Architect And Engineering- Construction: Other Educational Buildings

Code C1CZ
Child
Spend Category Level 1
Facilities & Construction
Spend Category Level 2
Construction Related Services
Popular Federal Contract Opportunities
Not listed
Popular Federal Contract Awards
Not listed

The PSC Category C1CZ covers Architect and Engineering services for construction of other educational buildings. These services encompass comprehensive architectural design, engineering planning, pre-design assessment, construction management, and renovation services for educational facilities across various federal agencies. The scope includes designing, renovating, and improving educational infrastructure ranging from military training centers to medical training facilities and campus buildings.

Federal Contract Awards in this category predominantly feature firm fixed-price delivery orders with values ranging from approximately $15,000 to $4.8 million. Key funding agencies include the U.S. Army Corps of Engineers, Department of Veterans Affairs, Navy Installations Command, and Air Force commands. Awards frequently involve military and federal training facilities, with performance locations spanning domestic military bases and international installations like those in Japan and Germany. Most contracts are not set aside, though some leverage small business programs like 8(a), Service-Disabled Veteran-Owned Small Business, and HUBZone certifications. Recurring contractors include joint ventures and engineering firms such as Burns & McDonnell, Westeast Design Group, and Jacobs/Ewingcole.

The sole federal contract opportunity posted under this PSC category involves a renovation project by the Department of the Army Materiel Command to convert Building 52 at a United States Army Garrison in Poland into an Army Education Center. The project will transform an entire building floor, including classrooms, administrative spaces, and testing areas, with work encompassing interior and exterior painting, flooring replacement, HVAC system reconfiguration, electrical infrastructure updates, and door replacements. The renovation is expected to be completed within 270 days and is being competed on an unrestricted basis with no specific small business set-aside.

Generated 1/19/25, 1:15 AM