Appendix A - Project Data Form.pdf
PDF 121 KB Posted
- Solicitation number
- 2120271006
- Issued by
- New Hampshire
About this file
This file is Appendix A - Project Data Form, a template document used by contractors to provide detailed information about previous projects when bidding on state and local contract opportunities, specifically in this case the University of New Hampshire Memorial Union Building Elevator Controller Replacements project. The form requires contractors to identify the delivery method (design/bid/build, design/build, or CM at risk), provide comprehensive project details including the project name and address, and document key stakeholders such as the owner, architect of record, and engineer of record with their respective contact information. Contractors must also list employees who worked on the reference project and specify their roles on the proposed project, describe the project in detail with emphasis on similarities to the proposed work, document the original contract amount, change orders, and final contract amount, explain any change orders exceeding 5% of the original contract value, assess project complexity, and provide the required construction duration, notice to proceed date, substantial completion date, and final completion date.
The form further requires contractors to describe any coordination required with other separately hired contractors working in adjacent areas, provide additional comments or supporting information, and include project photographs highlighting complexities, site constraints, and architectural details. This document serves as a qualifications and experience submission form that allows government entities to evaluate contractor capability and experience on similar projects. The form is blank and unfilled, indicating it is a template awaiting completion by contractors submitting bids for the elevator controller replacement project. No pricing terms, set-asides, incumbent information, funding amounts, or specific contract award dates are specified in this template document.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX A - PROJECT DATA FORM
CONTRACTOR: ___________________________________________________________________
DELIVERY METHOD: design/bid/build; design/build; CM at risk
Project Name: ______________________________________________________________________________
Project Address: ______________________________________________________________________________
Owner’s Name: _______________________________________________________________________________
Owner’s Address: ______________________________________________________________________________
Owner’s Contact: _________________________________ Phone Number: _________________________
Owner’s Contact E-mail Address: _________________________________________________________________
Architect of Record: __________________________________________________________________________
Architect’s Address: __________________________________________________________________________
Architect’s Contact: ________________________________ Phone Number: _________________________
Architect’s Contact E-mail Address: _______________________________________________________________
Engineer of Record: __________________________________________________________________________
Engineer’s Address: __________________________________________________________________________
Engineer’s Contact: ________________________________ Phone Number: _________________________
Engineer’s Contact E-mail Address: ________________________________________________________________
Contractor’s Employees who worked on this Project
(Note if these individuals will be working on the proposed project and in what capacity)
Employee Name Position Held on Project Will work on proposed project as (fill in the blank)
1. Project Description: (please emphasize similarities to proposed project):
2. Construction Costs:
Original Contract Amount: $____________________
Change Order Total: $____________________
Final Contract Amount: $____________________
If change order total exceeds 5% of the original contract amount, please explain:
3. Project Complexity: Attach additional page(s) if needed.
4. Project Schedule: Required/Contracted Construction Duration: _________________________________
Notice to Proceed Date: __________________________________________________
Date of Substantial Completion: ___________________________________________
Date of Final Completion (final payment): ___________________________________
5. Coordination: If applicable, describe specific circumstances surrounding the requirement that the general contractor coordinate work with other contractors hired separately by the Owner working in adjacent buildings or roads.
6. Additional Comments/Information: In addition to filling out this form completely, please feel free to attach other project information hereto.
7. Project Photograph(s): Please include one or more photographs of the subject project that emphasize project complexities, site constraints, architectural details and the like.
| undefined: |
| designbidbuild: Off |
| designbuild: Off |
| CM at risk: Off |
| Project Name: |
| Project Address 1: |
| Project Address 2: |
| Owners Name: |
| Owners Address 1: |
| Owners Address 2: |
| Owners Contact: |
| Phone Number: |
| Owners Contact Email Address: |
| Architect of Record: |
| Architects Address 1: |
| Architects Address 2: |
| Architects Contact: |
| Phone Number_2: |
| Architects Contact Email Address: |
| Engineer of Record: |
| Engineers Address 1: |
| Engineers Address 2: |
| Engineers Contact: |
| Phone Number_3: |
| Engineers Contact Email Address: |
| Employee NameRow1: |
| Position Held on ProjectRow1: |
| Will work on proposed project as fill in the blankRow1: |
| Employee NameRow2: |
| Position Held on ProjectRow2: |
| Will work on proposed project as fill in the blankRow2: |
| Employee NameRow3: |
| Position Held on ProjectRow3: |
| Will work on proposed project as fill in the blankRow3: |
| Employee NameRow4: |
| Position Held on ProjectRow4: |
| Will work on proposed project as fill in the blankRow4: |
| Project Description please emphasize similarities to proposed project 1: |
| Project Description please emphasize similarities to proposed project 2: |
| Project Description please emphasize similarities to proposed project 3: |
| Project Description please emphasize similarities to proposed project 4: |
| Project Description please emphasize similarities to proposed project 5: |
| Project Description please emphasize similarities to proposed project 6: |
| Project Description please emphasize similarities to proposed project 7: |
| Project Description please emphasize similarities to proposed project 8: |
| Project Description please emphasize similarities to proposed project 9: |
| undefined_2: |
| undefined_3: |
| undefined_4: |
| If change order total exceeds 5 of the original contract amount please explain 1: |
| If change order total exceeds 5 of the original contract amount please explain 2: |
| If change order total exceeds 5 of the original contract amount please explain 3: |
| If change order total exceeds 5 of the original contract amount please explain 4: |
| Project Complexity Attach additional pages if needed 1: |
| Project Complexity Attach additional pages if needed 2: |
| Project Complexity Attach additional pages if needed 3: |
| Project Complexity Attach additional pages if needed 4: |
| RequiredContracted Construction Duration: |
| Notice to Proceed Date: |
| Date of Substantial Completion: |
| Date of Final Completion final payment: |
| or roads 1: |
| or roads 2: |
| or roads 3: |
| or roads 4: |
| or roads 5: |
| or roads 6: |
File details come from the government source that posted it. Updated .