Renovation of Rodriguez CDC, Fort Bragg NC

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912HN20B4004
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Fort Bragg Nc Usa

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks to renovate the Rodriguez Child Development Center at Fort Bragg, North Carolina. The U.S. Army Corps of Engineers Savannah District is procuring renovation services for the 20,833 square foot building including demolition, roof and exterior wall repairs, new interior partitions and finishes, and upgraded mechanical and civil systems. Bids will be evaluated based on technical qualifications, past performance, and price, with award as a firm-fixed-price contract. The deadline for submissions is October 30, 2020.

The contract action has been set aside only for small businesses. The primary NAICS code is 238210 and PSC code S206. The independent cost estimate was $7.17 million. Eight contractors submitted bids ranging from $6.3 to $9.3 million by the deadline. The apparent low bid was $6.3 million. All work must be completed within 365 calendar days of award at the Fort Bragg installation in North Carolina.

Notice text

10 versions

Update #10 · Latest ·

Amendment 0014 - Inclusion of provision, 52.204-24 and clauses 52.204-25, 52.229-2 and 52.229-4. Sheets E-501, E-502, E-504 and E-604 with Revision 1 dated 29 July 2020 are hereby added to and made a part of the Contract Drawings. Amendment includes the addition of a Casework sample drawing. This drawing is For Information Only

Amendment 0013 - Extend the bid due date from 26 August 2020 to 30 October 2020 at 2:00 PM and the bid opening date from 26 August 2020 to  30 October 2020 at 3:00 PM.

Amendent 0012-Extend the bid due date from August 11, 2020 to 26th August 2020 at 2:00 PM and the bid opening date from  August 11, 2020 to 26th August 2020 at 3:00 PM.  Replace Section 26 51 00 and added Sheet E-604 with Revision 1.

Amendment 0011-Doesnt exist due to system issues.

Amendment 0010-Doesnt exist due to system issues.

Amendment 0009-Extend the bid due date from July 28, 2020 to August 11, 2020 at 2:00 PM and the bid opening date from July 28, 2020 to August 11, 2020 at 3:00 PM.

Amendment 0008-To change the Bid Opening time from 2:00 p.m., 28th July 2020 to 3:00 p.m., 28th July 2020. The due date time of 2:00 p.m., 28th July 2020 for bids to be received has not changed.

Amendment 0007-Extend the sealed bid due date from July 14, 2020 to July 28, 2002 at 2pm, add SAM registration info, update when ProjNet will close and added Sheet A-503 with revision 1 dated 10 July 2020. 

Amendment 0006-Doesnt exist due to system issues.

Amendment 0005-Doesn't exist due to system issues.

Amendment 0004-Extend the sealed bid due date from 30 June, 2020 to July 14, 2020 at 2pm.

Amendment 0003-Doesnt exist due to system issues.

Amendment 0002-To add bid bond information.

Amendment 0001- To attach Site Visit sign in sheet and extend the bid opening by 2 weeks.

Project objective is to renovate Rodriguez CDC, Building B-7033 at Ft Bragg. The renovation consists of demolition of existing grass surface. The new work consists of sediment and erosion control measures, and grading and modifications to the existing storm drain runoff as shown on the drawings.

Also, the civil work includes the addition of concrete aprons, curbing, parking patching as indicated on the drawings. The Structural and architectural work consists of a repair to a 20,833 square foot, slab on grade building. Demolition to consist of removing some exterior doors and windows, most of the interior floor slab, all interior partitions, and all ceilings. The repair to the roof will include patching the existing roof deck from the removal of HVAC equipment, a new modified bituminous cold applied roof on the low slope portion, and a new metal roof on the sloped portion. The repair to the exterior to consist of the infill of door/windows installation of new doors/windows, and new exterior wall partitions. The repair to the interior of the building will include all new partitions per the new CDC layout, all new interior finishes, and new restrooms as indicated on the drawings. Other spaces included are a mechanical room, communications room, video room, storage rooms, and an electrical room.

Update #9 ·

Amendment 0013 - Extend the bid due date from 26 August 2020 to 30 October 2020 at 2:00 PM and the bid opening date from 26 August 2020 to  30 October 2020 at 3:00 PM.

