 25R0001 - WD List (r1 20250408).xlsx XLSX spreadsheet
10 RFP 25R0001 - Oral Pres WARNO (r1 20250408).docx DOCX document
11 RFP 25R0001 - PPI (r1 20250408).docx DOCX document
13 RFP 25R0001 - Subcont Consent (r1 20250408).docx DOCX document
17 RFP 25R0001 Clause List (r1 20250408).pdf PDF
Solicitation Amendment H9240025RE0010001 SF 30.pdf PDF
Solicitation Amendment - H9240025RE0010001 SF33.pdf PDF
00B RFP 25R0001 - Section M (r1 20250408).docx DOCX document
03 RFP 25R0001 - Price Matrix (r1 20250408).XLSX XLSX spreadsheet
08 RFP 25R0001 - TE5 Hist Met (r1 20250408).xlsx XLSX spreadsheet
14 RFP 25R0001 - Client Auth (r1 20250408).docx DOCX document
19 RFP 25RE001 Consolidated QnA (20250408).pdf PDF
000 H9240025RE001 SF33.pdf PDF
00B RFP 25RE001 - Section M.docx DOCX document
00D RFP 25RE001 Section H.docx DOCX document
03 RFP 25RE001 - Price Matrix.XLSX XLSX spreadsheet
12 RFP 25RE001 - PPI Relevancy Baseline.XLSX XLSX spreadsheet
14 RFP 25RE001 - Client Authorization.docx DOCX document
00C RFP 25RE001 - SOW.docx DOCX document
05 RFP 25RE001 - TE2 MSR Template.docx DOCX document
11 RFP 25RE001 - PPI.docx DOCX document
15 RFP 25RE001 - QnA Template.docx DOCX document
09 RFP 25RE001 - WD List.xlsx XLSX spreadsheet
10 RFP 25RE001 - Oral Presentation WARNO.docx DOCX document
18 RFP 25RE001 SOFARS Clauses.docx DOCX document
13 RFP 25RE001 - Subcontractor Consent.docx DOCX document
00A RFP 25RE001 - Section L.docx DOCX document
06 RFP 25RE001 - TE3 Perform Locs Skills Quals.xlsx XLSX spreadsheet
07 RFP 25RE001 - TE4 Travel Authorization.docx DOCX document
08 RFP 25RE001 - TE5 Historical Metrics.xlsx XLSX spreadsheet
16 RFP 25RE001 - Resume Template.docx DOCX document
17 RFP 25RE001 Clause List.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE-1-SDS

Technical Exhibit (TE) 1 - SERVICE DELIVERY SUMMARY
The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
PRS #Performance ObjectivesPerformance StandardsMax Allowable Deviation (AQL) for RequirementRemedy
1The contractor shall provide accurate task order deliverables in a timely manner.SOW Sections: 3.0, 4.0, and 5.0Timeliness: No more than 2 deliverable late per month, per region for maximum of 8 deficiencies.
Accuracy: No more than 1 deliverable rejected by the Government per month.Contractor shall provide a Corrective Action Plan (CAP) to the KO and COR.
2The contractor shall assist RSM and their support system, achieves desire outcomes with minimal discrepancies and no incidents or lapse of care in a manner in keeping with WCP program goals. (General Approach)
SOW sections:
3.0 and 4.0Timeliness: No more than one substantiated complaint per quarter.
Accuracy: No more than 1% non- compliance for key process indicators for all RSM cases when measured monthly.Contractor shall provide a Corrective Action Plan (CAP) to the KO and COR.
3The contractor shall provide timely, accurate and effective screening, assessment, planning, implementation, coordination, monitoring, evaluation, closure and documentation. (Non-clinical Case Management)SOW section:

3.0 and 4.0 Timeliness:

* No more than 10% deviation for completing screenings for all RSMs within 72 hours calculated monthly.

* Three days is the maximum lapse allowed for LCMP contact frequency.

* 60 minutes is the maximum deviation allowed for submitting a timely critical incident report.

Complete and accurate: No more than 2 incomplete and/or inaccurate entries in the SOCS-WCP Casualty Tracker per month per region for a maximum of 8 defective entries.

Effective: No more than 2 substantiated negative feedback comments per month per region determined by compliance to the SOCS-WCP SOP.Contractor shall provide a Corrective Action Plan (CAP) to the KO and COR.
4The contractor shall provide timely and effective training support. (Training and professional development)
SOW sections:

3.3 and MSR Timely:

* No deviations allowed for New Hire Orientation.

* No deviations for monthly training sessions.

Effective: The recommendations derived from the training assessments are substantiated and include key learning objectives.

Accurate: There are no errors on the training documents uploaded on the SOCS-WCP website/SharePoint.Contractor shall provide a Corrective Action Plan (CAP) to the KO and COR.
5The contractor shall provide timely and effective administrative and outreach support that includes population surveys to measure RSM’s satisfaction and community outreach to identify potential RSMs. (Administrative and Outreach Support)SOW section:

3.4 Client Satisfaction: After measuring a minimum of 25% of the SOCS-WCP population quarterly.

Timeliness:

* When combined no more than 8 itineraries and ARRs are late per month.

* No more than one missed deadline per quarter for all documents.

* No more than one substantiated complaint per quarter resulting from outreach.

Contractor shall provide a Corrective Action Plan (CAP) to the KO and COR

&"-,Bold"&KFF0000RFI DRAFT

TE 1

Page &P of &N

File details come from the government source that posted it. Updated .