Water Treatment Plant No. 2 GST No. 1 Construction

Closed State & local contract opportunity

Solicitation number
ITB# ENG/250425
State
Florida
Responses due

Opportunity facts

Jurisdictions
UNSPSC codes
Show all 22
Point of contact

Updated .

About this opportunity

The City of Ocala, Florida, has issued Invitation to Bid (ITB# ENG/250425) for the construction of a Three Million Gallon (3MG) Ground Storage Tank at Water Treatment Plant #2, located at 3744 S Pine Avenue in Ocala. The project requires a licensed Florida General Contractor with a minimum of five years of experience in water ground storage tank construction to provide comprehensive services, including all materials, labor, and equipment necessary to complete the tank construction as detailed in the project exhibits. A non-mandatory pre-bid meeting was held on March 20, 2025, at 10:00 AM EST, with bids to be received on a lump sum basis and contractors required to bid on all line items. The evaluation criteria include meeting all project requirements, with the contract to be awarded to the lowest responsive bidder. A 5% bid bond is required, and bidders must honor their pricing for 90 days after award. The project has a total timeline of 365 calendar days from the Notice to Proceed, with substantial completion expected within that period and final completion within 30 days thereafter.

The solicitation does not specify any specific set-aside designations or restrictions for disadvantaged enterprises. The project is funded in part by a cost-share agreement with the St. Johns River Water Management District, which provides approximately 50% of the total estimated construction cost of $4,411,400 through the Florida Springs Grant Program. No incumbent vendors are explicitly mentioned in the documentation. The project involves constructing a prestressed concrete tank with specific technical requirements, including detailed specifications for materials, construction methods, and quality control. Contractors will be required to provide comprehensive warranties, including a three-year warranty on all materials and workmanship, covering defects in design and installation. The project also includes provisions for on-site construction power, sanitary facilities, and compliance with safety and regulatory requirements, with the City reserving the right to offset contractor payments against any delinquent amounts or fees owed.

Opportunity text

ITB# ENG/250425 Water Treatment Plant No. 2 GST No. 1 Construction Pre-Bid Meeting Exists (Physical Attendance): Updated Mandatory: No. Date: 3/20/2025 10:00:00 AM EST. Location Name: Water Treatment Plant #2, 3744 S Pine Avenue, Ocala, FL, 34471 Scope of Work: BACKGROUND 1. The City of Ocala requires the services of an experienced Contractor to provide concrete water tank construction services supporting the Water Resources & Engineering department. This project consists of the construction of a Three Million Gallon (3MG) Ground Storage Tank at Water Treatment Plant #2 located in 3744 S Pine Ave, Ocala FL. Construction scope and limits are as shown on the plan sets in Exhibit B - Plan Set and Exhibit C - Electrical Plan. 2. Contractor is responsible for providing all materials, labor, and equipment (in good working condition) to complete all aspects of construction detailed in the exhibits. 3. NON-MANDATORY PRE-BID MEETING: Refer to the listing for the pre-bid meeting date, time, and location. EXPERIENCE AND LICENSING REQUIREMENTS 1. Licensing Requirement: The Bidder must be licensed as a General Contractor in the State of Florida to submit a bid for this project. 2. Experience Requirement: The Bidder must be licensed as a General Contractor in the State of Florida. The Water Tank Contractor must possess five (5) years of experience in providing Water Ground Storage Tanks building services. 3. The Contractor and all subcontractors will be required to conform to the labor standards and employment requirements set forth in the Bid Documents. All work shall be performed under the supervision of a qualified, competent foreman or supervisor. 4. Locate, protect, and relocate any and all underground utilities necessary to complete the work specified in the Contract, and verify all field conditions, measurements, and elevations. 5. If work to be done has no line-item unit price in the Contract, a written proposal of the work must be agreed upon prior to the work being started. 6. The Contractor, at Contractor`s expense, must obtain any commercial licenses the Contractor needs, i.e., a county occupational license or transportation permits required by the Department of Transportation. 7. If, in the opinion of the City's Engineer or their representative, the Contractor`s equipment is not capable of satisfactorily performing the work provided for in these specifications, the Contractor shall substitute equipment subject to City approval. 8. All materials supplied under this Statement of Work shall be warranted for a period of three (3) years by the Contractor and material manufacturer. The manufacturer`s warranty period shall run concurrently with the Contractor`s warranty period. The warranty period shall commence on the date of the final acceptance of the work and upon payment of same. The materials and work performed shall be warranted to be free from defects in workmanship and design. Any materials or work that fail during the warranty period shall be replaced and restored to service at no expense to the City. 9. Contractor will supply any and all materials, mobilization, surveying, labor and equipment needed to complete the project as described in Exhibit B - Plan Set and Exhibit C - Electrical Plan. 10. Contractor will supply Provide on-site construction power and wiring, as needed. Provide on-site sanitary facilities as required by Governing agencies. The Contractor will not be permitted to use the City sanitary facilities during construction. Posting of OSHA required notices and establishing of safety programs and procedures. 11. Contractor responsible for reviewing, acknowledging, and pricing accordingly in bid "ALL NOTES TO CONTRACTOR" on Exhibit B - Plan Set and Exhibit C - Electrical Plan. PRICING AND AWARD 1. Bids will be received on a lump sum basis. 2. Bidder must bid on all Lump sum items. 3. Award will be made to the lowest bidder meeting all requirements outlined herein. 4. Bidder will honor prices for ninety (90) days after award of solicitation. 5. AMOUNTS DUE TO THE CITY. Contractor/Vendor must be current and remain current in all obligations due to the City during the performance of services under the Agreement. Payments to Contractor/Vendor may be offset by any delinquent amounts due to the City or fees and/or charges owed to the City. The requirements for this listing are outlined in the exhibits. Bid Bond: 5%

Files

File Type Posted
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_NEW_3.25.25_Exhibit_K_-_33_16_00_-_3.0_MG_Prestressed_Concrete_Tank.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_Addendum_2.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_NEW_3.25.25_Exhibit_I_-_Geotechnical_Investigation_Report-_Ocala_WTP_2.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_NEW_3.25.25_Exhibit_J_-_Confirmation_of_Geotechnical_Recommendation_-_Ocala_WTP_2.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_SIGN-IN_SHEET.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_NEW_Exhibit_G_-_Plan_Set__2.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_REV_3.14.25_Exhibit_F_-_Price_Proposal_Rev1.xlsx XLSX spreadsheet
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_NEW_Exhibit_H_-_Electrical_Plan__2.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_Addendum_1.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_Exhibit_A_-_Scope_of_Work.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_Exhibit_B_Plan_Set.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_Exhibit_D_-_Grant_Clauses.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_Exhibit_F_-_Price_Proposal.xlsx XLSX spreadsheet
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_Exhibit_E_-_Executed_Grant.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_Exhibit_C_Electrical_Plan.pdf PDF
Show all 15

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity