The provided file is a comprehensive plan set for the City of Ocala's Water Treatment Plant No. 2 Ground Storage Tank No. 1 (GST No. 1) Construction project located in Ocala, Florida. The project involves constructing a 3-million-gallon ground storage tank at the Water Treatment Plant #2, with associated civil, architectural, structural, mechanical, electrical, and instrumentation plans. The project is advertised under Invitation to Bid (ITB) #ENG/250425, with a non-mandatory pre-bid meeting scheduled for March 20, 2025, at 10:00 AM EST at the water treatment plant site. The plan set includes detailed drawings covering site plans, yard piping, tank details, erosion control, tree preservation, and various technical specifications across multiple disciplines.
The bid requires a licensed Florida General Contractor with at least five years of experience in water ground storage tank construction. The contractor will be responsible for providing all materials, labor, and equipment to complete the project as detailed in the exhibits. The bid will be awarded on a lump sum basis to the lowest responsive bidder, with a 5% bid bond requirement. The contractor must warrant all materials and work for three years from the date of final acceptance, covering defects in workmanship and design. The project includes provisions for on-site construction power, sanitary facilities, and compliance with all relevant safety and regulatory requirements. The contractor will be responsible for utility protection, site preparation, tank construction, and associated infrastructure improvements.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT VICINITY MAP
SHEET NUMBER
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
KH
A
PR
O
JE
C
T
LI
C
EN
SE
D
P R
O
FE
SS
IO
N
AL
D
AT
E:
LI
C
EN
SE
N U
M
BE
R
D
AT
E
SC
AL
E:
A
S
SH
O W
N
K
IM
LE
Y-
HO
RN
A
ND
A
SS
OC
IA
TE
S, IN
C.
W W
W .K
IM
LE
Y-
HO
RN
.C
OM
RE
GI
ST
RY
N
.. 3
PR
EP
AR
ED
F O
R
A u to d e sk
D o c s:
O c a la
W T P O c a la
W T P
(P ro c e ss
S h e e ts rv t
A u to d e sk
D o c s:
O c a la
W T P O c a la
W T P
(P ro c e ss
S h e e ts rv t
FE
BR
U
AR
Y
C
IT
Y O
F O
C
AL
A, F
LO
R
ID
A
O C
AL
A
W
AT
ER
TR
EA
TM
EN
T
PL
AN
T
SA
VA
N N
AH
R
AE
M
ID
D
LE
TO
N
SM
IT
H
, P .E
FL
BID SET
S E
TH
S
TR
EE
T, S
UI
TE
, O
CA
LA
, F L
PH
O
NE
: 3
-4
-3
G01
SR
M
S
R
LL
LL
/A
G
C O
VE
R
P
AG
E
OCALA WATER
TREATMENT PLANT 2
FEBRUARY 2025
CITY OF OCALA, FLORIDA
FINISHED WATER GST NO. 1
CONSTRUCTION PLANS FOR
SECTIONS 32 & 33, TOWNSHIP 15 SOUTH, RANGE 22 EAST
NORTH
PROJECT OWNER AND CONSULTANTS
UTILITY CONTACT LISTING
GOVERNING STANDARDS AND SPECIFICATIONS:
CITY OF OCALA STANDARD SPECIFICATIONS AND DETAILS LATEST EDITION,
FLORIDA DEPARTMENT OF TRANSPORTATION DESIGN STANDARDS, LATEST
EDITION, AND FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD
SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, LATEST EDITION.
OWNER:
CITY OF OCALA
PETER LEE, CITY MANAGER
110 SE WATULA AVENUE
OCALA, FL 34471
PHONE: 352-629-8401
SURVEYOR:
TRAVIS P. BARRINEAU, PSM
R.M. BARRINEAU AND ASSOCIATES
1309 S.E. 25TH LOOP, SUITE #103
OCALA, FL 34471
PHONE: 352-622-3133
ELECTRIC:
OCALA ELECTRIC UTILITY
PHONE: 352-629-2489
WATER:
OCALA WATER RESOURCES
PHONE: 352-351-6772
Know what's before you dig.
below.
Call
CALL 2 WORKING DAYS
BEFORE YOU DIG
IT'S THE LAW!
DIAL 811
SUNSHINE STATE ONE CALL OF FLORIDA, INC.
US 27/US 301
N o.
R ev is io ns B y D at e
GEOTECHNICAL ENGINEERING CONSULTANT:
ANDREYEV ENGINEERING, INC.
4055 ST. JOHNS PARKWAY
SANFORD, FLORIDA 32771
PHONE: 407-330-7763
ARCHITECT:
ARCHITECTURE STUDIO, INC.
1823 E. FORT KING STREET, SUITE 102
OCALA, FLORIDA 34471
PHONE: 352-620-0944
ELECTRICAL ENGINEERING CONSULTANT:
BAILEY ENGINEERING CONSULTANTS, INC.
10620 GRIFFIN ROAD, SUITE 202
COOPER CITY, FLORIDA 33328
PHONE: 954-448-7930
CITY ENGINEERING CONSULTANT:
KIMLEY-HORN AND ASSOCIATES, INC.
1700 SE 17TH STREET, SUITE 200
OCALA, FL 34471
PHONE: 352-438-3000
BIDDING NUMBER ITB No. CIP/250425
G02
G02
4 DRAWING WHERE
DETAIL IS FOUND
DETAIL OR SECTION
NUMBER/LETTER
EXTENTS OF
ENLARGED VIEW
DETAIL
SCALE: N.T.S.
SECTION OR DETAIL
NUMBER/LETTER
DRAWING WHERE
DETAIL IS REFERENCED
A
M-2 DETAIL OR SECTION
NUMBER/LETTER
DRAWING WHERE
DETAIL IS FOUND
OPTIONAL HAT
(INDICATES VIEW
DIRECTION)
SECTION CUT AND
DIRECTION TAIL
MECHANICAL JOINT FITTINGS
FLANGED FITTINGS
SOLVENT WELD FITTINGS
BUTT-WELD FITTINGS (S.STL SHOWN)
BALL VALVE (SOLVENT WELD SHOWN)
GATE VALVE (FLANGED SHOWN)
PLUG VALVE (FLANGED SHOWN)
BUTTERFLY VALVE (FLANGED
SHOWN, WHEEL OPERATED)
BUTTERFLY VALVE (WAFER,
LEVER OPERATED)
GLOBE CHECK VALVE (FLANGED SHOWN)
SWING CHECK VALVE (FLANGED SHOWN)
PIPE COUPLING
EXPANSION JOINT (FLANGED SHOWN)
FLOW CONTROL VALVE (FLANGED SHOWN)
MAGNETIC FLOW METER
PROPELLER FLOW METER
V-CONE FLOW METER
VENTURI FLOW METER
SOLID LINE PIPING INDICATES ABOVE GRADE
PIPING UNLESS OTHERWISE NOTED
DASHED LINE PIPING INDICATES BELOW
GRADE PIPING UNLESS OTHERWISE NOTED
SHEET NUMBER
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
KH
A
PR
O
JE
C
T
LI
C
EN
SE
D
P R
O
FE
SS
IO
N
AL
D
AT
E:
LI
C
EN
SE
N U
M
BE
R
D
AT
E
SC
AL
E:
A
S
SH
O W
LE
Y-
HO
RN
A
ND
A
SS
OC
IA
TE
S, IN
C.
W W
W .K
IM
LE
Y-
HO
RN
.C
OM
RE
GI
ST
RY
N
.. 3
PR
EP
AR
ED
F O
R
A u to d e sk
D o c s:
O c a la
W T P O c a la
W T P
(P ro c e ss
S h e e ts rv t
A u to d e sk
D o c s:
O c a la
W T P O c a la
W T P
(P ro c e ss
S h e e ts rv t
FE
BR
U
AR
Y
C
IT
Y O
F O
C
AL
A, F
LO
R
ID
A
O C
AL
A
W
AT
ER
TR
EA
TM
EN
T
PL
AN
T
SA
VA
N N
AH
R
AE
M
ID
D
LE
TO
N
SM
IT
H
, P .E
FL
BID SET
S E
TH
S
TR
EE
T, S
UI
TE
, O
CA
LA
, F L
PH
O
NE
: 3
-4
-3
G02
SR
M
S
R
LL
LL
/A
G
ST
AN
D
AR
D L
EG
EN
D
AN
D A
BB
R
EV
IA
TI
O
N S
NORTH
0 2' 8'4'
GRAPHIC SCALE IN FEET
1/2" 1" 2"
4' 8'
GRAPHIC SCALE IN INCHES
STANDARD NORTH ARROW
(ROTATED TO TRUE NORTH)
GRAPHIC SCALES
(VALUES ACCURATE
WHEN PLOTTED AT
FULL SIZE)
NOTE (TYP)
NOTE
ANNOTATION, SINGLE LEADER
(INDICATING TYPICAL AT
MULTIPLE LOCATIONS)
ANNOTATION, MULTIPLE LEADERS
(INDICATING DISCRETE TARGETS)
DRAFTING LEGEND
DETAIL/SECTION REFERENCES
PROCESS PIPING LEGEND (DOUBLE-LINE OR 3D)
8" DIP, FLG (PW)
TYPICAL PIPING LABEL NOMENCLATURE
PROCESS ABBREVIATION
JOINT TYPE
PIPE MATERIAL
PIPE SIZE
STANDARD
ABBREVIATIONS
NOTE:
THIS LEGEND IS FOR GENERAL REFERENCE.
NOT ALL ABBREVIATIONS, SYMBOLS,
PROCESSES, MATERIALS, OR FITTINGS MAY
BE USED IN THIS DESIGN, NOR IS THIS
LEGEND COMPREHENSIVE. REFER TO
INDIVIDUAL DRAWING LEGEND(S) IF SYMBOLS
ARE NOT LISTED. INDIVIDUAL DISCIPLINE
STANDARD LEGENDS SUPERCEDE THIS
GENERAL LEGEND, IF PROVIDED.
(A)ARV (AUTOMATIC) AIR RELEASE VALVE
A/C AIR CONDITIONING
A/VV AIR/VACUUM AIR VALVE
AAV AUTOMATIC AIR VENT
AB-xx AUGER BORING (e.g. AB-1)
ABAN ABANDON(ED)
ABFV ACTUATED BUTTERFLY VALVE
ABRSV ABRASIVE
ABS ACRYLONITRILE BUTADIENE
STYRENE
ACCV ASPHALT-COATED CORRUGATED
METAL PIPE
ACP AIR CUSHION CHECK VALVE
ADH ADHESIVE
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AG AMMONIA GAS
AIR AIR PIPE
AL ALUMINUM
ALT ALTERNATE
AMM AMMONIATOR
AOD ANGLE OF DEFLECTION
APPROX APPROXIMATE
AS AMMONIA SOLUTION
ASSY ASSEMBLY
B-xx BORING (e.g. B-1)
B/W BOTH WAYS
BCV BALL CHECK VALVE
BF BLIND FLANGE
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BGO BURIED GEAR OPERATOR
BI BLACK IRON
BIP BLACK IRON PIPE
BITUM BITUMINOUS or BITUMASTIC
BLDG BUILDING
BM BENCH MARK
BOC BACK OF CURB
BOS BOTTOM OF SLAB
BOT BOTTOM
BSP BLACK STEEL PIPE
BTWN BETWEEN
BV BALL VALVE
BW BUTT WELD
BWS BACKWASH SUPPLY
BWW BACKWASH WASTE
C&G CURB & GUTTER
C.F. CUBIC FOOT
C.I. CUBIC INCH
C.Y. CUBIC YARD
C/C CENTER TO CENTER
CA COMPRESSED AIR
CaCL2 CALCIUM CHLORIDE
CAP CAPACITY
CATV CABLE TELEVISION
CAV COMBINATION AIR VALVE
CBP CHLORINE BOOSTER PUMP
CCC CHLORINE CONTACT CHAMBER
CE CHLORINATED EFFLUENT
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CI CAST IRON
CIN CORROSION INHIBITOR
CIPF CLEAN-IN-PLACE FILL
CIPR-S CLEAN-IN-PLACE RETURN or SUPPLY
CISP CAST IRON SOIL PIPE
CL CENTER LINE
CL2 CHLORINE GAS
CLF CHAIN LINK FENCE
CLN CLEANING
CLR CLEAR(ANCE)
CMP CORRUGATED METAL PIPE
CMPA CORRUGATED METAL PIPE ARCH
CO CLEAN OUT
CO2 CARBON DIOXIDE
COAG COAGULANT
CONC CONCENTRATE
CONN CONNECTION
CONSTR CONSTRUCT(ION)
CONT CONTINUATION
COP COPPER PIPE
CP CONCRETE PIPE
CPA CONCRETE PIPE ARCH
CPLG COUPLING
CPP CONCRETE PRESSURE PIPE
CPVC CHLORINATED POLYVINYL CHLORIDE
CS CHLORINE SOLUTION
CV CHECK VALVE
CW DOMESTIC COLD WATER
CWT CLARIFIED WATER TRANSFER
CYL CYLINDER
D DRAIN
DEG DEGREE
DEMO DEMOLITION
DF DIESEL FUEL
DI/DIP DUCTILE IRON (PIPE)
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIR DIRECTION
DISCH DISCHARGE
DJ DISMANTLING JOINT
DMH DROP MANHOLE
DN DOWN
DR DIMENSION RATIO
DV DIAPHRAGM VALVE
DW DISINFECTED WATER
DWG DRAWING
DWV DRAIN, WASTE, AND VENT
E EAST(ING)
E.F. EACH FACE
E.W. EACH WAY
EA EACH
ECC ECCENTRIC
EFF EFFLUENT
EGO ELEVATED GEAR OPERATOR
EJ EXPANSION JOINT
EL(EV) ELEVATION
ELAST ELASTOMERIC
ELL ELBOW
EMER EMERGENCY
EOP EDGE OF PAVEMENT
EPDM ETHYLENE PROPYLENE DIENE
MONOMER
EQUIP EQUIPMENT
EST ESTIMATE(D)
EVA ELECTRIC VALVE ACTUATOR
EX(IST) EXISTING
EXP EXPANSION
EXT EXTERIOR
F/F FACE TO FACE
FAB FABRICATE(D)
FC FLEXIBLE COUPLING
FCA FLANGED COUPLING ADAPTER
FCV FLOW CONTROL VALVE
FD FLOOR DRAIN
FE FILTER(ED) EFFLUENT
FEED RO FEED
FF FINISHED FLOOR
FH FIRE HYDRANT
FIG FIGURE
FIN FINISH(ED)
FL FLUORIDE
FLEX FLEXIBLE
FLG FLANGE(D)
FLR FLOOR
FM FORCE MAIN
FO(L)(C) FIBER OPTIC (LINE)(CONDUIT)
FP FIRE PROTECTION
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRP FIBERGLASS REINFORCED PLASTIC
FT FOOT OR FEET
FV FOOT VALVE
FW FINISHED WATER
G.O. GEAR OPERATED
GA GAUGE
GAL GALLON(S)
GALV GALVANIZED
GBW GAC BACKWASH
GCV GLOBE CHECK VALVE
GE GROOVED END
GEN GENERATOR
GIP GALVANIZED IRON PIPE
GJ GROOVE JOINT
GND GROUND
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPS GALLONS PER SECOND
GR GRADE
GS GALVANIZED STEEL
GSP GALVANIZED STEEL PIPE
GSR GROUND STORAGE RESERVOIR
GST GROUND STORAGE TANK
GV GATE VALVE
HB HOSE BIBB
HD HEAVY DUTY
HDD HORIZONTAL DIRECTIONAL DRILL
HDPE HIGH-DENSITY POLYETHYLENE
HF6 HYDROGEN HEXAFLUORIDE
HFA HYDROFLUOSILICIC ACID
HFCA HARNESSED FLANGED COUPLING
ADAPTER
HORIZ HORIZONTAL
HP HORSEPOWER
HPA HIGH PRESSURE AIR
HR HOUR
HSP HIGH SERVICE PUMP
HT HEIGHT
HVA HYDRAULIC VALVE ACTUATOR
HVAC HEATING, VENTILATION, AND AIR
CONDITIONING
HW DOMESTIC HOT WATER
HWL HIGH WATER LEVEL
HYD HYDRAULIC
ID INSIDE DIAMETER
IMLR INTERNAL MIXED LIQUOR RETURN
IN INCH(ES)
INF INFLUENT
INV INVERT
IP IRON PIPE
IPS INTERNATIONAL PIPE STANDARD
IR INTERNAL RECYCLE
IW IRRIGATION WATER
JB JUNCTION BOX
JT JOINT
KGV KNIFE GATE VALVE
L,LT LEFT
LAB LABORATORY
LAM LAMINATE OR LAMINATION
LAT LATERAL
LB(S) POUND(S)
LEN LENGTH
LF LINEAR FEET
LHDPE LINEAR HIGH-DENSITY
POLYETHYLENE
LS LIME SLURRY
LSS LIME STABILIZED SLUDGE
LWL LOW WATER LEVEL
M MECHANICAL JOINT
MAINT MAINTAIN OR MAINTENANCE
MAN MANUAL(LY)
MAX MAXIMUM
MCC MOTOR CONTROL CENTER
ME(S) MITERED END (SECTION)
MECH MECHANICAL
MF MICROFILTRATION
MFR MANUFACTURE(R)
MG MILLION GALLONS
MGD MILLION GALLONS PER DAY
MH MANHOLE
MI MILE(S)
MIN MINIMUM
MISC MISCELLANEOUS
ML MIXED LIQUOR
MPH MILES PER HOUR
MRPP METAL REINFORCED PLASTIC PIPE
MTD MOUNTED
MV MOTORIZED VALVE
MW MANWAY
MWL MEAN WATER LEVEL
N NORTH(ING)
N.C. NORMALLY CLOSED
N.O. NORMALLY OPEN
N/A NOT APPLICABLE
NaOCl SODIUM HYPOCHLORITE NaOH SODIUM HYDROXIDE
NE NORTHEAST
NF NANOFILTRATION
NIC, N.I.C. NOT IN CONTRACT
NO., # NUMBER
NOM NOMINAL
NPT NATIONAL PIPE TAPER
NPW NON-POTABLE WATER
NSFC NOT SHOWN FOR CLARITY
NTS,N.T.S. NOT TO SCALE
NW NORTHWEST
O2 OXYGEN
O&M OPERATION AND MAINTENANCE
O.C. ON CENTERS
O.C.E.W. ON CENTERS EACH WAY
O/E OR EQUAL
O/O OUTSIDE TO OUTSIDE
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OFF OFFSET
OH OVERHEAD
OP ORIFICE PLATE
OPER OPERATOR
OPP OPPOSITE
OPT OPTION(AL)
OS&Y OUTSIDE STEM & YOKE
OVF OVERFLOW
P/L PROPERTY LINE
PA PROCESS AIR
PBV PLASTIC BALL VALVE
PC POINT OF CURVE
PE PLAIN END
PEP POLYETHYLENE PIPE
PERM PERMEATE
PG PRESSURE GAUGE
PGL PROPOSED GRADE LINE
PJ PUSH-ON JOINT
PLC PROGRAMMABLE LOGIC
CONTROLLER
PM PROCESS MECHANICAL
PNV PINCH VALVE
POB POINT OF BEGINNING
POI POINT OF INTERSECTION
POJ PUSH-ON JOINT
POL POLYMER
POT POINT OF TANGENCY
PPD POUNDS PER DAY
PPM PARTS PER MILLION
PREFAB PREFABRICATED
PRES PRESSURE
PROP PROPOSED
PRV PRESSURE REDUCING VALVE
PRW PROCESS WATER
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PV PLUG VALVE
PVC POLYVINYL CHLORIDE
PVC-D POLYVINYL CHLORIDE (DOUBLE
CONTAINED)
PVDF POLYVINYLIDENE FLUORIDE (KYNAR)
PVMT PAVEMENT
PW POTABLE WATER
Q FLOW
QTY QUANTITY
R,RT RIGHT
R/W, R.O.W. RIGHT OF WAY
RAD., R. RADIUS
RAS RETURN ACTIVATED SLUDGE
RAW RAW WATER
RCB REINFORCED CONCRETE BOX
RCP REINFORCED CONCRETE PIPE
RCPA REINFORCED CONCRETE PIPE ARCH
RCW,RW RECLAIMED WATER
REBAR REINFORCING STEEL
REC RECIRCULATION
(DISCHARGE/SUCTION)
RED REDUCER
REEW REUSE EFFLUENT WATER
REF REFERENCE
REINF REINFORCE(D)(ING)(MENT)
REJ RO REJECT, REJECT
REQ'D REQUIRED
REW RETURN EFFLUENT WATER
RJ RESTRAINED JOINT (BELL)
RMJ RESTRAINED MECHANICAL JOINT
RNG RANGE
RO REVERSE OSMOSIS
ROC RADIUS OF CURVATURE
RPM REVOLUTIONS PER MINUTE
RPZBP REDUCED PRESSURE ZONE
BACKFLOW PREVENTER
RR RAILROAD
RW RAW SEWAGE
RWW RAW WASTEWATER
S SOUTH
S.F. SQUARE FOOT
S.I. SQUARE INCH
S.O. SIDE OPERATED
S.STL STAINLESS STEEL
S.Y. SQUARE YARD
SAMP SAMPLE LINE
SAN SANITARY
SB-xx SOIL BORING (e.g., SB-1)
SCH SCHEDULE
SCV SILENT CHECK VALVE
SD STORM DRAIN
SDR STANDARD DIMENSION RATIO
SE SOUTHEAST
SEC SECTION
SEFF SECONDARY EFFLUENT
SF SQUARE FOOT or FEET
SHT SHEET(ED)(ING)
SI SCALE INHIBITOR
SIM SIMILAR
SL SLUDGE
SLV SLEEVE
SM SHEET METAL
SOL SOLUTION
SP SOIL PIPE
SPEC(S) SPECIFICATION(S)
SPT-xx STANDARD PENETRATION TEST
BORING (e.g. SPT-1)
SQ SQUARE
SS SANITARY SEWER
SSE SUBSTANDARD EFFLUENT
ST SAMPLE TAP
STA STATION
STD STANDARD
STL STEEL
STORM STORMWATER
STR STRAIGHT
SUP SUPERNATANT
SV SOLENOID VALVE
SVC SERVICE
SVW SERVICE WATER
SW SOUTHWEST
SWD SIDEWATER DEPTH
SYM SYMBOL
SYMM SYMMETRICAL
T&B TOP AND BOTTOM
T.O.C. TOP OF CONCRETE
T.O.S. TOP OF SLAB
T.S. TAPPING SLEEVE
T.V. TAPPING VALVE
T/B TOP OF BANK
T/C TOP OF CURB
T/S TOE OF SLOPE
TAN TANGENT
TB-xx TEST BORING-xx (e.g. TB-1)
TBM TEMPORARY BENCHMARK
TDH TOTAL DYNAMIC HEAD
TEL TELEPHONE
TEMP TEMPORARY
TH TEST HOLE
THD THREAD(ED)
THK THICK(NESS)
TJ TIED JOINT
TS THICKENED SLUDGE
TV TELEVISION
TWP TOWNSHIP
TYP TYPICAL
UD UNDERDRAIN
UF ULTRAFILTRATION
UG UNDERGROUND
UGE UNDERGROUND ELECTRIC
UON UNLESS OTHERWISE NOTED
UTC UNDERGROUND TELEPHONE CABLE
UTIL UTILITY
UV ULTRAVIOLET
V VENT
VAC VACUUM
VAR VARIES
VB VALVE BOX
VC VERTICAL CURVE
VCP VITRIFIED CLAY PIPE
VEL VELOCITY
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
VTR VENT THROUGH ROOF
W WEST
W.L. WATER LEVEL
W.P. WALL PIPE (WITH WATERSTOP)
W/ WITH
W/O WITHOUT
WAS WASTE ACTIVATED SLUDGE
WCO WALL CLEANOUT
WF WIDE FLANGE
WH WALL HYDRANT
WM WATER MAIN
WPR WORKING PRESSURE
WS(P) WELDED STEEL (PIPE)
WT WEIGHT
WTF WATER TREATMENT FACILITY
WTP WATER TREATMENT PLANT
WW WASTEWATER
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
WWTF WASTEWATER TREATMENT FACILITY
WWTP WASTEWATER TREATMENT PLANT
XFER TRANSFER
XLHDPE CROSS LINKED HIGH-DENSITY
POLYETHYLENE
YD YARD(S)
YH YARD HYDRANT
YR YEAR(S)
N o.
R ev is io ns B y D at e
SEE SHEET G04 -
GENERAL NOTES
FOR SURVEY
LEGEND AND
SURVEY NOTES
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
KH
A
PR
O
JE
C
T
LI
C
EN
SE
D
P R
O
FE
SS
IO
N
AL
D
AT
E:
LI
C
EN
SE
N U
M
BE
R
D
AT
E
SC
AL
E:
A
S
SH
O W
LE
Y-
HO
RN
A
ND
A
SS
OC
IA
TE
S, IN
C.
W W
W .K
IM
LE
Y-
HO
RN
.C
OM
RE
GI
ST
RY
N
.. 3
PR
EP
AR
ED
F O
R
A u to d e sk
D o c s:
O c a la
W T P O c a la
W T P
(P ro c e ss
S h e e ts rv t
A u to d e sk
D o c s:
O c a la
W T P O c a la
W T P
(P ro c e ss
S h e e ts rv t
FE
BR
U
AR
Y
C
IT
Y O
F O
C
AL
A, F
LO
R
ID
A
O C
AL
A
W
AT
ER
TR
EA
TM
EN
T
PL
AN
T
SA
VA
N N
AH
R
AE
M
ID
D
LE
TO
N
SM
IT
H
, P .E
FL
BID SET
S E
TH
S
TR
EE
T, S
UI
TE
, O
CA
LA
, F L
PH
O
NE
: 3
-4
-3
G03.1
SR
M
S
R
LL
LL
/A
G
SH
EE
T
IN
D
EX
SHEET INDEX
SHEET NUMBER SHEET NAME
INCLUDED IN
DELIVERABLE
GENERAL
G01 COVER PAGE ●
G02 STANDARD LEGEND AND ABBREVIATIONS ●
G03.1 SHEET INDEX ●
G03.2 SHEET INDEX ●
G04 GENERAL NOTES ●
G05.1 PROCESS FLOW DIAGRAM LEGEND
G05.2 PROCESS FLOW DIAGRAM 1
G05.3 PROCESS FLOW DIAGRAM 2
G06.1 BUILDOUT SOUTHWEST CONCEPTUAL VIEW
G06.2 BUILDOUT NORTHEAST CONCEPTUAL VIEW
CIVIL
C01 SITE PLAN ●
C02 GST NO. 1 HORIZONTAL CONTROL PALN ●
C03 HORIZONTAL CONTROL PLAN
C04 HORIZONTAL CONTROL PLAN
C05 HORIZONTAL CONTROL PLAN
C06 HORIZONTAL CONTROL PLAN
C07 GST NO. 1 GRADING AND DRAINAGE PLAN ●
C08 PAVING, GRADING, & DRAINAGE PLAN
C09 PAVING, GRADING, & DRAINAGE PLAN
C10 PAVING, GRADING, & DRAINAGE PLAN
C11 PAVING, GRADING, & DRAINAGE PLAN
C12 POND DETAILS
C13 CIVIL CONSTRUCTION DETAILS
C14 EROSION CONTROL PLAN
C15 EROSION CONTROL NOTES ●
C16 EROSION CONTROL DETAILS ●
C17 TREE PRESERVATION PLAN ●
C18 TREE PRESERVATION PLAN
C19 TREE PRESERVATION PLAN
C20 SITE DEMOLITION PLAN ●
C21 OVERALL SITE PLAN AND YARD PIPING INDEX ●
C22 YARD PIPING BUILDOUT PLAN 1
C23 YARD PIPING BUILDOUT PLAN 2
C24 YARD PIPING BUILDOUT PLAN 3 ●
C25 YARD PIPING BUILDOUT PLAN 4 ●
C26 YARD PIPING BUILDOUT PLAN 5
C27 YARD PIPING BUILDOUT PLAN 6
C28 YARD PIPING BUILDOUT PLAN 7
C29 YARD PIPING BUILDOUT PLAN 8 ●
C30 YARD PIPING BUILDOUT PLAN 9
C31 YARD PIPING BUILDOUT PLAN 10
C32 YARD PIPING BUILDOUT PLAN 11
C33 YARD PIPING BUILDOUT PLAN 12
C34 YARD PIPING BUILDOUT PLAN 13
C35 YARD PIPING BUILDOUT PLAN 14
C36 YARD PIPING BUILDOUT PLAN 15
C37 YARD PIPING BUILDOUT PLAN 16
C38 YARD PIPING BUILDOUT PLAN 17
C39 YARD PIPING BUILDOUT PLAN 18
C40 YARD PIPING BUILDOUT PLAN 19
C41 YARD PIPING DETAILS
C42 YARD PIPING DETAILS
C43 YARD PIPING DETAILS
ARCHITECTURAL
A100 HIGH SERVICE PUMP STATION BUILDING LIFE SAFETY PLAN
A101 HIGH SERVICE PUMP STATION BUILDING FOUNDATION PLAN
A102 HIGH SERVICE PUMP STATION BUILDING FLOOR PLAN
A103 HIGH SERVICE PUMP STATION BUILDING ELEVATIONS
A104 HIGH SERVICE PUMP STATION BUILDING ROOF PLAN
A105 HIGH SERVICE PUMP STATION BUILDING WALL SECTION
A106 HIGH SERVICE PUMP STATION BUILDING WALL SECTION
A200 NF PROCESS BUILDING NOTES
A201 NF PROCESS BUILDING GROUND FLOOR LIFE SAFETY PLAN
A202 NF PROCESS BUILDING 2ND FLOOR LIFE SAFETY PLAN
A203 NF PROCESS BUILDING FOUNDATION PLAN
A204 NF PROCESS BUILDING FOUNDATION PLAN
A205 NF PROCESS BUILDING GROUND CONSTRUCTION FLOOR PLAN
A206 NF PROCESS BUILDING CONSTRUCTION GROUND FLOOR PLAN
A207 NF PROCESS BUILDING 2ND FLOOR CONSTRUCTION FLOOR PLAN
A208 NF PROCESS BUILDING 2ND FLOOR CONSTRUCTION FLOOR PLAN
A209 NF PROCESS BUILDING PARTIAL ENLARGED 2ND FLOOR PLAN
A210 NF PROCESS BUILDING RESTROOM ENLARGED FLOOR PLAN/ADA
STANDARDS
SHEET INDEX
SHEET NUMBER SHEET NAME
INCLUDED IN
DELIVERABLE
A211 NF PROCESS BUILDING ELEVATIONS
A212 NF PROCESS BUILDING ELEVATIONS
A213 NF PROCESS BUILDING ROOF PLAN
A214 NF PROCESS BUILDING WALL SECTIONS
A215 NF PROCESS BUILDING WALL SECTIONS
A300 BULK CHEMICAL BUILDING LIFE SAFETY PLAN
A301 BULK CHEMICAL BUILDING FOUNDATION PLAN
A302 BULK CHEMICAL BUILDING FLOOR PLAN
A303 BULK CHEMICAL BUILDING ELEVATION
A304 BULK CHEMICAL BUILDING ROOF PLAN
A305 BULK CHEMICAL BUILDING WALL SECTIONS
A400 ELECTRICAL BUILDING No. 3 NOTES & LIFE SAFETY FLOOR PLAN A401 ELECTRICAL BUILDING No. 3 FOUNDATION AND FLOOR PLAN A402 ELECTRICAL BUILDING No. 3 ELEVATIONS A403 ELECTRICAL BUILDING No. 3 ROOF PLAN A404 ELECTRICAL BUILDING No. 3 WALL SECTION
STRUCTURAL
S01.0 STRUCTURAL GENERAL NOTES
S01.1 STRUCTURAL GENERAL NOTES
S02.0 WTP 2 OVERVIEW LAYOUT
S03.0 NANOFILTRATION BUILDING FIRST FLOOR PLAN
S03.1 NANOFILTRATION BUILDING PIPE TRENCH FOUNDATION PLAN
S03.2 NANOFILTRATION BUILDING PIPE TRENCH SECTIONS
S04.0 BULK CHEMICAL STORAGE FOUNDATION AND WALL PLAN
S04.1 BULK CHEMICAL STORAGE PLAN
S04.2 BULK CHEMICAL STORAGE DETAILS AND SECTIONS
S05.0 CLEARWELL FOUNDATION PLAN
S05.1 CLEARWELL T/STRUCTURE PLAN
S05.2 CLEARWELL SECTIONS AND DETAILS
S06.0 GENERATOR AND FUEL STORAGE SLAB PLANS
S07.0 TYPICAL WELL SLAB PLAN
S08.0 CONCENTRATION PUMP SLAB PLAN
S09.0 HIGH SERVICE PUMP BUILDING FLOOR AND PIPE TRENCH FOUNDATION
PLANS
S09.1 HIGH SERVICE PUMP BUILDING PIPE TRENCH SECTIONS
S100 STRUCTURAL DETAILS (1 OF 4)
S101 STRUCTURAL DETAILS (2 OF 4)
S102 STRUCTURAL DETAILS (3 OF 4)
S103 STRUCTURAL DETAILS (4 OF 4)
PROCESS
M01.0 OVERALL PROCESS PLAN
M02.0 EXISTING RAW WATER WELL NO. 7 PIPING
M02.1 EXISTING RAW WATER WELL NO. 8 PIPING
