RFB 2027 - 03 - Rope Mill Road Trail Connection

Closed State & local contract opportunity Posted

Solicitation number
PE-62853-NONST-2027-000000028
State
Georgia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The City of Woodstock, Georgia is requesting bids for construction of an 8-foot multi-use trail and stormwater drainage improvements along Rope Mill Road from Inwood Walk North to across from Camelia Place, with bids due September 22, 2026 at 10:00 AM EST and a non-mandatory pre-bid conference on August 27, 2026 at 3:00 PM via GoTo Meetings. All bidders must maintain active GDOT prequalification status prior to bid submission.

The scope includes concrete sidewalk and multi-use trail installation (532 square yards), road widening, curb and gutter construction (1,720 linear feet), storm drainpipe installation in 18-inch and 24-inch configurations (437 and 195 linear feet respectively), 7 catch basins, driveway reconstruction, traffic calming island, and thermoplastic striping. All work shall conform to GDOT and City of Woodstock standards. The contractor must complete all work within 90 consecutive calendar days following issuance of the Notice to Proceed, with work hours limited to 8:00 AM to 5:00 PM Monday through Friday unless weekend work is approved by the Public Works Director.

Bids must be itemized and valid for 60 days after submission. The contract will be awarded to the lowest responsive and responsible bidder. Written questions are due September 3, 2026 at 5:00 PM. All bids must include a certified check or bid bond equal to 5 percent of the total bid amount. Upon award, the contractor must provide 100 percent project value performance and payment bonds, general liability insurance of $1 million/$2 million aggregate, and workers' compensation insurance. The City will retain 5 percent of each progress payment as retainage. Liquidated damages are assessed at $250 per day for each consecutive calendar day of default after the completion date. A one-year warranty is required upon satisfactory project completion. Contract award is anticipated October 12, 2026.

Opportunity text

The City of Woodstock, Georgia, herein referred to as the City, is accepting bids from qualified contractors for the purpose of constructing an 8-foot multi-use trail & stormwater drainage improvements along Rope Mill Road from Inwood Walk North to across from Camelia Place, as well as a traffic calming island, hereinafter referred to as the ¿Project¿. This includes but is not limited to concrete sidewalk installation, road widening, curb & gutter, storm drainpipe, catch basins, driveway reconstruction and thermoplastic striping.

Files

File Type Posted
RFB 2027 _ 03 _ Rope Mill Road Trail Connecti.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity