UNH Memorial Union Building Elevator Controller Replacements
Open State & local contract opportunity Posted
- Solicitation number
- 2120271006
- State
- New Hampshire
- Responses due
Opportunity facts
Updated .
About this opportunity
USNH, representing University of New Hampshire Facilities Project Management, is soliciting bids for Memorial Union Building elevator controller replacements at 83 Main Street, Durham, New Hampshire, with an informational meeting on November 17, 2026 at 9:00 a.m. at the MUB front entrance and bids due December 11, 2026 at 12:00 p.m. EST. The controlling restriction is equipment sourcing: elevator equipment must be manufactured by Canton Elevator, ESCO Elevator Products, Elevator Equipment Company, Inc., Motion Control, G.A.L. Manufacturing Corporation, EID, or PTL Equipment Co., Inc., "or equal as approved by the owner." No set-aside or preference program is identified.
The scope covers renovation of two oil-hydraulic elevators: an East unit (4,500 pounds, three stops) and a West unit (2,000 pounds, four stops), both at 150 feet per minute. Work includes replacing controllers, power units, oil lines, wiring, car doors, door operators, and car operating panels, with the required controllers being microprocessor-based, non-proprietary, and serviceable by any recognized service company. Electrical work includes shunt-trip disconnects and fire alarm integration. The base bid is paired with two alternates for complete East and West car enclosure replacements. The installer must show at least three comparable installations within 50 miles of the site completed at least two years before bidding, and must maintain a service organization within 50 miles for at least five years before bidding. Bidders must visit the site before submitting. Qualifications require Document 00420 Statement of Qualifications and project data forms for at least three similar projects completed within the last three years.
Bid security is a bid bond of 5% of the base bid. Performance and payment bonds are each required at 100% of the contract sum. Insurance requires commercial general liability of $2 million aggregate and $1 million per occurrence, automobile liability of $1 million, employer's liability of $500,000, professional liability of $1 million per claim and $2 million aggregate, and $2 million excess liability. Subcontracts at or above 10% of the base bid must be listed on the sub-bid list. The estimated contract value is not stated. Construction runs May 17, 2027 through August 20, 2027, with the East elevator completed before the West, and the 12-month warranty runs from final acceptance. No incumbent is identified.
Questions are due November 24, 2026 at 12:00 p.m., with responses by December 4, 2026. Preliminary bid results post within three business days of opening, and bids remain firm for 30 calendar days. Award goes to the lowest, most responsive and responsible qualified bidder, with written notice within 30 days of opening and an award announcement anticipated the week of December 14, 2026. Karen Sayers serves as USNH Owner's Agent, with Joe Morrissey of Elevator Consulting Associates and Mark Gianniny of Portsmouth Architects, PLLC as design professionals.
Opportunity text
USNH, representing University of New Hampshire Facilities Project Management (UNH FPM), is requesting bids for the Memorial Union Building Elevator Controller Replacements.