M02.2 EXISTING RAW WATER WELL NO. 9 PIPING
M02.3 EXISTING RAW WATER WELL NO. 10 PIPING
M03.0 PROCESS BUILDING LOWER PHASING PLAN (PHASES 4-5)
M03.1 PROCESS BUILDING SECOND FLOOR PLAN (PHASES 4-5)
M03.2 PROCESS BUILDING PIPING TRENCH PHASING PLAN (PHASES 4-5)
M03.3 PROCESS BUILDING TYPICAL PIPING TRENCH DETAILS (PHASES 4-5)
M03.4 PROCESS BUILDING TYPICAL PIPING TRENCH DETAILS (PHASES 4-5)
M03.5 PROCESS BUILDING TYPICAL PIPING DETAILS
M03.6 PROCESS BUILDING PLAN (PHASE 4 SHOWN)
M04.0 SAND SEPARATOR DETAILS (PHASE 4)
M04.1 SAND SEPARATOR DETAILS (PHASE 4)
M04.2 SAND SEPARATOR DETAILS (PHASE 5)
M05.0 CARTRIDGE FILTERS PLAN AND SECTIONS (PHASE 4)
M05.1 CARTRIDGE FILTERS PLAN AND SECTIONS (PHASE 5)
M06.0 TYPICAL NF FEED PUMP PLAN AND DETAILS
M06.1 NF TRAIN DETAILS - PLAN AND 3D VIEWS (PHASE 4)
M06.2 NF TRAIN PROFILE (PHASE 4)
M06.3 NF TRAIN PROFILE (PHASE 4)
M06.4 NF TRAIN DETAILS - END ELEVATIONS (PHASE 4)
M06.5 TYPICAL NF TRAIN END CONNECTION DETAILS
M07.0 CLEAN-IN-PLACE SYSTEM DETAIL - PLAN (PHASE 4)
M07.1 CLEAN-IN-PLACE SYSTEM SECTIONS (PHASE 4)
M07.2 CLEAN-IN-PLACE SYSTEM OPERATION
M08.0 SCALE INHIBITOR BULK STORAGE PLAN DETAIL AND SECTIONS
M08.1 SCALE INHIBITOR BULK STORAGE PLAN DETAIL AND SECTIONS
M09.0 DEGASIFIERS AND ODOR SCRUBBERS PHASING PLAN (PHASES 4-5)
M09.1 DEGASIFIERS AND ODOR SCRUBBERS PLAN & DETAILS (PHASE 4)
M09.2 DEGASIFIERS AND ODOR SCRUBBERS DETAILS (PHASE 4)
M09.3 DEGASIFIERS AND ODOR SCRUBBERS PLAN & DETAILS (PHASE 5)
M09.4 DEGASIFIERS AND ODOR SCRUBBERS DETAILS (PHASE 5)
SHEET INDEX
SHEET NUMBER SHEET NAME
INCLUDED IN
DELIVERABLE
M10.0 FINISHED WATER TRANSFER PUMP STATION PHASING PLAN (PHASES 4-5)
M10.1 FINISHED WATER TRANSFER PUMP STATION DETAILS (PHASE 4)
M10.2 FINISHED WATER TRANSFER PUMP STATION TYPICAL SECTION (PHASE 4)
M10.3 FINISHED WATER TRANSFER PUMP STATION DETAILS (PHASE 5)
M11.0 4.5 MG CONCENTRATE GROUND STORAGE TANK NO. 1 PLAN
M11.1 4.5 MG CONCENTRATE GROUND STORAGE TANK NO. 1 SECTION
M12.0 4.5 MG CONCENTRATE GROUND STORAGE TANK NO. 2 PLAN DETAIL
M12.1 4.5 MG CONCENTRATE GROUND STORAGE TANK NO. 2 SECTION
M13.0 CONCENTRATE PUMP STATION PHASING PLAN (PHASE 4)
M13.1 CONCENTRATE PUMP STATION PHASING PLAN (PHASE 5)
M13.2 CONCENTRATE PUMP STATION DETAILS (PHASE 4)
M13.3 CONCENTRATE PUMP STATION DETAILS (PHASE 5)
M13.4 CONCENTRATE PUMP STATION DETAILS
M14.0 BULK CHEMICAL STORAGE AND METERING PLAN (PHASE 4)
M14.1 BULK CHEMICAL STORAGE AND METERING PLAN (PHASE 5)
M14.2 BULK CHEMICAL STORAGE AND METERING ELEVATIONS
M15.1 BULK CHEMICAL STORAGE AND METERING KEY PLAN
M15.2 SULFURIC ACID STORAGE AND METERING PLAN (PHASE 4)
M15.3 SULFURIC ACID STORAGE AND METERING PLAN (PHASE 5)
M15.4 SULFURIC ACID STORAGE AND METERING ELEVATIONS
M15.5 CORROSION INHIBITOR STORAGE AND METERING PLANS (PHASE 4 & 5)
M15.6 CORROSION INHIBITOR STORAGE AND METERING SECTIONS
M15.7 FLUORIDE STORAGE AND METERING PLANS (PHASE 4 & 5)
M15.8 FLUORIDE STORAGE AND METERING ELEVATIONS
M15.9 CAUSTIC SODA STORAGE AND METERING PLAN (PHASE 4)
M15.10 CAUSTIC SODA STORAGE AND METERING PLAN (PHASE 5)
M15.11 CAUSTIC SODA STORAGE AND METERING ELEVATIONS
M15.12 SODIUM HYPOCHLORITE STORAGE AND METERING PLAN (PHASE 4)
M15.13 SODIUM HYPOCHLORITE STORAGE AND METERING PLAN (PHASE 5)
M15.14 SODIUM HYPOCHLORITE STORAGE AND METERING ELEVATIONS
M16.1 HIGH SERVICE PUMP STATION - PHASING PLAN (PHASE 4)
M16.2 HIGH SERVICE PUMP STATION - PHASING PLAN (PHASE 5)
M17.1 HIGH SERVICE PUMP STATION PLAN DETAILS (PHASE 4)
M17.2 HIGH SERVICE PUMP STATION PLAN DETAILS (PHASE 5)
M17.3 HIGH SERVICE PUMP STATION SECTIONS
M17.4 HIGH SERVICE PUMP STATION SECTIONS
M17.5 HIGH SERVICE PUMP STATION SECTIONS
M18.0 HIGH SERVICE PUMP STATION FLOW METER ASSEMBLY DETAILS
M19.0 FINISHED WATER 3MG GROUND STORAGE TANK NO. 1 ●
M19.1 FINISHED WATER 3MG GROUND STORAGE TANK NO. 1 DETAILS ●
M19.2 FINISHED WATER 3MG GROUND STORAGE TANK NO. 1 DETAILS ●
M19.3 FINISHED WATER 3MG GROUND STORAGE TANK NO. 2
M19.4 FINISHED WATER 3MG GROUND STORAGE TANK NO. 2 DETAILS
M19.5 FINISHED WATER 3MG GROUND STORAGE TANK NO. 2 DETAILS
M19.6 FINISHED WATER 3MG GROUND STORAGE TANK NO. 3
M19.7 FINISHED WATER 3MG GROUND STORAGE TANK NO. 3 DETAILS
M19.8 FINISHED WATER 3MG GROUND STORAGE TANK NO. 3 DETAILS
M25.1 STANDARD DETAILS 1
M25.2 STANDARD DETAILS 2
M25.3 STANDARD DETAILS 3
M25.4 STANDARD DETAILS 4
M25.5 GROUND STORAGE TANK STANDARD DETAILS 1
M25.6 GROUND STORAGE TANK STANDARD DETAILS 2
M25.7 GROUND STORAGE TANK STANDARD DETAILS 3
M25.8 GROUND STORAGE TANK STANDARD DETAILS 4
MECHANICAL
H01 NF BUILDING MECHANICAL LEGEND & SCHEDULES
H02 NF BUILDING MECHANICAL PLAN
H03 ADMINISTRATION BUILDING MECHANICAL PLAN
H04 MECHANICAL DETAILS
FIRE PROTECTION
FP01 FIRE PROTECTION LEGEND & DETAILS
FP02 NF BULIDING FIRE PROTECTION PLAN
FP03 ADMINISTRATION BULIDING FIRE PROTECTION PLAN
PLUMBING
P01 PLUMBING SCHEDULE AND DETAILS
P02 NF BULDING PLUMBING PLAN
P03 NF BULDING PIPING TRENCH PLUMBING PLAN
P04 ADMINISTRATION BULDING PLUMBING PLAN
N o.
R ev is io ns B y D at e
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
KH
A
PR
O
JE
C
T
LI
C
EN
SE
D
P R
O
FE
SS
IO
N
AL
D
AT
E:
LI
C
EN
SE
N U
M
BE
R
D
AT
E
SC
AL
E:
A
S
SH
O W
LE
Y-
HO
RN
A
ND
A
SS
OC
IA
TE
S, IN
C.
W W
W .K
IM
LE
Y-
HO
RN
.C
OM
RE
GI
ST
RY
N
.. 3
PR
EP
AR
ED
F O
R
A u to d e sk
D o c s:
O c a la
W T P O c a la
W T P
(P ro c e ss
S h e e ts rv t
A u to d e sk
D o c s:
O c a la
W T P O c a la
W T P
(P ro c e ss
S h e e ts rv t
FE
BR
U
AR
Y
C
IT
Y O
F O
C
AL
A, F
LO
R
ID
A
O C
AL
A
W
AT
ER
TR
EA
TM
EN
T
PL
AN
T
SA
VA
N N
AH
R
AE
M
ID
D
LE
TO
N
SM
IT
H
, P .E
FL
BID SET
S E
TH
S
TR
EE
T, S
UI
TE
, O
CA
LA
, F L
PH
O
NE
: 3
-4
-3
G03.2
SR
M
S
R
LL
LL
/A
G
SH
EE
T
IN
D
EX
SHEET INDEX
SHEET NUMBER SHEET NAME
INCLUDED IN
DELIVERABLE
ELECTRICAL
E01 ELECTRICAL NOTES, SYMBOLS AND ABBREVIATIONS ●
E02 AERIAL SITE PLAN
E03 OVERALL ELECTRICAL SITE PLAN
E04 MAIN BREAKERS-1A & 1B & ATS-1A & 1B SINGLE LINE DIAGRAMS
E05 MAIN BREAKERS-2A & 2B & ATS-2A & 2B SINGLE LINE DIAGRAMS
E06 MAIN BREAKERS-2A & 2B & ATS-2A & 2B SINGLE LINE DIAGRAMS
E07 SWBD-1A SINGLE LINE DIAGRAM
E08 SWBD-1B SINGLE LINE DIAGRAM
E09 MCC-1 & MCC-2 SINGLE LINE DIAGRAMS
E10 SWBD-3A SINGLE LINE DIAGRAM
E11 SWBD-4A SINGLE LINE DIAGRAM
E12 MCC-3 SINGLE LINE DIAGRAM
E13 MCC4 SINGLE LINE DIAGRAM
E14 SWBD-5 SINGLE LINE DIAGRAM
E15 SWBD-6 SINGLE LINE DIAGRAM
E16 SWBD-2A SINGLE LINE DIAGRAM
E17 SWBD-2B SINGLE LINE DIAGRAM
E18 SWBD-3B SINGLE LINE DIAGRAM
E19 SWBD-4B SINGLE LINE DIAGRAM
E20 TYPICAL RAW WATER WELLS SINGLE LINE & RISER DIAGRAMS
E21 EXISTING WTP SINGLE LINE DIAGRAM
E22 SWITCHBOARD NO. 1A & NO. 2A & 1B & 2B LOAD TABULATION -SHEET 1
E23 MCC-1 AND MCC-2 LOAD TABULATIONS -SHEET 2
E24 MCC-3 LOAD TABULATIONS -SHEET 3
E25 MCC-4 LOAD TABULATIONS -SHEET 4
E26 SWITCHBOARD NO. 3B & NO. 4B LOAD TABULATION -SHEET 5
E27 MB NO. 1A & 2A, FUTURE SWITCHBOARDS NO. 2B & 3B EQUIPMENT FRONT
VIEWS - SHEET 1
E28 SWITCHBOARDS NO. 3A & NO. 4A & FUTURE SWITCHBOARDS NO. 3B& 4B
E29 MCC-1 & 2 & MCC-3 & 4 EQUIPMENT FRONT VIEWS - SHEET 3
E30 OVERALL NETWORK RISER DIAGRAM
E31 CONTROL RISER DIAGRAMS - SHEET 1
E32 CONTROL RISER DIAGRAMS - SHEET 2
E33 CONTROL RISER DIAGRAMS - SHEET 3
E34 ELEMENTARY DIAGRAM - SHEET 1
E35 ELEMENTARY DIAGRAM - SHEET 2
E36 ELEMENTARY DIAGRAM - SHEET 3
E37 ELEMENTARY DIAGRAM - SHEET 4
E38 ELEMENTARY DIAGRAM - SHEET 5
E39 ELEMENTARY DIAGRAM - SHEET 6
E40 HIGH SERVICE PUMP STATION/ELECTRICAL BUILDING NO. 1 KEY PLAN
E41 ELECTRICAL BLDG NO. 1 & STORAGE ROOM POWER PLAN
E42 ELECTRICAL BLDG NO. 1 LIGHTING PLAN
E43 ELECTRICAL BLDG NO. 1 LIGHTNING PROTECTION & GROUNDING PLAN
E44 HIGH SERVICE PUMP STATION ELECTRICAL PLAN
E45 HIGH SERVICE PUMP STATION LIGHTING PLAN
E46 HIGH SERVICE PUMP STATION LIGHTNING PROTECTION & GROUNDING
PLAN
E47 HIGH SERVICE PUMP STATION FLOW METER ASSEMBLY ELECTRICAL PLAN
E48 EMERGENCY GENERATOR NO. 1A & NO. 2A & FUTURE NO. 1B & 2B POWER
PLAN
E49 FUEL TANKS POWER PLAN
E50 PROCESS BUILDING KEY MAP
E51 ELECTRICAL BUILDING NO. 2 POWER PLAN
E52 ELECTRICAL BUILDING NO. 2 LIGHTING PLAN
E53 ELECTRICAL BUILDING NO. 2 LIGHTNING PROTECTION & GROUNDING PLAN
E54 PROCESS BUILDING LOWER ELECTRICAL PLAN
E55 CARTRIDGE FILTERS ELECTRICAL PLAN
E56 PROCESS BUILDING LOWER LIGHTING PLAN
E57 CARTRIDGE FILTERS LIGHTING PLAN
E58 PROCESS BUILDING LIGHTNING PROTECTION & GROUNDING PLAN
E59 CARTRIDGE FILTER LIGHTNING PROTECTION & GROUNDING PLAN
E60 PROCESS BUILDING UPPER POWER PLAN
E61 PROCESS BUILDING UPPER LIGHTING PLAN
E62 PROCESS BUILDING UPPER GROUNDING PLAN
E63 SAND SEPERATORS ELECTRICAL PLAN
E64 CONCENTRATE PUMP STATION ELECTRICAL PLAN
N o.
R ev is io ns B y D at e
SHEET INDEX
SHEET NUMBER SHEET NAME
INCLUDED IN
DELIVERABLE
E65 CONCENTRATE PUMP STATION GROUNDING PLAN
E66 4MG CONCENTRATE GST NO. 1 ELECTRICAL PLAN
E67 4MG CONCENTRATE GST NO. 2 ELECTRICAL PLAN
E68 ELECTRICAL BUILDING NO. 3 POWER PLAN
E69 ELECTRICAL BUILDING NO. 3 LIGHTING PLAN
E70 ELECTRICAL BUILDING NO. 3 LIGHTNING PROTECTION & GROUNDING PLAN
E71 CLEARWELL TPS & DEGASIFIERS ELECTRICAL PLAN
E72 CLEARWELL TPS & DEGASIFIERS GROUNDING PLAN
E73 BULK CHEMICAL STORAGE & METERING FACILITY ELECTRICAL PLAN
E74 BULK CHEMICAL STORAGE & METERING FACILITY LIGHTING PLAN
E75 BULK CHEMICAL STORAGE & METERING FACILITY LIGHTNING PROTECTION
& GROUNDING PLAN
E76 3MG FINISHED WATER GST NO. 1 ELECTRICAL PLAN ●
E77 3MG FINISHED WATER GST NO. 2 ELECTRICAL PLAN
E78 3MG FINISHED WATER GST NO. 3 ELECTRICAL PLAN
E79 EXISTING CHLORINE BLDG'S. ELECTRICAL PLAN
E80 WELLS NO. 6 & NO. 7 ELECTRICAL PLANS
E81 WELLS NO. 8 & NO. 9 ELECTRICAL PLANS
E82 WELL NO. 10 ELECTRICAL PLAN
E83 LIGHTING FIXTURE SCHEDULES AND DETAILS
E84 PANEL SCHEDULES - SHEET 2
E85 PANEL SCHEDULES - SHEET 4
E86 PANEL SCHEDULES - SHEET 4
E87 LIGHTING FIXTURE SCHEDULES AND DETAILS
E88 ELECTRICAL DETAILS - SHEET 1
E89 ELECTRICAL DETAILS - SHEET 2
E90 ELECTRICAL DETAILS - SHEET 3
E91 ELECTRICAL DETAILS - SHEET 4 ●
E92 ELECTRICAL DETAILS - SHEET 5
INSTRUMENTATION
I01 INSTRUMENTATION NOTES, SYMBOLS AND ABBREVIATIONS
I02 P&ID - RAW WATER MEMBRANE FEED WELL
I03 P&ID - RAW WATER BLENDING WELL
I04 P&ID - MEMBRANE TREATMENT SKID
I05 P&ID - DEGASSIFIER & ODOR CONTROL
I06 P&ID - HIGH SERVICE PUMP STATION
I07 P&ID - CONCENTRATE DISPOSAL
I08 P&ID - SODIUM HYPOCHLORITE SYSTEM P&ID
I09 CHEMICAL P&ID SULFURIC ACID AND FLUORIDE SYSTEMS
I10 P&ID-SODIUM HYDROXIDE CORROSION INHIBITOR SYSTEM P&ID
I11 CHEMICAL ANTI-SCALANT SYSTEM P&ID
I12 CHEMICAL - FLOUORIDE SYSTEM P&ID
I13 CHEMICAL-CORROSION INHIBITOR SYSTEM P&ID
I14 P&ID -MISCELLANEOUS
I15 POWER DISTRIBUTION MONITORING
I16 MISCELLANEOUS POWER MONITORING
I17 PICS HMI NETWORK DIAGRAM
I18 PICS PLC NETWORK DIAGRAM
I19 PICS RIO NETWORK DIAGRAM
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
KH
A
PR
O
JE
C
T
LI
C
EN
SE
D
P R
O
FE
SS
IO
N
AL
D
AT
E:
LI
C
EN
SE
N U
M
BE
R
D
AT
E
SC
AL
E:
A
S
SH
O W
LE
Y-
HO
RN
A
ND
A
SS
OC
IA
TE
S, IN
C.
W W
W .K
IM
LE
Y-
HO
RN
.C
OM
RE
GI
ST
RY
N
.. 3
PR
EP
AR
ED
F O
R
A u to d e sk
D o c s:
O c a la
W T P O c a la
W T P
(P ro c e ss
S h e e ts rv t
A u to d e sk
D o c s:
O c a la
W T P O c a la
W T P
(P ro c e ss
S h e e ts rv t
FE
BR
U
AR
Y
C
IT
Y O
F O
C
AL
A, F
LO
R
ID
A
O C
AL
A
W
AT
ER
TR
EA
TM
EN
T
PL
AN
T
SA
VA
N N
AH
R
AE
M
ID
D
LE
TO
N
SM
IT
H
, P .E
FL
BID SET
S E
TH
S
TR
EE
T, S
UI
TE
, O
CA
LA
, F L
PH
O
NE
: 3
-4
-3
G04
SR
M
S
R
LL
LL
/A
G
G
EN
ER
AL
N O
TE
S
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING ALL MATERIAL
AND LABOR TO CONSTRUCT THE FACILITY AS SHOWN AND DESCRIBED IN THE
CONSTRUCTION DOCUMENTS IN ACCORDANCE WITH THE APPROPRIATE
APPROVING AUTHORITIES, SPECIFICATIONS AND REQUIREMENTS.
CONTRACTOR SHALL CLEAR AND GRUB ALL AREAS UNLESS OTHERWISE
INDICATED, REMOVING TREES, STUMPS, ROOTS, MUCK, EXISTING PAVEMENT
AND ALL OTHER DELETERIOUS MATERIAL.
EXISTING UTILITIES SHOWN ARE LOCATED ACCORDING TO THE INFORMATION
AVAILABLE TO THE ENGINEER AT THE TIME OF THE TOPOGRAPHIC SURVEY AND
HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR THE ENGINEER.
GUARANTEE IS NOT MADE THAT ALL EXISTING UNDERGROUND UTILITIES ARE
SHOWN OR THAT THE LOCATION OF THOSE SHOWN ARE ENTIRELY ACCURATE.
FINDING THE ACTUAL LOCATION OF ANY EXISTING UTILITIES IS THE
CONTRACTOR'S RESPONSIBILITY AND SHALL BE DONE BEFORE HE COMMENCES
ANY WORK IN THE VICINITY. FURTHERMORE, THE CONTRACTOR SHALL BE
FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES DUE TO THE CONTRACTOR'S
FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND
UTILITIES. THE OWNER OR ENGINEER WILL ASSUME NO LIABILITY FOR ANY
DAMAGES SUSTAINED OR COST INCURRED BECAUSE OF THE OPERATIONS IN
THE VICINITY OF EXISTING UTILITIES OR STRUCTURES, NOR FOR TEMPORARY
BRACING AND SHORING OF SAME. IF IT IS NECESSARY TO SHORE, BRACE,
SWING OR RELOCATE A UTILITY, THE UTILITY COMPANY OR DEPARTMENT
AFFECTED SHALL BE CONTACTED AND THEIR PERMISSION OBTAINED
REGARDING THE METHOD TO USE FOR SUCH WORK.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE VARIOUS UTILITY
COMPANIES WHICH MAY HAVE BURIED OR AERIAL UTILITIES WITHIN OR NEAR
THE CONSTRUCTION AREA BEFORE COMMENCING WORK. THE CONTRACTOR
SHALL PROVIDE 48 HOURS MINIMUM NOTICE TO ALL UTILITY COMPANIES PRIOR
TO BEGINNING CONSTRUCTION. A LIST OF THE UTILITY COMPANIES WHICH THE
CONTRACTOR MUST CALL BEFORE COMMENCING WORK IS PROVIDED ON THE
COVER SHEET OF THESE CONSTRUCTION PLANS. THIS LIST SERVES AS A GUIDE
ONLY AND IS NOT INTENDED TO LIMIT THE UTILITY COMPANIES WHICH THE
CONTRACTOR MAY WISH TO NOTIFY.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED
CONSTRUCTION PERMITS AND BONDS IF REQUIRED PRIOR TO CONSTRUCTION.
THE CONTRACTOR SHALL HAVE AVAILABLE AT THE JOB SITE AT ALL TIMES ONE
COPY OF THE CONSTRUCTION DOCUMENTS INCLUDING PLANS,
SPECIFICATIONS, AND SPECIAL CONDITIONS AND COPIES OF ANY REQUIRED
CONSTRUCTION PERMITS.
ANY DISCREPANCIES ON THE DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO
THE ATTENTION OF THE OWNER AND ENGINEER BEFORE COMMENCING WORK.
NO FIELD CHANGES OR DEVIATIONS FROM DESIGN ARE TO BE MADE WITHOUT
PRIOR APPROVAL OF THE OWNER AND NOTIFICATION TO THE ENGINEER.
ALL COPIES OF COMPACTION, CONCRETE AND OTHER REQUIRED TEST
RESULTS ARE TO BE SENT TO THE OWNER AND DESIGN ENGINEER OF RECORD
DIRECTLY FROM THE TESTING AGENCY.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING TO THE ENGINEER
A CERTIFIED RECORD SURVEY SIGNED AND SEALED BY A PROFESSIONAL LAND
SURVEYOR REGISTERED IN THE STATE OF FLORIDA DEPICTING THE ACTUAL
FIELD LOCATION OF ALL CONSTRUCTED IMPROVEMENTS THAT ARE REQUIRED
BY THE JURISDICTIONAL AGENCIES FOR THE CERTIFICATION PROCESS. ALL
SURVEY COSTS WILL BE THE CONTRACTORS RESPONSIBILITY.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR DOCUMENTING AND
MAINTAINING AS-BUILT INFORMATION WHICH SHALL BE RECORDED AS
CONSTRUCTION PROGRESSES OR AT THE COMPLETION OF APPROPRIATE
CONSTRUCTION INTERVALS AND SHALL BE RESPONSIBLE FOR PROVIDING AS-
BUILT DRAWINGS TO THE OWNER FOR THE PURPOSE OF CERTIFICATION TO
JURISDICTIONAL AGENCIES AS REQUIRED. ALL AS-BUILT DATA SHALL BE
COLLECTED BY A STATE OF FLORIDA PROFESSIONAL LAND SURVEYOR WHOSE
SERVICES ARE ENGAGED BY THE CONTRACTOR.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT THE
PROPOSED IMPROVEMENTS SHOWN ON THE PLANS DO NOT CONFLICT WITH
ANY KNOWN EXISTING OR OTHER PROPOSED IMPROVEMENTS. IF ANY
CONFLICTS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE OWNER
PRIOR TO INSTALLATION OF ANY PORTION OF THE SITE WORK THAT WOULD BE
AFFECTED. FAILURE TO NOTIFY OWNER OF AN IDENTIFIABLE CONFLICT PRIOR
TO PROCEEDING WITH INSTALLATION RELIEVES OWNER OF ANY OBLIGATION TO
PAY FOR A RELATED CHANGE ORDER.
ALL CONSTRUCTION COVERED IN THESE PLANS SHALL COMPLY WITH THE
MATERIAL REQUIREMENTS AND QUALITY CONTROL STANDARDS CONTAINED IN
THE CITY OF OCALA LAND DEVELOPMENT CODE AND CONSTRUCTION
SPECIFICATIONS. IN CASE OF CONFLICT BETWEEN THE CODE AND/OR FDOT
STANDARD SPECIFICATIONS THE STRICTEST SHALL APPLY AS DETERMINED BY
CITY OF OCALA.
ADDITIONAL TEST BORINGS AND EXPLORATORY INVESTIGATIONS SHALL BE
MADE BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
NO CHANGES TO THE WORK AS SHOWN ON THESE PLANS SHALL BE MADE
WTIHOUT PRIOR WRITTEN APPROVAL OF THE CITY. CONTRACTOR SHALL NOT
SCALE DRAWINGS. CONTRACTOR SHALL CHECK ACTUAL SITE CONDITIONS
PRIOR TO CONSTRUCTION. ANY NEED FOR THE CLARIFICATION OF PROPOSED
IMPROVEMENTS OR FOR RESOLUTION OF DISCREPANCIES SHALL BE
IMMEDIATELY BROUGHT TO THE ATTENTION OF THE CITY.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO UTILITIES,
STRUCTURES, AND PROPERTY OF AND ADJACENT TO THE SITE CAUSED BY
CONSTRUCTION ACTIVITIES.
THE CONTRACTOR IS HEREBY REQUIRED TO IMPLEMENT JOB SAFETY AT ALL
TIMES THROUGHOUT THE DURATION OF THE PROJECT. JOB SAFETY PRACTICES
SHALL BE IN ACCORDANCE WITH OSHA AND ANY OTHER LOCAL, STATE, AND
FEDERAL REGULATIONS.
THE CONTRACTOR SHALL PREVENT THE DISCHARGE OF SEDIMENT INTO NEW
OR EXISTING STORMWATER MANAGEMENT FACILITIES DUE TO CONSTRUCTION
OPERATIONS. THE CONTRACTOR SHALL COMPLY WITH THE TURBIDITY CONTROL
REQUIREMENTS OF THE ERP PERMIT AS APPLICABLE TO PREVENT INCREASES
IN TURBIDITY IN EXCESS OF WATER QUALITY STANDARDS.
THE CONTRACTOR AND SUBCONTRACTORS, ARE HEREBY REQUIRED TO
PROMPTLY NOTIFY THE PROJECT ENGINEER OF ANY DISCREPANCIES OR
CONFLICTS FOUND IN THE PLANS OR SPECIFICATIONS, SO THEY CAN BE
CLARIFIED BY THE ENGINEER OF RECORD AS NEEDED.
THE PROJECT ENGINEER/OWNER SHALL HAVE ACCESS TO TH EWORK SITE AT
ALL TIMES.
CONTRACTOR SHALL CLEAR AND GRUB CONSTRUCTION AREAS BEFORE FILL IS
PLACED. ALL AREAS TO RECEIVE FILL SHALL BE STRIPPED OF ALL VEGETATION
AND TOPSOIL AND PROOF ROLLED PRIOR TO PLACING CLEAN FILL.
IF A SINKHOLE SHOULD FORM ON THIS SITE, ALL APPLICABLE PROCEDURES
OUTLINED IN THE SJRWMD 40D RULES SHALL BE FOLLWED. THE PROJECT
ENGINEER, AND THE APPROPRIATE PERMITTING AGENCIES, SHALL BE NOTIFIED
IMMEDIATELY FOR REPAIR PROCEDURES.
ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE SODDED UNLESS
OTHERWISE SPECIFIED.
ELEVATIONS OF PLANS REFER TO NATIONAL AMERICAN VERTICAL DATUM OF
1988 (NAVD88).
GENERAL NOTES
1.
2.
ALL MATERIAL REMOVED FROM THIS SITE BY THE CONTRACTOR
SHALL BE DISPOSED OF BY THE CONTRACTOR IN A LEGAL MANNER.
REFER TO THE TOPOGRAPHIC SURVEY FOR ADDITIONAL DETAILS OF
EXISTING STRUCTURES, ETC., LOCATED WITHIN THE PROJECT SITE.
UNLESS OTHERWISE NOTED, ALL EXISTING BUILDINGS,
STRUCTURES, SLABS, CONCRETE, ASPHALT, DEBRIS PILES, SIGNS,
AND ALL APPURTENANCES ARE TO BE REMOVED FROM THE SITE BY
THE CONTRACTOR AND PROPERLY DISPOSED OF IN A LEGAL
MANNER AS PART OF THIS CONTRACT. SOME ITEMS TO BE
REMOVED MAY NOT BE DEPICTED ON THE TOPOGRAPHIC SURVEY.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO VISIT THE SITE AND
DETERMINE THE FULL EXTENT OF ITEMS TO BE REMOVED. IF ANY
ITEMS ARE IN QUESTION, THE CONTRACTOR SHALL CONTACT THE
OWNER PRIOR TO REMOVAL OF SAID ITEMS.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
ALL PAVING, CONSTRUCTION, MATERIALS, AND WORKMANSHIP WITHIN
FDOT'S RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH FDOT
SPECIFICATIONS AND STANDARDS (LATEST EDITION).
ALL UNPAVED AREAS IN EXISTING RIGHTS-OF-WAY DISTURBED BY
CONSTRUCTION SHALL BE REGRADED AND SODDED.
TRAFFIC CONTROL ON ALL FDOT, LOCAL AND CITY RIGHTS-OF-WAY
SHALL MEET THE REQUIREMENTS OF THE MANUAL OF UNIFORM
TRAFFIC CONTROL DEVICES (U.S. DOT/FHA) AND THE REQUIREMENTS
OF THE STATE AND ANY LOCAL AGENCY HAVING JURISDICTION. IN
THE EVENT THAT THE CONTRACT DOCUMENTS AND THE
JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT,
THE MOST STRINGENT SHALL GOVERN.
THE CONTRACTOR SHALL GRADE THE SITE TO THE ELEVATIONS
INDICATED AND SHALL REGRADE WASHOUTS WHERE THEY OCCUR
AFTER EVERY RAINFALL UNTIL A GRASS STAND IS WELL ESTABLISHED
OR ADEQUATE STABILIZATION OCCURS.
ALL OPEN AREAS WITHIN THE PROJECT SITE SHALL BE SODDED
UNLESS INDICATED OTHERWISE ON THE LANDSCAPE PLAN.
ALL AREAS INDICATED AS PAVEMENT SHALL BE CONSTRUCTED IN
ACCORDANCE WITH THE TYPICAL PAVEMENT SECTIONS AS INDICATED
ON THE DRAWINGS.
WHERE EXISTING PAVEMENT IS INDICATED TO BE REMOVED AND
REPLACED, THE CONTRACTOR SHALL SAW CUT A MINIMUM 2" DEEP
FOR A SMOOTH AND STRAIGHT JOINT AND REPLACE THE PAVEMENT
WITH THE SAME TYPE AND DEPTH OF MATERIAL AS EXISTING OR AS
INDICATED.
WHERE NEW PAVEMENT MEETS THE EXISTING PAVEMENT, THE
CONTRACTOR SHALL SAW CUT THE EXISTING PAVEMENT A MINIMUM
2" DEEP FOR A SMOOTH AND STRAIGHT JOINT AND MATCH THE
EXISTING PAVEMENT ELEVATION WITH THE PROPOSED PAVEMENT
UNLESS OTHERWISE INDICATED.
THE CONTRACTOR SHALL INSTALL FILTER FABRIC OVER ALL
DRAINAGE STRUCTURES FOR THE DURATION OF CONSTRUCTION AND
UNTIL ACCEPTANCE OF THE PROJECT BY THE OWNER. ALL
DRAINAGE STRUCTURES SHALL BE CLEANED OF DEBRIS AS REQUIRED
DURING AND AT THE END OF CONSTRUCTION TO PROVIDE POSITIVE
DRAINAGE FLOWS.
IF DEWATERING IS REQUIRED, THE CONTRACTOR SHALL OBTAIN ANY
APPLICABLE REQUIRED PERMITS. THE CONTRACTOR IS TO
COORDINATE WITH THE OWNER AND THE DESIGN ENGINEER PRIOR
TO ANY EXCAVATION.
STRIP TOPSOIL AND ORGANIC MATTER FROM ALL AREAS OF THE SITE
AS REQUIRED. IN SOME CASES TOPSOIL MAY BE STOCKPILED ON SITE
FOR PLACEMENT WITHIN LANDSCAPED AREAS BUT ONLY AS
DIRECTED BY THE OWNER.
FIELD DENSITY TESTS SHALL BE TAKEN AT INTERVALS IN
ACCORDANCE WITH THE LOCAL JURISDICTIONAL AGENCY OR TO
FDOT STANDARDS. IN THE EVENT THAT THE CONTRACT DOCUMENTS
AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN
AGREEMENT, THE MOST STRINGENT SHALL GOVERN.
ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE
GRADED AS PER PLANS. THE AREAS SHALL THEN BE SODDED OR
SEEDED AS SPECIFIED IN THE PLANS, FERTILIZED, MULCHED,
WATERED AND MAINTAINED UNTIL HARDY GRASS GROWTH IS
ESTABLISHED IN ALL AREAS. ANY AREAS DISTURBED FOR ANY
REASON PRIOR TO FINAL ACCEPTANCE OF THE JOB SHALL BE
CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE
OWNER. ALL EARTHEN AREAS WILL BE SODDED OR SEEDED AND
MULCHED AS SHOWN ON THE LANDSCAPING PLAN.
ALL CUT OR FILL SLOPES SHALL BE 4 (HORIZONTAL) :1 (VERTICAL) OR
FLATTER UNLESS OTHERWISE SHOWN.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF
DUST AND DIRT RISING AND SCATTERING IN THE AIR DURING
CONSTRUCTION AND SHALL PROVIDE WATER SPRINKLING OR OTHER
SUITABLE METHODS OF CONTROL. THE CONTRACTOR SHALL
COMPLY WITH ALL GOVERNING REGULATIONS PERTAINING TO
ENVIRONMENTAL PROTECTION.
THE CONTRACTOR SHALL TAKE ALL REQUIRED MEASURES TO
CONTROL TURBIDITY, INCLUDING BUT NOT LIMITED TO THE
INSTALLATION OF TURBIDITY BARRIERS AT ALL LOCATIONS WHERE
THE POSSIBILITY OF TRANSFERRING SUSPENDED SOLIDS INTO THE
RECEIVING WATER BODY EXISTS DUE TO THE PROPOSED WORK.
TURBIDITY BARRIERS MUST BE MAINTAINED IN EFFECTIVE CONDITION
AT ALL LOCATIONS UNTIL CONSTRUCTION IS COMPLETED AND
DISTURBED SOIL AREAS ARE STABILIZED. THEREAFTER, THE
CONTRACTOR MUST REMOVE THE BARRIERS. AT NO TIME SHALL
THERE BE ANY OFF-SITE DISCHARGE WHICH VIOLATES THE WATER
QUALITY STANDARDS IN CHAPTER 17-302, FLORIDA ADMINISTRATIVE
CODE.
SOD, WHERE CALLED FOR, MUST BE INSTALLED AND MAINTAINED ON
EXPOSED SLOPES WITHIN 48 HOURS OF COMPLETING FINAL GRADING,
AND AT ANY OTHER TIME AS NECESSARY, TO PREVENT EROSION,
SEDIMENTATION OR TURBID DISCHARGES.
THE CONTRACTOR MUST REVIEW AND MAINTAIN A COPY OF THE
ENVIRONMENTAL RESOURCE PERMIT COMPLETE WITH ALL
CONDITIONS, ATTACHMENTS, EXHIBITS, AND PERMIT MODIFICATIONS
IN GOOD CONDITION AT THE CONSTRUCTION SITE. THE COMPLETE
PERMIT MUST BE AVAILABLE FOR REVIEW UPON REQUEST BY WATER
MANAGEMENT DISTRICT REPRESENTATIVES.
THE CONTRACTOR SHALL ENSURE THAT ISLAND PLANTING AREAS
AND OTHER PLANTING AREAS ARE NOT COMPACTED AND DO NOT
CONTAIN ROAD BASE MATERIALS. THE CONTRACTOR SHALL ALSO
EXCAVATE AND REMOVE ALL UNDESIRABLE MATERIAL FROM ALL
AREAS ON THE SITE TO BE PLANTED AND PROPERLY DISPOSED OF IN
A LEGAL MANNER.
THE CONTRACTOR SHALL INSTALL ALL UNDERGROUND STORM
WATER PIPING PER FDOT STANDARD SPECIFICATIONS.
VERTICAL DATUM FOR ELEVATIONS SHOWN IS NAVD 88. THE
CONVERSION FACTOR TO NGVD 29 IS NAVD88 + 1.11 FEET = NGVD 29
(ACCORDING TO JURISDICTIONAL WETLAND SURVEY PREPARED BY
STANTEC CONSULTING SERVICES, INC., DATED 08/10/16).
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
ALL CONSTRUCTION SHALL CONFORM TO MARION COUNTY AND CITY
OF OCALA STANDARDS.
THE CONTRACTOR SHALL CONSTRUCT GRAVITY SEWER LATERALS,
MANHOLES GRAVITY SEWER LINES AND DOMESTIC WATER AND FIRE
PROTECTION SYSTEM AS SHOWN ON THESE PLANS. THE
CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIALS,
EQUIPMENT, MACHINERY, TOOLS, MEANS OF TRANSPORTATION AND
LABOR NECESSARY TO COMPLETE THE WORK IN FULL AND COMPLETE
ACCORDANCE WITH THE SHOWN, DESCRIBED AND REASONABLY
INTENDED REQUIREMENTS OF THE CONTRACT DOCUMENTS AND
JURISDICTIONAL AGENCY REQUIREMENTS. IN THE EVENT THAT THE
CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY
REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT
SHALL GOVERN.
ALL EXISTING UNDERGROUND UTILITY LOCATIONS SHOWN ARE
APPROXIMATE. THE CONTRACTOR SHALL COMPLY WITH ALL
REQUIREMENTS FOR UTILITY LOCATION AND COORDINATION IN
ACCORDANCE WITH THE NOTES CONTAINED IN THE GENERAL
CONSTRUCTION SECTION OF THIS SHEET.
THE CONTRACTOR SHALL RESTORE ALL DISTURBED VEGETATION IN
KIND, UNLESS SHOWN OTHERWISE.
DEFLECTION OF PIPE JOINTS AND CURVATURE OF PIPE SHALL NOT
EXCEED THE MANUFACTURER'S SPECIFICATIONS. SECURELY CLOSE
ALL OPEN ENDS OF PIPE AND FITTINGS WITH A WATERTIGHT PLUG
WHEN WORK IS NOT IN PROGRESS. THE INTERIOR OF ALL PIPES
SHALL BE CLEAN AND JOINT SURFACES WIPED CLEAN AND DRY
AFTER THE PIPE HAS BEEN LOWERED INTO THE TRENCH. VALVES
SHALL BE PLUMB AND LOCATED ACCORDING TO THE PLANS.
ALL PHASES OF INSTALLATION, INCLUDING UNLOADING, TRENCHING,
LAYING AND BACK FILLING, SHALL BE DONE IN A FIRST CLASS
WORKMANLIKE MANNER. ALL PIPE AND FITTINGS SHALL BE
CAREFULLY STORED FOLLOWING MANUFACTURER'S
RECOMMENDATIONS. CARE SHALL BE TAKEN TO AVOID DAMAGE TO
THE COATING OR LINING IN ANY D.I. PIPE FITTINGS. ANY PIPE OR
FITTING WHICH IS DAMAGED OR WHICH HAS FLAWS OR
IMPERFECTIONS WHICH, IN THE OPINION OF THE ENGINEER OR
OWNER, RENDERS IT UNFIT FOR USE, SHALL NOT BE USED. ANY PIPE
NOT SATISFACTORY FOR USE SHALL BE CLEARLY MARKED AND
IMMEDIATELY REMOVED FROM THE JOB SITE, AND SHALL BE
REPLACED AT THE CONTRACTOR'S EXPENSE.
ALL UTILITY AND STORM DRAIN TRENCHES LOCATED UNDER AREAS
TO RECEIVE PAVING SHALL BE COMPLETELY BACK FILLED IN
ACCORDANCE WITH THE GOVERNING JURISDICTIONAL AGENCY'S
SPECIFICATIONS. IN THE EVENT THAT THE CONTRACT DOCUMENTS
AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN
AGREEMENT, THE MOST STRINGENT SHALL GOVERN.
UNDERGROUND LINES SHALL BE SURVEYED BY A STATE OF FLORIDA
PROFESSIONAL LAND SURVEYOR PRIOR TO BACK FILLING.
CONTRACTOR SHALL PERFORM, AT HIS OWN EXPENSE, ANY AND ALL
TESTS REQUIRED BY THE SPECIFICATIONS AND/OR ANY AGENCY
HAVING JURISDICTION. THESE TESTS MAY INCLUDE, BUT MAY NOT BE
LIMITED TO PRESSURE TESTING, INFILTRATION AND EXFILTRATION,
TELEVISION INSPECTION, AND A MANDREL TEST ON GRAVITY SEWER.
A COPY OF THE TEST RESULTS SHALL BE PROVIDED TO THE UTILITY
PROVIDER, OWNER AND JURISDICTIONAL AGENCY AS REQUIRED.
ALL WATER OR SEWER SERVICE CONNECTIONS, INTERRUPTIONS OR
RELOCATIONS SHALL BE COORDINATED IN ADVANCE WITH FIELD
REPRESENTATIVES FROM THE CITY OF OCALA.
TEMPORARY FACILITIES: THE CONTRACTOR SHALL FURNISH
SANITARY SEWER, WATER AND ELECTRIC POWER AS REQUIRED FOR
THE CONSTRUCTION ACTIVITIES SHOWN IN THE DRAWINGS. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING ALL TEMPORARY
CONNECTIONS AND FOR REMOVING THE SAME CONNECTIONS AT
COMPLETION OF THE PROJECT.
ALL HYDROSTATIC TESTING SHALL BE IN ACCORDANCE WITH AWWA
C600 FOR DUCTILE IRON PIPE AND C605/M23 FOR PVC PIPE.
THE CITY OF OCALA MUST BE NOTIFIED A MINIMUM OF 48 HOURS
PRIOR TO ANY WORK ON EXISTING CITY OF OCALA UTILITIES.
CITY OF OCALA MUST BE NOTIFIED A MINIMUM OF 48 HOURS PIROR
TO UTILITY TESTING. HYDROSTATIC TESTING SHALL BE PER THE
APPLICABLE PROVISIONS AS SET FORTH IN AWWA STANDARDS
(MINIMUM 150 PSI @ 2 HOURS - POTABLE/RECLAIMED AND MINIMUM
100 PSI @ 2 HOURS - FORCE MAINS).
ALL YARD PIPING SHALL BE FULLY RESTRAINED.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
TREE PROTECTION FENCING SHALL BE PLACED AROUND ALL
PROTECTED TREES TO CREATE A PROTECTIVE ROOT ZONE AND
SHALL REMAIN IN PLACE UNTIL SITE CLEARING, LAND ALTERATION,
AND CONSTRUCTION ACTIVITIES ARE COMPLETE.
NATIVE GROUND COVER AND UNDERSTORY VEGETATION EXISTING
WITHIN THE PROTECTED AREA SHALL REMAIN THROUGHOUT
CONSTRUCTION. OTHER DESIGNATED VEGETATION AND INVASIVE
PLANT SPECIES SHALL BE REMOVED ONLY BY MANUAL LABOR
UTILIZING HAND TOOLS, OR BY OTHER METHODS APPROVED BY THE
PROJECT ARBORIST.
FINAL LOCATIONS SHALL BE COORDINATED WITH AND APPROVED BY
THE PROJECT ARBORIST.
NO MATERIALS, EQUIPMENT, SPOIL, WASTE OR WASHOUT WATER MAY
BE DEPOSITED, STORED, OR PARKED WITHIN 20 FEET OF THE TREE
PROTECTION ZONE.
CONSTRUCTION ACTIVITY SHALL NOT DESTROY OR IRREVERSIBLY
HARM THE ROOT SYSTEM OF PROTECTED TREES. POST HOLES AND
TRENCHES LOCATED CLOSE TO PROTECTED TREES SHALL BE
ADJUSTED TO AVOID DAMAGE TO MAJOR ROOTS.
EXCAVATION OR GRADING REQUIRED WITHIN THE PROTECTED AREA
SHALL BE LIMITED TO THREE (3) INCHES OF CUT OR FILL. COORDINATE
WITH PROJECT ARBORIST.
IF ANY DAMAGE TO TREE PROTECTION FENCING SHOULD OCCUR BY
ACCIDENT OR NEGLIGENCE, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR IMMEDIATE REPAIRS.
IF TEMPORARY HAUL OR ACCESS ROADS MUST PASS OVER THE
PROTECTED AREA OF TREES TO BE PRESERVED, A ROAD BED OF SIX
(6) INCHES OF MULCH OR GRAVEL SHALL BE CREATED TO PROTECT
THE SOIL. THE ROAD BED MATERIAL SHALL BE REPLENISHED AS
NECESSARY TO MAINTAIN A SIX (6) INCH ROAD BED AT ALL TIMES.
CONTRACTOR SHALL REMOVE ALL SUCH MATERIALS FROM THE SITE
AS SOON AS TEMPORARY ACCESS IS NO LONGER NECESSARY.
EVERY EFFORT SHALL BE MADE TO WATER THE PRESERVED TREES
AND TRANSPLANTS. CONTRACTOR SHALL IRRIGATE BY HAND OR BY
TEMPORARY IRRIGATION.
IF DAMAGE TO ANY TREE SHOULD OCCUR BY ACCIDENT OR
NEGLIGENCE DURING THE CONSTRUCTION PERIOD, THE PROJECT
ARBORIST SHALL APPRAISE THE DAMAGE AND MAKE
RECOMMENDATIONS TO THE OWNER FOR REPAIR BY THE
CONTRACTOR.
IF ANY TREE DESIGNATED TO BE SAVED IS REMOVED FROM THE SITE
WITHOUT PERMISSION OF THE OWNER'S REPRESENTATIVE, THE
PROJECT ARBORIST SHALL APPRAISE THE TREE AND MAKE
RECOMMENDATIONS TO THE OWNER FOR REPLACEMENT BY THE
CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
REPLACEMENT OF THE TREE AND ANY FEES THAT MAY BE ASSESSED
TO THE OWNER BY THE GOVERNING AGENCY.
TRENCHING EQUIPMENT THAT WILL TURN AT HIGH RPM'S IS
PREFERRED, AND SHALL BE APPROVED BY THE PROJECT ARBORIST.
APPROVED EQUIPMENT WILL BE USED TO PERFORM ALL ROOT
PRUNING OPERATIONS. A MINIMUM DEPTH OF THREE FEET IS
REQUIRED.
THE TRENCH SHALL BE BACKFILLED WITH PREVIOUSLY EXCAVATED
SOIL AND COMPACTED IMMEDIATELY.
WHEN THE TREE ROOT ZONE WILL BE DISTURBED, AFFECTED ROOTS
MUST BE SEVERED BY CLEAN PRUNING CUTS AT THE POINT WHERE
CONSTRUCTION IMPACTS THE ROOTS.
GENERAL CONSTRUCTION NOTES PAVING, GRADING, AND DRAINAGE NOTES WATER, SEWER, AND UTILITY NOTES TREE PROTECTION NOTES DEMOLITION NOTES
N o.
R ev is io ns B y D at e
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
DATE OF FIELD SURVEY: DECEMBER 21, 2023.
SUBJECT TO RIGHTS OF WAY, RESTRICTIONS, EASEMENTS AND RESERVATIONS
OF RECORD.
UNLESS OTHERWISE SHOWN, UNDERGROUND IMPROVEMENTS NOT LOCATED.
PUBLIC RECORDS NOT SEARCHED BY R.M. BARRINEA & ASSOCIATES, INC.
BEARINGS AND STATE PLANE COORDINATES DEPICTED HEREON ARE GRID, WEST
FLORIDA ZONE, NAD-83 (CORS96) EPOCH:2002.0000), BASED ON TRIMBLE VIRTUAL
REFERENCE STATION NETWORK.
VERTICAL DATUM BASED ON ST. JOHNS RIVER MANAGEMENT BENCHMARK
17-14-010-0 STATION NUMBER 103 WITH AN ELEVATION OF 122.70', NAVD-88.
ORIENTATION FOR THE IMPROVEMENTS SHOWN HEREON SHOULD NOT BE USED
TO RECONSTRUCT BOUNDARY LINES.
ADDITIONS OR DELETIONS TO SURVEY MAPS BY OTHER THAN THE SIGNING PARTY
OR PARTIES IS PROHIBITED WITHOUT WRITTEN CONSENT OF THE SIGNING PARTY
OR PARTIES.
THIS SURVEY DEPICTS THE PROPERTY AS IT EXISTED ON THE SURVEY DATE, NOT
NECESSARILY THE SIGNATURE DATE.
THIS SURVEY HAS BEEN PREPARED FOR THE EXCLUSIVE BENEFIT OF THE
PARTY(IES) NAMED HEREON, AND SHALL NOT BE DUPLICATED OR RELIED UPON BY
ANY OTHER INDIVIDUAL OR ENTITY WITHOUT AUTHORIZATION FROM R.M.
BARRINEA & ASSOCIATES, INC.
SURVEY NOTES
SURVEY LEGEND
EXISTING
WELL NO 7
FUTURE 4.5 MG
CONCENTRATE
GST NO. 2
FUTURE 4.5 MG
CONCENTRATE
GST NO. 1
3MG FINISHED
WATER GST NO. 1
FUTURE 3MG
FINISHED WATER
GST NO. 3
FUTURE
CONCENTRATE PUMP
STATION
FUTURE CHEMICAL
STORAGE AND METERING
FUTURE CLEARWELL
AND DEGASIFIERS
FUTURE HIGH SERVICE
PUMP STATION ROOM
FUTURE NF
PROCESS BUILDING
FUTURE
GENERATORS AND
FUEL TANKS
FUTURE ACCESS
DRIVES
FUTURE 3MG
FINISHED WATER
GST NO. 2
EXISTING WELL
NO 6 BUILDING
FUTURE
ELECTRICAL
BUILDING NO. 3
FUTURE
CONCENTRATE
DISCHARGE PIPING
FUTURE FINISHED WATER
DISTRIBUTION PIPING
FUTURE RAW
WATER FEED
PIPING
EXISTING
WELL NO 10
FUTURE ELECTRICAL
BUILDING NO. 2
LIMITS OF CONSTRUCTION
15' ACCESS PATH
AROUND TANK
0 15' 60'30'
GRAPHIC SCALE IN FEET
NORTH
SHEET NUMBER
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
KH
A
PR
O
JE
C
T
LI
C
EN
SE
D
P R
O
FE
SS
IO
N
AL
D
AT
E:
LI
C
EN
SE
N U
M
BE
R
D
AT
E
SC
AL
E:
A
S
SH
O W
LE
Y-
HO
RN
A
ND
A
SS
OC
IA
TE
S, IN
C.
W W
W .K
IM
LE
Y-
HO
RN
.C
OM
RE
GI
ST
RY
N
.. 3
PR
EP
AR
ED
F O
R
A u to d e sk
D o c s:
O c a la
W T P O c a la
W T P
(P ro c e ss
S h e e ts rv t
A u to d e sk
D o c s:
O c a la
W T P O c a la
W T P
(P ro c e ss
S h e e ts rv t
FE
BR
U
AR
Y
C
IT
Y O
F O
C
AL
A, F
LO
R
ID
A
O C
AL
A
W
AT
ER
TR
EA
TM
EN
T
PL
AN
T
SA
VA
N N
AH
R
AE
M
ID
D
LE
TO
N
SM
IT
H
, P .E
FL
BID SET
S E
TH
S
TR
EE
T, S
UI
TE
, O
CA
LA
, F L
PH
O
NE
: 3
-4
-3
C01
SR
M
S
R
LL
LL
/A
G
SI
TE
P
LA
N
N o.
R ev is io ns B y D at e
1" = 30'-0"
OVERALL BUILDOUT GST 1 SITE PLAN
PROPOSED 3MG
FINISHED WATER
GST NO. 1
FF = 124.00
N: 1750614.557 E: 617398.272
EXISTING DRIVEWAY
W W
W .K
IM
LE
Y- H
O R
N .C
O M
R
EG
IS
TR
Y
N O
. 3
S E
TH
S
TR
EE
T, S U
IT
E
0, O C
AL
A, F
LO
R
ID
A
PH
O
N E:
-4
-3
K:
\O
C A_
U til tie s\
O ca la \1
-O ca la W
TP
D es ig n\
C
AD
D \P la ns he et s\ C
G
ST
N
O . 1
H O
R
IZ
O N
TA
L
C O
N
TR
O L
PL
AN
.d w g, L ay ou t:C
G
ST
N O
. 1 H
O R
IZ
O
N
TA
L C
O N
TR
O
L
PL
AN
Fe b
, 2 ja co b.
co ur tn ey
XR
EF
S:
x Bo rd er
-1 k h-ad dr es s-oc a D ra w in gD at a xB as e-xO ve ra ll xS ur ve y xH at ch -1
S ite
Pl an
N ot es xB as e-
G
ST
-1 -1
O C
AL
A
W
AT
ER
TR
EA
TM
EN
T
PL
AN
T
PR
EP
AR
ED
F O
R
C
IT
Y O
F O
C
AL
A
BI
D S
ET
N
O T
FO
R
C O
N
ST
R U
C
TI
O N
-1
9-
JE
C
NORTH
G
ST
N O
. 1 H
O R
IZ
O
N
TA
L C
O N
TR
O
L
PL
AN
C02
KH
A
KH
A
NOTES:
- ALL WORK AND MATERIALS SHALL COMPLY WITH FDOT STANDARD
SPECIFICATIONS AND CITY OF OCALA LAND DEVELOPMENT CODE.