This is a Request for Statement of Qualifications (RSOQ) issued by a Utah water department for professional design engineering services related to six Water Department Capital Improvement Plan (CIP) projects. The department seeks qualified engineering firms to provide comprehensive water and stormwater infrastructure design services, including the preparation of construction plans, technical specifications, construction cost estimates, and project-specific design deliverables as detailed in the attached Project Information Sheets. The RSOQ outlines specific requirements for each of the six projects, with responses required by the stated deadline to allow for evaluation and selection of qualified consultants. The contract term and any renewal options are contingent upon individual project needs and scope requirements.
The pricing structure and fee arrangements are to be determined through the qualification-based selection process outlined in the RSOQ. Specific funding sources, budget allocations, and project-specific financial requirements are detailed within the Project Information Sheets accompanying this document. The selection process will evaluate firms based on qualifications, relevant experience, project team capabilities, and other criteria specified in the evaluation methodology. Interested firms should review all project information sheets to understand the scope, complexity, and requirements of each of the six projects to assess their capability to deliver the requested design engineering services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RSOQ Template 6-26 1
Park City Municipal Corporation (“PCMC” or “City”)
REQUEST FOR STATEMENTS OF QUALIFICATIONS (“RSOQ”)
FOR
2027 – WATER & STORMWATER INFRASTRUCTURE
DESIGN ENGINEERING SERVICES
Respondents and their agents are instructed not to contact or seek references from City employees, agents or contractors of the City, selection committee members, the Mayor’s office or staff, members of the City Council and Planning Commission, or attempt to externally manipulate or influence the procurement process in any way, other than through the instructions contained herein, from the date of release of this RSOQ to the date of execution of the agreement resulting from this solicitation. City, in its sole discretion, may disqualify a
Respondent for violation of this provision.
RSOQ Template 6-26 2
REQUEST FOR STATEMENTS OF QUALIFICATIONS
PCMC is inviting statements of qualifications (“SOQs”) from qualified professional engineering firms
(“Respondents”) to provide Water and Stormwater Infrastructure Design Engineering Services for six planned water and stormwater infrastructure projects. Respondents may submit qualifications for one, multiple, or all six projects.
SOQ DUE: By 5:00 p.m. on Thursday, October 29, 2026.
Submit SOQs electronically via Utah Public Procurement Place (“U3P”). The SOQs will be opened after the submission deadline.
RSOQ AVAILABLE: The RSOQ will be available on Thursday, October 8, 2026, on the U3P website. Any modifications to the RSOQ or responses to questions submitted will be added as an addendum to the
RSOQ posted on U3P. It is the responsibility of Respondents to regularly check for addenda.
QUESTIONS: All questions regarding this RSOQ must be submitted in writing to U3P by 4:00 p.m. on
Thursday, October 22, 2026 . Please do not submit the same question multiple times.
PROJECT LOCATION: Park City, Utah
PROJECT DESCRIPTION (brief): Professional Water and Stormwater Infrastructure Design Engineering
Services for six Water Department CIP projects, including preparation of construction plans, technical specifications, construction cost estimates, and other project-specific design services identified in this
RSOQ and the attached Project Information Sheets.
PROJECT DEADLINE: Final, bid-ready design documents for the Park Avenue Waterline & Stormwater
Replacement Project and Park City Stormwater Infrastructure Improvements Project shall be completed no later than March 31, 2027. Final, bid-ready design documents for all other projects shall be completed no later than January 31, 2027.
OWNER: Park City Municipal Corporation
P.O. Box 1480
Park City, UT 84060
CONTACT: Harrison Holley – Public Utilities Engineer harrison.holley@parkcity.gov
SOQs will remain valid for 90 days after submission. PCMC reserves the right to reject any or all SOQs received for any reason. Furthermore, PCMC reserves the right to change dates or deadlines related to this RSOQ. PCMC also reserves the right to waive any informality or technicality in SOQs received when in the best interest of PCMC.
RSOQ Template 6-26 3
I. Introduction.
Park City Municipal Corporation (“PCMC” or “City”) is seeking statements of qualifications
(“SOQs”) from qualified professional engineering firms to provide design engineering services for six planned water and stormwater infrastructure projects identified in the Water
Department's Capital Improvement Program (“CIP”).
The projects are part of PCMC's ongoing capital improvement and asset management programs to replace aging and failure-prone infrastructure, improve system reliability, and address other identified water and stormwater infrastructure needs. The six projects vary in length, complexity, existing conditions, and required supporting services. Project-specific information is provided in the Project Information Sheets attached to this RSOQ.
PCMC intends to complete design of the projects during the fall and winter of 2026–2027. Final, bid-ready design documents for the Park Avenue Waterline & Stormwater Replacement Project and Park City Stormwater Infrastructure Improvements Project shall be completed no later than
March 31, 2027. Final, bid-ready design documents for all other projects shall be completed no later than January 31, 2027.
Respondents may submit qualifications for one, multiple, or all six projects and are not required to submit qualifications for all projects to be considered. Respondents shall clearly identify the specific project(s) for which they wish to be considered.
Because multiple projects will be designed concurrently, Respondents shall clearly identify the number and specific combination of projects they have the staffing and capacity to successfully complete by the applicable project deadlines. A Respondent seeking consideration for multiple projects shall identify whether it has the capacity to perform all identified projects concurrently and, if not, identify its preferred project(s) and the maximum workload it can accept.
PCMC anticipates entering into one or more Design Professional Services Agreements, substantially in the form attached as Exhibit A, with the selected Respondent(s).
II. Scope of Project.
A. General Scope
PCMC is seeking professional design engineering services to develop complete, bid-ready design documents for six water and stormwater infrastructure projects. Each project is described separately in the Project Information Sheets attached to this RSOQ.
The Project Information Sheets identify, as applicable, the approximate project limits and length, anticipated infrastructure improvements, existing infrastructure, known site constraints, fiber-optic improvements, geotechnical investigation requirements, mining-impacted soils or environmental considerations, survey requirements, permitting considerations, and other project-specific design requirements.
RSOQ Template 6-26 4
The selected Design Professional(s) shall provide the professional services necessary to develop the assigned project(s) from preliminary design through final construction documents. Unless specifically modified by a Project Information Sheet, the anticipated scope of services for each project includes the following:
1. Project Management & Coordination
Coordinate the work of the project team and subconsultants; maintain the project schedule; perform internal quality assurance/quality control; coordinate with PCMC staff; and manage the integration of all project elements into the final design.
2. Project Kickoff and Site Reconnaissance
Participate in a project kickoff meeting with PCMC staff and conduct a site visit for each assigned project to review existing conditions, utilities, access, anticipated construction constraints, restoration requirements, and other project-specific considerations.
3. Existing Information Review
Review available information provided by PCMC, which may include GIS utility data, record drawings, aerial photography, LiDAR/topographic information, property and right-of-way information, existing utility information, water system information, maintenance history, and other available project records.
The Design Professional shall identify additional information necessary to complete the design and coordinate collection of that information with PCMC.
4. Survey & Base Mapping
Provide the survey, mapping, utility research and locating, and other field information necessary to complete the design when identified as required in the applicable Project
Information Sheet. Survey shall be prepared in PCMC's required coordinate system and shall provide sufficient information to develop accurate plan and profile drawings and construction documents.
Where a Project Information Sheet indicates that PCMC-provided aerial photography, LiDAR, existing survey, or other mapping may be used in lieu of or to supplement field survey, Respondents shall account for those conditions in their SOQ.
5. Geotechnical & Environmental Investigation
Where identified in the applicable Project Information Sheet, provide geotechnical and/or environmental investigation necessary to support the design. Services may include evaluation of subsurface soil and groundwater conditions, trenching and pipeline installation recommendations, subsurface exploration, laboratory testing, evaluation of mining-related contaminants or other environmental conditions, and preparation of soils handling or other project-specific recommendations.
RSOQ Template 6-26 5
6. Design Drawings
Prepare complete construction drawings for replacement and/or installation of the proposed water, stormwater, and associated infrastructure identified in the applicable
Project Information Sheet. Design shall conform to current applicable PCMC design standards and specifications and other applicable City requirements. Drawings shall include, as applicable:
• Cover sheet, general notes, legends, symbols, and sheet index;
• Existing conditions and survey control;
• Overall project/key plan;
• Waterline plan and profile drawings, where applicable;
• Stormwater plan and profile drawings, drainage structures, connections, and other stormwater improvements, where applicable;
• Connections to existing water infrastructure;
• Isolation valves, fire hydrants, water services, meter vaults, and other appurtenances;
• Utility crossings and conflict resolution;
• Surface restoration;
• Traffic control or construction phasing considerations, where appropriate;
• Fiber-optic conduit, pull boxes, and related infrastructure where identified in the applicable Project Information Sheet;
• PCMC standard details; and
• Project-specific supplemental details necessary for construction.
Design documents shall be submitted to PCMC at approximately 60%, 90%, and Final
(100%) design milestones for review and comment.
7. Project Phasing
Where identified in the applicable Project Information Sheet, the Design Professional shall develop the project as multiple construction phases. Anticipated phase limits will be identified by PCMC in the Project Information Sheet and shall be confirmed and refined during design in coordination with PCMC.
Each phase shall constitute a logical and independently constructible portion of the overall project. The design and bid documents shall be organized to provide PCMC flexibility to bid and award construction by phase, including the ability to award an individual phase, multiple phases, or the entire project, as determined by PCMC based on available funding, bid results, project priorities, or other considerations.
The Design Professional shall coordinate the phases to ensure that improvements constructed under an earlier phase do not conflict with or unnecessarily duplicate subsequent phases. Design shall consider appropriate phase limits, water system connections, temporary or permanent terminations, system operation, restoration, and
RSOQ Template 6-26 6 other requirements necessary to allow each phase to function independently until subsequent phases are constructed.
Unless otherwise identified in the applicable Project Information Sheet, all phases of an assigned project shall be designed concurrently and completed by the Final Design deadline identified in this RSOQ.
8. Technical Specifications and Bid Documents
Prepare project-specific technical specifications necessary for bidding and construction of the project. PCMC will provide its standard front-end procurement and contract documents. The Design Professional shall coordinate its technical specifications and construction drawings with PCMC's front-end documents to produce a complete bid-ready construction package.
Technical specifications shall address the materials, workmanship, installation requirements, testing, restoration, and other technical requirements applicable to the project.
For projects identified for phased construction, the construction documents, bid items, quantities, and cost estimates shall be organized by phase to provide PCMC flexibility to bid and award an individual phase, multiple phases, or the entire project. The specific bidding and award structure will be determined by PCMC in coordination with the
Design Professional during development of the final bid documents.
9. Permitting and Agency Coordination
Identify permits, approvals, and agency coordination anticipated to be required for construction of the project. Unless otherwise identified in the Project Information
Sheet, PCMC will be responsible for permit fees and execution of Owner permit applications. The Design Professional shall prepare or provide design information and supporting documentation reasonably necessary for applicable permits and approvals.
10. Construction Cost Estimates
Prepare an opinion of probable construction cost for each assigned project at the 60%, 90%, and Final design milestones. Estimates shall reflect the current design and be sufficiently detailed to assist PCMC with project budgeting and procurement planning.
For projects identified for phased construction, opinions of probable construction cost shall separately identify the estimated construction cost of each phase as well as the estimated cost of the overall project.
11. Final Design Deliverables
For each assigned project, provide final, bid-ready construction documents incorporating PCMC review comments. Final deliverables shall include, at a minimum:
RSOQ Template 6-26 7
• Final construction drawings in PDF and editable electronic format;
• Final technical specifications in PDF and editable electronic format;
• Final opinion of probable construction cost;
• Final survey/base mapping and supporting design files, as applicable;
• Geotechnical/environmental reports and supporting documentation, as applicable; and
• Other project-specific deliverables identified in the applicable Project
Information Sheet.
Final deliverables shall become the property of PCMC in accordance with the Design
Professional Services Agreement.
12. Record Drawings
Upon completion of construction, the Design Professional shall prepare record drawings for each assigned project based on contractor redlines, field markups, and other information provided by PCMC or its construction representative. The Design
Professional shall update the final design drawings to reflect the installed conditions and provide final record drawings in PDF and editable electronic format.
Record drawing preparation shall be based on information provided by others. If the information provided is incomplete, unclear, or inconsistent, the Design Professional shall notify PCMC and request direction prior to completing the record drawings.
B. Project-Specific Requirements
The six projects included in this RSOQ are identified in Exhibits B through G. Each Project
Information Sheet provides the currently known project-specific information and requirements.
Respondents shall review each Project Information Sheet and account for the identified requirements in their SOQ. If a Respondent believes additional services are necessary to successfully complete a project, those services shall be clearly identified and explained in the SOQ.
Respondents may submit qualifications for any combination of the six projects. Submission of qualifications for one project does not require submission for any other project.
III. Schedule.
Time is a material consideration in the selection and performance of the work. PCMC intends to proceed with design of all six projects concurrently during fall/winter 2026–2027.
Final, bid-ready design documents for the Park Avenue Waterline & Stormwater Replacement
Project and Park City Stormwater Infrastructure Improvements Project must be completed no
RSOQ Template 6-26 8 later than March 31, 2027. Final, bid-ready design documents for all other projects must be completed no later than January 31, 2027.
Respondents shall provide a proposed design schedule for each project for which they wish to be considered, including anticipated dates for project kickoff, field investigation/survey, 60% design, 90% design, and Final design.
Respondents seeking consideration for multiple projects shall demonstrate that adequate staff and resources are available to perform the identified projects concurrently without jeopardizing the applicable project completion deadlines. If a Respondent does not have the capacity to accept all projects for which it wishes to be considered, the Respondent shall identify the maximum number of projects it can accept and any project preferences or priorities as part of its SOQ.
IV. Contents of SOQ and Evaluation Criteria.
A. SOQ Requirements
SOQs shall be concise and provide sufficient information for PCMC to evaluate the
Respondent's qualifications, relevant experience, project understanding, technical approach, available capacity, and ability to meet the required schedule.
The first page of the SOQ shall clearly identify each project for which the Respondent requests consideration. If requesting consideration for multiple projects, the Respondent shall also identify the maximum number of projects it is capable of accepting and its order of project preference if it is unable to accept all projects for which it is selected as the highest-ranked Respondent.
Respondents may submit qualifications for one, multiple, or all six projects and are not required to seek consideration for all projects.
The SOQ shall be limited to 10 pages, excluding cover, table of contents, resumes, and required forms.
1. Firm and Project Team Qualifications
Identify the proposed project manager and key personnel who will perform the work.
Describe their roles, qualifications, professional licenses, and relevant experience.
Identify any subconsultants and the services they will perform.
Respondents proposing on multiple projects shall identify whether the same or different project teams will be assigned to each project.
2. Relevant Project Experience
Provide examples of similar water and/or stormwater infrastructure design projects relevant to the project(s) on which the Respondent is proposing completed within the
RSOQ Template 6-26 9 past ten years, with particular emphasis on municipal infrastructure projects involving existing developed areas, utility conflicts, infrastructure replacement, roadway restoration, fiber infrastructure, geotechnical/environmental considerations, and other conditions relevant to the projects included in this RSOQ.
Provide references for at least three similar projects.
3. Project Understanding and Approach
Describe the Respondent's understanding of the work and proposed approach to completing the design services. Identify anticipated design challenges, coordination needs, schedule risks, and methods the Respondent will use to maintain design quality and meet the required deadline.
Respondents are not expected to provide a separate lengthy technical narrative for each project; however, the SOQ should demonstrate an understanding of the specific conditions and design considerations identified in the Project Information Sheet for each project on which the Respondent is proposing.
4. Capacity & Schedule
Respondents shall provide a proposed schedule demonstrating their ability to complete the design of each project on which they are proposing by the applicable project deadline. Respondents proposing on multiple projects shall clearly describe their available staffing and capacity to perform the projects concurrently.
If a Respondent is proposing on more projects than it has capacity to accept, the
Respondent shall clearly state the maximum number of projects it can accept and identify any project preferences or priorities. PCMC may consider a Respondent for any combination of the projects identified in the Respondent's SOQ, subject to the project-specific rankings, Respondent capacity, and selection process described herein.
If Respondent proposes to use a third party (subcontractor, subconsultant, etc.) for completing all or a portion of the scope of work requirements, state the name and identify the portion of the scope of work to be completed by a third party.
NOTE: Price or cost information shall not be submitted; if a Respondent provides this information, the SOQ will be considered unresponsive and removed from consideration.
B. Evaluation Criteria
RSOQ Template 6-26 10
Maximum Points
A. Qualifications of Proposed Project Team (30)
B. Relevant Project Experience and References (25)
C. Project Understanding and Technical Approach (25)
D. Capacity and Ability to Meet Required Schedule (20)
Maximum Total Points (100)
PROJECT-SPECIFIC EVALUATION AND RANKINGS: Respondents will be evaluated separately for each project for which they request consideration. PCMC will establish a separate ranking of qualified Respondents for each of the six projects based on the evaluation criteria identified above.
A Respondent's qualifications, experience, project understanding and approach, proposed personnel, capacity, and schedule may be evaluated differently for each project based on the specific requirements and conditions identified in the applicable Project Information Sheet.
A Respondent may therefore receive different rankings for different projects. PCMC is not obligated to select a Respondent for every project for which the Respondent requests consideration.
PCMC anticipates selecting one or more Design Professionals through this RSOQ. Selection as the highest-ranked Respondent for a project does not guarantee award of a contract. Final project assignments are subject to successful negotiations, Respondent capacity, applicable approvals, and execution of a Design Professional Services Agreement.
PCMC reserves the right to reject any and all SOQs for any reason. SOQs lacking required information will not be considered. The award of a contract may be subject to approval by City
Council.
V. Government Records Access and Management Act.
PCMC will maintain a nonpublic process for the duration of this solicitation in accordance with
Government Records Access and Management Act, Title 63G, Chapter 2 of the Utah Code
(“GRAMA”). Pursuant to Utah Code § 63G-2-305(6), all records related to this procurement, including but not limited to SOQs, evaluations, and selection procedures, and any records created during the evaluation and selection process will remain nonpublic records during the procurement process. After execution of a contract, all submittals will be treated as public records in accordance with the requirements of GRAMA unless otherwise claimed by the
Respondent as exempt from disclosure pursuant to Utah Code § 63G-2-309, as amended. The burden of claiming an exemption shall rest solely with each Respondent. Respondent shall submit any materials for which Respondent claims an exemption from disclosure marked as
RSOQ Template 6-26 11
“Confidential” and accompanied by a statement from Respondent supporting the exemption claim. PCMC shall make reasonable efforts to notify Respondent of any GRAMA requests for documents submitted under an exemption claim. Respondent waives any claims against PCMC related to disclosure of any materials pursuant to GRAMA. Please note the following:
a. Respondent must not stamp all materials confidential. Only those materials for which a claim of confidentiality can be made under GRAMA, such as trade secrets, pricing, non-public financial information, etc., should be stamped.
b. Respondent must submit a letter stating the reasons for the claim of confidentiality for every type of information that is stamped “Confidential.” Generally, GRAMA only protects against the disclosure of trade secrets or commercial information that could reasonably be expected to result in unfair competitive injury. Failure to timely submit a written basis for a claim of “Confidential” may result in a waiver of an exemption from disclosure under GRAMA.
c. For convenience, a Business Confidentiality Request Form (“BCR Form”) is attached to this procurement as Attachment 1. Respondent must submit a completed BCR Form at the time of submission of any SOQ.
