RSOQ for 2027 Water & Stormwater Design Engineering Services
Open State & local contract opportunity Posted
- Solicitation number
- PCMC27039-WAT
- State
- Utah
- Responses due
Opportunity facts
- NIGP codes
- 92536 Engineering Services (Not Otherwise Classified)
- 92517 Civil Engineering
- 93437 Irrigation Systems Maintenance And Repair
- 92652 Impact Studies, Environmental
- 91841 Energy Conservation Consulting
- 90656 Landscape Architecture
- 90775 Site Assessment And Site Field Observation
- 92561 Land Development And Planning/Engineering
- 92597 Water Supply, Treatment, And Distribution/Engineering
- UNSPSC codes
- 81101517 Landscape architecture and design service
- 81101525 Sediment control engineering
- 81101528 Stormwater engineering
- 81100000 Professional engineering services
- 81101500 Civil engineering
- 81101516 Energy or utility consulting service
- 81101520 Hydrology assessment service
- 70171802 Storm water drainage
- 77101505 Environmental monitoring
Opportunity details come from utah.bonfirehub.com. Updated .
About this opportunity
Park City Municipal Corporation (PCMC), a Utah municipal corporation, is requesting statements of qualifications for professional water and stormwater infrastructure design engineering services covering six Water Department Capital Improvement Plan projects, with responses due October 30, 2026.
The scope encompasses preparation of construction plans, technical specifications, construction cost estimates, and project-specific design services for six distinct initiatives: Royal Street West Waterline Replacement; Equestrian Court Stormwater Redesign; Estates Phase II Four Lakes Waterline Replacement; Woodside/Norfolk/Sampson Transmission Line Replacement (approximately 3,800 linear feet divided into two independently constructible phases, requiring survey, geotechnical investigation, and evaluation of trenchless/bored installation methods for mountainside terrain); Park City Stormwater Infrastructure Improvement (Park Meadows and Aerie Drive segments totaling approximately 3,275 linear feet of condition assessment, re-lining, and new storm drain work with design deadline March 31, 2027); and Park Avenue Waterline & Stormwater Replacement (approximately 4,600 linear feet of existing waterline replacement with 10-inch C-900 PVC pipe, 4,500 linear feet of existing storm drain replacement plus 1,150 linear feet of new storm drain, fiber conduit installation, and geotechnical investigation for mining-impacted soils, organized into approximately three construction phases).
The Design Professional Services Agreement template specifies compensation as a fixed fee not to exceed a stated dollar amount, with monthly invoicing and payment due within 30 days. The design professional must maintain commercial general liability ($1,000,000 per occurrence / $3,000,000 aggregate), automobile liability ($2,000,000 combined single limit), professional liability ($1,000,000 per occurrence), and workers' compensation insurance. The contract term becomes effective upon execution with optional extension upon 30 days' prior written notice. Either party may terminate with 30 days' notice, or PCMC may terminate for cause with three days' notice for cure. Utah law governs the agreement with venue in Summit County, Utah courts. Additional work beyond the defined scope requires written approval from PCMC.
Opportunity text
Professional Water and Stormwater Infrastructure Design Engineering Services for six Water Department CIP projects, including preparation of construction plans, technical specifications, construction cost estimates, and other project-specific design services identified in this RSOQ and the attached Project Information Sheets.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity