ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_NEW_Exhibit_H_-_Electrical_Plan__2.pdf

PDF 2 MB Posted

Attached to
Water Treatment Plant No. 2 GST No. 1 Construction
Solicitation number
ITB# ENG/250425
Issued by
Marion County, Orlando City, Florida

About this file

These electrical engineering design documents are for the City of Ocala, Florida's Water Treatment Plant 2 project, specifically focusing on electrical notes, symbols, abbreviations, lightning protection, and grounding plans for a 3 Million Gallon (3MG) Ground Storage Tank. The documents, prepared by Kimley-Horn and Associates in March 2025, include detailed technical drawings such as electrical symbols legend (E01), a lightning protection and grounding plan for the finished water ground storage tank (E77), and electrical details (E91). The drawings provide comprehensive technical specifications for electrical infrastructure, including plan symbols, control diagram symbols, single line diagram symbols, grounding plate details, air terminal details, and counterpose conductor connection specifics.

The electrical design documents are part of a larger construction project (ITB# ENG/250425) for building a ground storage tank at Water Treatment Plant #2, located at 3744 S Pine Avenue in Ocala, Florida. The project requires a licensed Florida General Contractor with at least five years of experience in water ground storage tank construction. The bid is to be submitted on a lump sum basis, with a 5% bid bond requirement. The contractor will be responsible for providing all materials, labor, equipment, on-site construction power, wiring, and necessary facilities. The materials and workmanship will be warranted for three years, with the warranty period commencing upon final project acceptance. The City will award the contract to the lowest bidder meeting all outlined requirements, with bid prices to be honored for 90 days after solicitation award.

View the file

Other files

File Type Posted
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_SIGN-IN_SHEET.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_Addendum_2.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_NEW_3.25.25_Exhibit_I_-_Geotechnical_Investigation_Report-_Ocala_WTP_2.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_NEW_3.25.25_Exhibit_K_-_33_16_00_-_3.0_MG_Prestressed_Concrete_Tank.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_NEW_3.25.25_Exhibit_J_-_Confirmation_of_Geotechnical_Recommendation_-_Ocala_WTP_2.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_Addendum_1.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_NEW_Exhibit_G_-_Plan_Set__2.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_REV_3.14.25_Exhibit_F_-_Price_Proposal_Rev1.xlsx XLSX spreadsheet
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_Exhibit_F_-_Price_Proposal.xlsx XLSX spreadsheet
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_Exhibit_A_-_Scope_of_Work.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_Exhibit_E_-_Executed_Grant.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_Exhibit_B_Plan_Set.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_Exhibit_D_-_Grant_Clauses.pdf PDF
ITB_ENG250425_Water_Treatment_Plant_No._2_GST_No._1_Construction_Updated_-_Exhibit_C_Electrical_Plan.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ɸ

SHEET NUMBER

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

KH

A

PR

O

JE

C

T

LI

C

EN

SE

D

P R

O

FE

SS

IO

N

AL

D

AT

E:

LI

C

EN

SE

N U

M

BE

R

D

AT

E

SC

AL

E:

A

S

SH

O W

N

K

IM

LE

Y-

HO

RN

A

ND

A

SS

OC

IA

TE

S, IN

C.

W W

W .K

IM

LE

Y-

HO

RN

.C

OM

RE

GI

ST

RY

N

O.

PR

EP

AR

ED

F O

R

M

AR

C H

ST

EP

H

EN

E

. B

AI

LE

Y, P .E

FL

S E

TH

S

TR

EE

T, S

UI

TE

O

CA

LA

, F L

PH

O

NE

: 3

-4

-3

D D

R R

M

SE

B

N o.

R ev is io ns

B y

D at e

BID SET

C

IT

Y O

F O

C

AL

A, F

LO

R

ID

A

O C

AL

A

W

AT

ER

TR

EA

TM

EN

T

PL

AN

T

EL

EC

TR

IC

AL

N

O

TE

S, SY

M

BO

LS

AB

BR

EV

IA

TI

O

N S

E01

X:

\A

C

TI

VE

-C

C \A ct iv e Pr oj ec ts \K im le y H or n\

O ca la \W

TP

G

ST

\0

4.

_G

ST

B id s et

\d w gs \E

N

O

TE

S.

dw g, X

, 3

/3 /2

9:

:2

AM

, R

M ee ks

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

KH

A

PR

O

JE

C

T

LI

C

EN

SE

D

P R

O

FE

SS

IO

N

AL

D

AT

E:

LI

C

EN

SE

N U

M

BE

R

D

AT

E

SC

AL

E:

A

S

SH

O W

LE

Y-

HO

RN

A

ND

A

SS

OC

IA

TE

S, IN

C.

W W

W .K

IM

LE

Y-

HO

RN

.C

OM

RE

GI

ST

RY

N

O.

PR

EP

AR

ED

F O

R

M

AR

C H

ST

EP

H

EN

E

. B

AI

LE

Y, P .E

FL

S E

TH

S

TR

EE

T, S

UI

TE

O

CA

LA

, F L

PH

O

NE

: 3

-4

-3

D D

R R

M

SE

B

N o.

R ev is io ns

B y

D at e

BID SET

C

IT

Y O

F O

C

AL

A, F

LO

R

ID

A

O C

AL

A

W

AT

ER

TR

EA

TM

EN

T

PL

AN

T

E77

FI

NI

SH

ED

W

AT

ER

G

ST

NO

. 2

LI

GH

TN

IN

G

PR

OT

EC

TI

ON

GR

OU

ND

IN

G

PL

AN

X:

\A

C

TI

VE

-C

C \A ct iv e Pr oj ec ts \K im le y H or n\

O ca la \W

TP

G

ST

\0

4.

_G

ST

B id s et

\d w gs \E

M G

F W

G

ST

N O

.2 .d w g, X

, 3 /3

/2

9:

:2

AM

, R M

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

KH

A

PR

O

JE

C

T

LI

C

EN

SE

D

P R

O

FE

SS

IO

N

AL

D

AT

E:

LI

C

EN

SE

N U

M

BE

R

D

AT

E

SC

AL

E:

A

S

SH

O W

LE

Y-

HO

RN

A

ND

A

SS

OC

IA

TE

S, IN

C.

W W

W .K

IM

LE

Y-

HO

RN

.C

OM

RE

GI

ST

RY

N

O.

PR

EP

AR

ED

F O

R

M

AR

C H

ST

EP

H

EN

E

. B

AI

LE

Y, P .E

FL

S E

TH

S

TR

EE

T, S

UI

TE

O

CA

LA

, F L

PH

O

NE

: 3

-4

-3

D D

R R

M

SE

B

N o.

R ev is io ns

B y

D at e

BID SET

C

IT

Y O

F O

C

AL

A, F

LO

R

ID

A

O C

AL

A

W

AT

ER

TR

EA

TM

EN

T

PL

AN

T

EL

EC

TR

IC

AL

D

ET

AI

LS

SH

EE

T

E91

X:

\A

C

TI

VE

-C

C \A ct iv e Pr oj ec ts \K im le y H or n\

O ca la \W

TP

G

ST

\0

4.

_G

ST

B id s et

\d w gs \E

E

LE

C

D

TL

S- 4.

dw g, X

, 3 /3

/2

9:

:3

AM

, R M

Sheets and Views
E01 NOTES-22 X 34
E77 2MG FW GST NO.2-22 X 34
E91 ELEC DTLS-4-22 X 34
This item has been electronically signed and sealed by Stephen E. Bailey, P.E. using a Digital Signature. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
2025-03-04T09:21:42-0500
L: Cooper City, O: Bailey Engineering Consultants, Inc
Stephen E. Bailey, P.E.
I am approving this document.
This item has been electronically signed and sealed by Stephen E. Bailey, P.E. using a Digital Signature. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
2025-03-04T09:21:46-0500
L: Cooper City, O: Bailey Engineering Consultants, Inc
Stephen E. Bailey, P.E.
I am approving this document.
This item has been electronically signed and sealed by Stephen E. Bailey, P.E. using a Digital Signature. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
2025-03-04T09:22:20-0500
L: Cooper City, O: Bailey Engineering Consultants, Inc
Stephen E. Bailey, P.E.
I am approving this document.

File details come from the government source that posted it. Updated .