VI. Ethics.
By submission of an SOQ, Respondent represents and agrees to the following ethical standards:
REPRESENTATION REGARDING ETHICAL STANDARDS: Respondent represents that it has not:
(1) provided an illegal gift or payoff to a city officer or employee or former city officer or employee, or his or her relative or business entity; (2) retained any person to solicit or secure this contract upon an agreement or understanding for a commission, percentage, or brokerage or contingent fee, other than bona fide employees of bona fide commercial selling agencies for the purpose of securing business; (3) knowingly breached any of the ethical standards set forth in Title 3, Chapter 1 of the Park City Code; or (4) knowingly influenced, and hereby promises that it will not knowingly influence, a city officer or employee or former city officer or employee to breach any of the ethical standards set forth in Title 3, Chapter 1 of the Park City Code.
VII. Selection Process.
SOQs will be evaluated using the criteria identified in Section IV, Contents of SOQ and
Evaluation Criteria.
The selection process will proceed as follows:
a. A selection committee comprised of qualified persons, which may include City staff or representatives from other public and private stakeholders, will review and evaluate all
SOQs.
RSOQ Template 6-26 12
b. The selection committee will evaluate Respondents separately for each project for which they request consideration and establish a project-specific ranking of qualified
Respondents for each project.
c. The selection committee may conduct interviews with the highest-ranked Respondents.
If interviews are conducted, PCMC may conduct interviews for one or more individual projects or for multiple projects concurrently. Interview results may be considered in establishing the final project-specific rankings.
d. Following establishment of the final rankings, PCMC may initiate contract negotiations for each project with the highest-ranked Respondent for that project, subject to the
Respondent's stated capacity and availability.
e. If a Respondent is the highest-ranked firm for more projects than it has identified capacity to accept, PCMC may assign projects based on the Respondent's stated project preferences, project-specific qualifications, available personnel and resources, project schedules, and the best interests of PCMC. PCMC may then initiate negotiations with the next highest-ranked Respondent for any remaining project.
f. If PCMC is unable to reach an agreement with the highest-ranked available Respondent for a particular project, PCMC may terminate negotiations with that Respondent for that project and initiate negotiations with the next highest-ranked available Respondent for that project.
g. PCMC may award individual projects to different Respondents or multiple projects to the same Respondent, subject to the project-specific rankings, demonstrated capacity, successful contract negotiations, and applicable City approvals.
h. All contracts with an aggregate cost over the term that exceeds $100,000 require approval of the City Council.
i. Contract execution.
VIII. PCMC Standard Agreement Required.
a. The successful Respondent(s) will be required to enter into PCMC’s standard Design
Professional Services Agreement. A form of the standard agreement is attached to this
RSOQ as Exhibit “A” and incorporated herein.
b. ANY REQUEST FOR CHANGES TO PCMC’S STANDARD AGREEMENT, INCLUDING ITS
INDEMNIFICATION OR INSURANCE PROVISIONS, MUST BE SUBMITTED NO LATER
RSOQ Template 6-26 13
THAN THE SOQ SUBMITTAL DEADLINE. ANY REQUESTED CHANGES MAY BE APPROVED
IN THE SOLE DISCRETION OF PCMC.
c. A Respondent must be authorized to do business in Utah at the time of contract execution. If Respondent’s address is within the Park City limits, a valid PCMC business license is required.
IX. General Provisions.
a. No Representations or Warranty. It is the responsibility of each Respondent to carefully examine this RSOQ and evaluate all of the instructions, circumstances and conditions which may affect any SOQ. Failure to examine and review the RSOQ and other relevant documents or information will not relieve Respondent from complying fully with the requirements of this RSOQ. Respondent’s use of the information contained in the RSOQ is at Respondent's own risk and no representation or warranty is made by PCMC regarding the materials in the RSOQ.
b. Cost of Developing SOQs. All costs related to the preparation of the SOQs and any related activities are the sole responsibility of the Respondent. PCMC assumes no liability for any costs incurred by Respondents throughout the entire selection process.
c. Equal Opportunity. PCMC is committed to ensuring equitable and uniform treatment of all Respondents throughout the advertisement, review, and selection process. The procedures established herein are designed to give all parties reasonable access to the same fundamental information.
d. SOQ Ownership. All SOQs, including attachments, supplementary materials, addenda, etc., will be retained as property of PCMC and will not be returned to the Respondent.
e. Modification of RSOQ. PCMC reserves the right to cancel or modify the terms of this
RSOQ and/or the project at any time and for any reason preceding the contract execution. PCMC will provide written notice to Respondents of any cancellation and/or modification.
f. Financial Responsibility. No SOQ will be accepted from, or contract awarded to, any person, firm or corporation that is in arrears to PCMC, upon debt or contract, or that is a defaulter, as surety or otherwise, upon any obligation to the PCMC, or that may be deemed irresponsible or unreliable by PCMC. Respondents may be required to submit satisfactory evidence demonstrating the necessary financial resources to perform and complete the work outlined in this RSOQ.
g. Local Businesses. PCMC's policy is to make reasonable attempts to promote local businesses by procuring goods and services from local vendors and service providers, in compliance with Federal, State, and local procurement laws.
RSOQ Template 6-26 14
X. Exhibits and Attachments:
Attachment 1: Business Confidentiality Request form
Exhibit A: PCMC Sample Design Professional Services Agreement
Project Specific Exhibits:
Exhibit B: Sampson / Norfolk / Woodside Transmission Line Replacement
Exhibit C: Royal Street West Waterline Replacement
Exhibit D: Estates Drive Phase II & Four Lakes Waterline Replacement
Exhibit E: Park Avenue Waterline & Stormwater Replacement
Exhibit F: Equestrian Court Stormwater Redesign
Exhibit G: Park City Stormwater Infrastructure Improvements Project
ATTACHMENT 1
BUSINESS CONFIDENTIALITY REQUEST FORM
(Business Confidentiality Claims under Utah’s Government Records Access and Management Act (“GRAMA”), Utah Code § 63G-2-309)
A claimant MUST submit a redacted and non-redacted version of their proposal. The entire proposal may NOT be redacted. PCMC will not redact a proposal on behalf of a claimant if they fail to upload a redacted copy of their proposal.
I request that the described portion of the record provided to Park City Municipal Corporation be considered confidential and given protected status as defined in GRAMA.
Name:
Address:
Description of the portion of the record provided to Park City Municipal Corporation that you believe qualifies for protected status under GRAMA (identify these portions with as much specificity as possible) (attach additional sheets if necessary): ______________________
The claim of business confidentiality is supported by (please check the box/boxes that apply):
( ) The described portion of the record is a trade secret as defined in Utah Code § 13-24-2.
( ) The described portion of the record is commercial or non-individual financial information the disclosure of which could reasonably be expected to result in unfair competitive injury to the provider of the information or would impair the ability of the governmental entity to obtain the necessary information in the future and the interest of the claimant in prohibiting access to the information is greater than the interest of the public in obtaining access.
( ) The described portion of the record would cause commercial injury to, or confer a competitive advantage upon a potential or actual competitor of, a commercial project entity as defined in Utah Code § 11-13-103(4).
REQUIRED: Written statement of reasons supporting a business confidentiality claim as required by Utah Code § 63G-2-305
(1) –(2) (attach additional sheets if necessary):
NOTE: Claimant shall be notified if the portion of the record claimed to be protected is classified as public or if the determination is made that the portion of the record should be disclosed because the interests favoring access outweigh the interests favoring restriction of access. Records claimed to be protected under this business confidentiality claim may not be disclosed until the period in which to bring the appeal expires or the end of the appeals process, including judicial appeal, unless the claimant, after notice, has waived the claim by not appealing the classification within thirty (30) calendar days. Utah Code § 63G-2-309(2).
Signature of Claimant:
Date:
EXHIBIT “A”
SAMPLE DESIGN PROFESSIONAL SERVICES AGREEMENT
File details come from the government source that posted it. Updated .