Amendent 0012-Extend the bid due date from August 11, 2020 to 26th August 2020 at 2:00 PM and the bid opening date from  August 11, 2020 to 26th August 2020 at 3:00 PM.  Replace Section 26 51 00 and added Sheet E-604 with Revision 1.

Amendment 0011-Doesnt exist due to system issues.

Amendment 0010-Doesnt exist due to system issues.

Amendment 0009-Extend the bid due date from July 28, 2020 to August 11, 2020 at 2:00 PM and the bid opening date from July 28, 2020 to August 11, 2020 at 3:00 PM.

Amendment 0008-To change the Bid Opening time from 2:00 p.m., 28th July 2020 to 3:00 p.m., 28th July 2020. The due date time of 2:00 p.m., 28th July 2020 for bids to be received has not changed.

Amendment 0007-Extend the sealed bid due date from July 14, 2020 to July 28, 2002 at 2pm, add SAM registration info, update when ProjNet will close and added Sheet A-503 with revision 1 dated 10 July 2020. 

Amendment 0006-Doesnt exist due to system issues.

Amendment 0005-Doesn't exist due to system issues.

Amendment 0004-Extend the sealed bid due date from 30 June, 2020 to July 14, 2020 at 2pm.

Amendment 0003-Doesnt exist due to system issues.

Amendment 0002-To add bid bond information.

Amendment 0001- To attach Site Visit sign in sheet and extend the bid opening by 2 weeks.

Project objective is to renovate Rodriguez CDC, Building B-7033 at Ft Bragg. The renovation consists of demolition of existing grass surface. The new work consists of sediment and erosion control measures, and grading and modifications to the existing storm drain runoff as shown on the drawings.

Also, the civil work includes the addition of concrete aprons, curbing, parking patching as indicated on the drawings. The Structural and architectural work consists of a repair to a 20,833 square foot, slab on grade building. Demolition to consist of removing some exterior doors and windows, most of the interior floor slab, all interior partitions, and all ceilings. The repair to the roof will include patching the existing roof deck from the removal of HVAC equipment, a new modified bituminous cold applied roof on the low slope portion, and a new metal roof on the sloped portion. The repair to the exterior to consist of the infill of door/windows installation of new doors/windows, and new exterior wall partitions. The repair to the interior of the building will include all new partitions per the new CDC layout, all new interior finishes, and new restrooms as indicated on the drawings. Other spaces included are a mechanical room, communications room, video room, storage rooms, and an electrical room.

Update #8 ·

Amendent 0012-Extend the bid due date from August 11, 2020 to 26th August 2020 at 2:00 PM and the bid opening date from  August 11, 2020 to 26th August 2020 at 3:00 PM.  Replace Section 26 51 00 and added Sheet E-604 with Revision 1.

Amendment 0011-Doesnt exist due to system issues.

Amendment 0010-Doesnt exist due to system issues.

Amendment 0009-Extend the bid due date from July 28, 2020 to August 11, 2020 at 2:00 PM and the bid opening date from July 28, 2020 to August 11, 2020 at 3:00 PM.

Amendment 0008-To change the Bid Opening time from 2:00 p.m., 28th July 2020 to 3:00 p.m., 28th July 2020. The due date time of 2:00 p.m., 28th July 2020 for bids to be received has not changed.

Amendment 0007-Extend the sealed bid due date from July 14, 2020 to July 28, 2002 at 2pm, add SAM registration info, update when ProjNet will close and added Sheet A-503 with revision 1 dated 10 July 2020. 

Amendment 0006-Doesnt exist due to system issues.

Amendment 0005-Doesn't exist due to system issues.

Amendment 0004-Extend the sealed bid due date from 30 June, 2020 to July 14, 2020 at 2pm.

Amendment 0003-Doesnt exist due to system issues.

Amendment 0002-To add bid bond information.

Amendment 0001- To attach Site Visit sign in sheet and extend the bid opening by 2 weeks.

