ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_Addendum_2.pdf
PDF 115 KB Posted
- Solicitation number
- ITB# ENG/250425
- Issued by
- Marion County, Orlando City, Florida
About this file
This document is Addendum #2 for the City of Ocala's Invitation to Bid (ITB# ENG/250425) for the Water Treatment Plant No. 2 GST No. 1 Construction project. The addendum, dated June 25, 2024, introduces several key updates for bidders, including the addition of new exhibits such as the Geotechnical Investigation Report and Plan Set #2, and a requirement that the Notice to Proceed (NTP) must be signed within 90 days of City Council approval. The addendum also provides an electrical information clarification, specifying that no electrical conduit or wiring is needed beyond grounding and lightning protection, with additional instruments and future conduits to be installed under a separate project.
The addendum does not introduce new pricing terms or funding details, but serves to provide supplemental information and clarifications to potential bidders for the water treatment plant construction project. The document is issued by Eileen Marquez, Senior Buyer, and is part of the solicitation process for constructing a Three Million Gallon (3MG) Ground Storage Tank at Water Treatment Plant #2 located at 3744 S Pine Avenue in Ocala, Florida. The addendum ensures that all bidders have the most up-to-date information for preparing their submissions for this municipal infrastructure project.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum # 2
Date: June 25, 2024
To: All bidders
From: Eileen Marquez, Senior Buyer
Solicitation Number: ITB# ENG/250425
Solicitation Title: Water Treatment Plant No. 2 GST No. 1 Construction
SECTION 1. SOLICITATION ADDITIONS, CLARIFICATIONS AND CORRECTIONS
1.1 The following exhibits have been added:
• NEW 3.25.25 Exhibit I - Geotechnical Investigation Report- Ocala WTP 2NEW Exhibit G -Plan Set #2.
• NEW 3.25.25 Exhibit J - Confirmation of Geotechnical Recommendation - Ocala WTP 2.
• NEW 3.25.25 Exhibit I - Geotechnical Investigation Report- Ocala
WTP 2.
1.2 The following exhibits have been added:
• Notice to Proceed (NTP) must be signed within 90 days of City Council approval.
1.3 Electrical information clarification:
There is no electrical conduit or wiring needed beyond the grounding and lightning protection. Additional instruments and future conduits up the tank will be installed under a future separate project.
SECTION 1. SOLICITATION ADDITIONS, CLARIFICATIONS AND CORRECTIONS
File details come from the government source that posted it. Updated .