Project objective is to renovate Rodriguez CDC, Building B-7033 at Ft Bragg. The renovation consists of demolition of existing grass surface. The new work consists of sediment and erosion control measures, and grading and modifications to the existing storm drain runoff as shown on the drawings.

Also, the civil work includes the addition of concrete aprons, curbing, parking patching as indicated on the drawings. The Structural and architectural work consists of a repair to a 20,833 square foot, slab on grade building. Demolition to consist of removing some exterior doors and windows, most of the interior floor slab, all interior partitions, and all ceilings. The repair to the roof will include patching the existing roof deck from the removal of HVAC equipment, a new modified bituminous cold applied roof on the low slope portion, and a new metal roof on the sloped portion. The repair to the exterior to consist of the infill of door/windows installation of new doors/windows, and new exterior wall partitions. The repair to the interior of the building will include all new partitions per the new CDC layout, all new interior finishes, and new restrooms as indicated on the drawings. Other spaces included are a mechanical room, communications room, video room, storage rooms, and an electrical room.

Update #7 ·

Amendment 0009-Extend the bid due date from July 28, 2020 to August 11, 2020 at 2:00 PM and the bid opening date from July 28, 2020 to August 11, 2020 at 3:00 PM.

Amendment 0008-To change the Bid Opening time from 2:00 p.m., 28th July 2020 to 3:00 p.m., 28th July 2020. The due date time of 2:00 p.m., 28th July 2020 for bids to be received has not changed.

Amendment 0007-Extend the sealed bid due date from July 14, 2020 to July 28, 2002 at 2pm, add SAM registration info, update when ProjNet will close and added Sheet A-503 with revision 1 dated 10 July 2020. 

Amendment 0006-Doesnt exist due to system issues.

Amendment 0005-Doesn't exist due to system issues.

Amendment 0004-Extend the sealed bid due date from 30 June, 2020 to July 14, 2020 at 2pm.

Amendment 0003-Doesnt exist due to system issues.

Amendment 0002-To add bid bond information.

Amendment 0001- To attach Site Visit sign in sheet and extend the bid opening by 2 weeks.

Project objective is to renovate Rodriguez CDC, Building B-7033 at Ft Bragg. The renovation consists of demolition of existing grass surface. The new work consists of sediment and erosion control measures, and grading and modifications to the existing storm drain runoff as shown on the drawings.

Also, the civil work includes the addition of concrete aprons, curbing, parking patching as indicated on the drawings. The Structural and architectural work consists of a repair to a 20,833 square foot, slab on grade building. Demolition to consist of removing some exterior doors and windows, most of the interior floor slab, all interior partitions, and all ceilings. The repair to the roof will include patching the existing roof deck from the removal of HVAC equipment, a new modified bituminous cold applied roof on the low slope portion, and a new metal roof on the sloped portion. The repair to the exterior to consist of the infill of door/windows installation of new doors/windows, and new exterior wall partitions. The repair to the interior of the building will include all new partitions per the new CDC layout, all new interior finishes, and new restrooms as indicated on the drawings. Other spaces included are a mechanical room, communications room, video room, storage rooms, and an electrical room.

Update #6 ·

Amendment 0008-To change the Bid Opening time from 2:00 p.m., 28th July 2020 to 3:00 p.m., 28th July 2020. The due date time of 2:00 p.m., 28th July 2020 for bids to be received has not changed.

Amendment 0007-Extend the sealed bid due date from July 14, 2020 to July 28, 2002 at 2pm, add SAM registration info, update when ProjNet will close and added Sheet A-503 with revision 1 dated 10 July 2020. 

Amendment 0006-Doesnt exist due to system issues.

Amendment 0005-Doesn't exist due to system issues.

Amendment 0004-Extend the sealed bid due date from 30 June, 2020 to July 14, 2020 at 2pm.

Amendment 0003-Doesnt exist due to system issues.

Amendment 0002-To add bid bond information.

Amendment 0001- To attach Site Visit sign in sheet and extend the bid opening by 2 weeks.

Project objective is to renovate Rodriguez CDC, Building B-7033 at Ft Bragg. The renovation consists of demolition of existing grass surface. The new work consists of sediment and erosion control measures, and grading and modifications to the existing storm drain runoff as shown on the drawings.

Also, the civil work includes the addition of concrete aprons, curbing, parking patching as indicated on the drawings. The Structural and architectural work consists of a repair to a 20,833 square foot, slab on grade building. Demolition to consist of removing some exterior doors and windows, most of the interior floor slab, all interior partitions, and all ceilings. The repair to the roof will include patching the existing roof deck from the removal of HVAC equipment, a new modified bituminous cold applied roof on the low slope portion, and a new metal roof on the sloped portion. The repair to the exterior to consist of the infill of door/windows installation of new doors/windows, and new exterior wall partitions. The repair to the interior of the building will include all new partitions per the new CDC layout, all new interior finishes, and new restrooms as indicated on the drawings. Other spaces included are a mechanical room, communications room, video room, storage rooms, and an electrical room.

Update #5 ·

Amendment 0007-Extend the sealed bid due date from July 14, 2020 to July 28, 2002 at 2pm, add SAM registration info, update when ProjNet will close and added Sheet A-503 with revision 1 dated 10 July 2020. 

Amendment 0006-Doesnt exist due to system issues.

Amendment 0005-Doesn't exist due to system issues.

Amendment 0004-Extend the sealed bid due date from 30 June, 2020 to July 14, 2020 at 2pm.

Amendment 0003-Doesnt exist due to system issues.

Amendment 0002-To add bid bond information.

Amendment 0001- To attach Site Visit sign in sheet and extend the bid opening by 2 weeks.

Project objective is to renovate Rodriguez CDC, Building B-7033 at Ft Bragg. The renovation consists of demolition of existing grass surface. The new work consists of sediment and erosion control measures, and grading and modifications to the existing storm drain runoff as shown on the drawings.

Also, the civil work includes the addition of concrete aprons, curbing, parking patching as indicated on the drawings. The Structural and architectural work consists of a repair to a 20,833 square foot, slab on grade building. Demolition to consist of removing some exterior doors and windows, most of the interior floor slab, all interior partitions, and all ceilings. The repair to the roof will include patching the existing roof deck from the removal of HVAC equipment, a new modified bituminous cold applied roof on the low slope portion, and a new metal roof on the sloped portion. The repair to the exterior to consist of the infill of door/windows installation of new doors/windows, and new exterior wall partitions. The repair to the interior of the building will include all new partitions per the new CDC layout, all new interior finishes, and new restrooms as indicated on the drawings. Other spaces included are a mechanical room, communications room, video room, storage rooms, and an electrical room.

Update #4 ·

Amendment 0004-Extend the sealed bid due date from 30 June, 2020 to July 14, 2020 at 2pm.

Amendment 0003-Doesnt exist due to system issues

Amendment 0002-To add bid bond information.

Amendment 0001- To attach Site Visit sign in sheet and extend the bid opening by 2 weeks.

Project objective is to renovate Rodriguez CDC, Building B-7033 at Ft Bragg. The renovation consists of demolition of existing grass surface. The new work consists of sediment and erosion control measures, and grading and modifications to the existing storm drain runoff as shown on the drawings.

Also, the civil work includes the addition of concrete aprons, curbing, parking patching as indicated on the drawings. The Structural and architectural work consists of a repair to a 20,833 square foot, slab on grade building. Demolition to consist of removing some exterior doors and windows, most of the interior floor slab, all interior partitions, and all ceilings. The repair to the roof will include patching the existing roof deck from the removal of HVAC equipment, a new modified bituminous cold applied roof on the low slope portion, and a new metal roof on the sloped portion. The repair to the exterior to consist of the infill of door/windows installation of new doors/windows, and new exterior wall partitions. The repair to the interior of the building will include all new partitions per the new CDC layout, all new interior finishes, and new restrooms as indicated on the drawings. Other spaces included are a mechanical room, communications room, video room, storage rooms, and an electrical room.

Update #3 ·

Amendment 0002-To add bid bond information.

Amendment 0001- To attach Site Visit sign in sheet and extend the bid opening by 2 weeks.

Project objective is to renovate Rodriguez CDC, Building B-7033 at Ft Bragg. The renovation consists of demolition of existing grass surface. The new work consists of sediment and erosion control measures, and grading and modifications to the existing storm drain runoff as shown on the drawings.

Also, the civil work includes the addition of concrete aprons, curbing, parking patching as indicated on the drawings. The Structural and architectural work consists of a repair to a 20,833 square foot, slab on grade building. Demolition to consist of removing some exterior doors and windows, most of the interior floor slab, all interior partitions, and all ceilings. The repair to the roof will include patching the existing roof deck from the removal of HVAC equipment, a new modified bituminous cold applied roof on the low slope portion, and a new metal roof on the sloped portion. The repair to the exterior to consist of the infill of door/windows installation of new doors/windows, and new exterior wall partitions. The repair to the interior of the building will include all new partitions per the new CDC layout, all new interior finishes, and new restrooms as indicated on the drawings. Other spaces included are a mechanical room, communications room, video room, storage rooms, and an electrical room.

Update #2 ·

Amendment 0001- To attach Site Visit sign in sheet and extend the bid opening by 2 weeks.

Project objective is to renovate Rodriguez CDC, Building B-7033 at Ft Bragg. The renovation consists of demolition of existing grass surface. The new work consists of sediment and erosion control measures, and grading and modifications to the existing storm drain runoff as shown on the drawings.

Also, the civil work includes the addition of concrete aprons, curbing, parking patching as indicated on the drawings. The Structural and architectural work consists of a repair to a 20,833 square foot, slab on grade building. Demolition to consist of removing some exterior doors and windows, most of the interior floor slab, all interior partitions, and all ceilings. The repair to the roof will include patching the existing roof deck from the removal of HVAC equipment, a new modified bituminous cold applied roof on the low slope portion, and a new metal roof on the sloped portion. The repair to the exterior to consist of the infill of door/windows installation of new doors/windows, and new exterior wall partitions. The repair to the interior of the building will include all new partitions per the new CDC layout, all new interior finishes, and new restrooms as indicated on the drawings. Other spaces included are a mechanical room, communications room, video room, storage rooms, and an electrical room.

Update #1 ·

Project objective is to renovate Rodriguez CDC, Building B-7033 at Ft Bragg. The renovation consists of demolition of existing grass surface. The new work consists of sediment and erosion control measures, and grading and modifications to the existing storm drain runoff as shown on the drawings.

Also, the civil work includes the addition of concrete aprons, curbing, parking patching as indicated on the drawings. The Structural and architectural work consists of a repair to a 20,833 square foot, slab on grade building. Demolition to consist of removing some exterior doors and windows, most of the interior floor slab, all interior partitions, and all ceilings. The repair to the roof will include patching the existing roof deck from the removal of HVAC equipment, a new modified bituminous cold applied roof on the low slope portion, and a new metal roof on the sloped portion. The repair to the exterior to consist of the infill of door/windows installation of new doors/windows, and new exterior wall partitions. The repair to the interior of the building will include all new partitions per the new CDC layout, all new interior finishes, and new restrooms as indicated on the drawings. Other spaces included are a mechanical room, communications room, video room, storage rooms, and an electrical room.

Files

Show all 19

Notice history

Notice Type Posted
Renovation of Rodriguez CDC, Fort Bragg NC Award Award Notice
This notice Latest solicitation Solicitation
Renovation of Rodriguez CDC, Fort Bragg NC Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
PN 110205 - SOS Hangar Renovation - Progressive-Design-Build OT Pope Army Airfield, Fort Bragg, Cumberland County, North Carolina · NAICS 236220 ENDIST Wilmington No set-aside
Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX Bldg. 56767 Equipment Concentration Site (ECS) #6428th St. and Park Ave.North Fort Hood, TX Gatesville, Texas 76528, United States · NAICS 236220 ENDIST Louisville Total Small Business
Child Development Center (CDC), Tinker Air Force Base, Oklahoma NAICS 236220 ENDIST Tulsa No set-aside
USAG Pressure Washing Fort Bragg, North Carolina 28310, United States · NAICS 561790 Mission and Installation Contracting Command HUBZone

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors