Request for Pre-Qualifications | Phase 1 | MP12 B and C - 500 South Capacity Upgrades - CMGC

Open State & local contract opportunity Posted

Solicitation number
525003195
State
Utah
Responses due

Opportunity facts

NIGP codes
Show all 22
UNSPSC codes
Show all 28

Opportunity details come from utah.bonfirehub.com. Updated .

About this opportunity

Salt Lake City Department of Public Utilities (SLCDPU) is soliciting Statements of Qualifications from construction manager/general contractor (CMGC) firms for Phase 1 pre-construction and procurement services on the MP12 B and C – 500 South Capacity Upgrades project, with SOQs due through the Utah Public Procurement Place (U3P) by 2:00 PM MST on Wednesday, December 9, 2026.

The CMGC contract covers pre-construction, procurement, and construction of two of three planned 24-inch force mains. The mains will intercept the existing 700 South force mains at Gladiola Street and extend to a discharge point upstream of the 500 South Lift Station near Orange Street. The third force main will be added as flow conditions demand, and each critical crossing will include installation of all three mains. Major crossings include the Surplus Canal, a railroad corridor with one SLG & W track and three UPRR tracks, and I-215. The project follows a prior phase that installed a sewer pump station and two 24-inch force mains discharging to the 500 South Sewer at Gladiola Street.

Proposers must demonstrate three project categories. Pipeline experience requires a minimum of three projects valued at $20 million or greater, including at least 10,000 linear feet of pressurized pipeline and 5,000 linear feet of 20-inch or larger HDPE pipe with fusion certification. Watertight shaft experience requires a minimum of two projects at depths of at least 30 feet in soft clays and water-bearing soils. Microtunnel experience requires a minimum of two projects at least 60 inches in diameter and 500 feet long in soft clays or loose sands. Contractors must carry general liability of $3 million aggregate and $2 million per occurrence, excess/umbrella liability of $5 million, automobile liability of $2 million combined single limit, environmental liability of $1 million per occurrence and $2 million aggregate, and statutory workers' compensation. All contractors must comply with Utah E-Verify requirements.

The CMGC Contract Price is anticipated to be approximately $25 million to $35 million. The procurement phase runs from October 2026 through March 2027. The source names no incumbent.

Opportunity text

Salt Lake City Department of Public Utilities (SLCDPU) (Owner) will be requesting Statements of Qualifications from CMGC organizations (Proposers) for the construction of the following MP12B and C - 500 South Capacity Upgrades (525003195) and for related pre-construction and procurement CMGC services: Owner will receive Statements of Qualifications demonstrating the Proposer's qualifications and ability to provide CMGC services via the Utah Public Procurement Place (U3P) website in accordance with the requirements outlined in the Prequalification Documents. To be considered, the SOQ is due through the U3P website no later than 2:00 PM on Wednesday, December 9, 2026 (MST). After that time, Owner will no longer accept Statements of Qualifications. See Requests for Qualifications for details on preparing and submitting the Statement of Qualifications. The CMGC Contract will include the following services and Work: The previous phase of this project installed a new sewer pump station and two 24-inch force mains discharging to the 500 South Sewer at Gladiola Street (3400 W). This project will intercept the existing 24-inch diameter 700 South force mains on the north side of the railroad tracks at Gladiola Street and will extend them from that location to a discharge point upstream of the 500 South Lift Station near Orange Street. The project includes construction of two of the three force mains, with the third being added as flow conditions demand. Each tunnel/crossing or other critical points will include installation of all three force mains to avoid multiple construction and permitting efforts in the future. Major crossings include the Surplus Canal, a railroad corridor (one SLG & W track and three UPRR tracks), and I-215. Owner anticipates that the CMGC's Contract Price will be approximately $25-35M and is projected to adhere to the following schedule: Item Project Milestone Estimated Date 1 CMGC Procurement October 2026 - March 2027 2 60% Design January 2026 - April 2027 3 90% Design April 2027 - May 2027 4 Final Design June 2027 - July 2027 5 GMP Finalized August 1st, 2027 6 Construction August 2027 - Aug 2029 It's the responsibility of the applicant to periodically check and download addenda(s), question and answer responses, or any additional information that may be posted during the advertisement period. Only SOQs submitted electronically through (U3P) BONFIRE will be accepted. Neither Owner, Owner's Advisor, nor Engineer will be responsible for Proposal Documents, including addenda, if any, obtained from sources other than the U3P website. Two-Step Process: Selection of the Construction Manager will be made using a two-step process. Step One: The Owner will receive Statements of Qualification and evaluate these, along with other information, to develop a list of the most highly qualified Proposers. Step Two: Qualified Proposers will receive a Request for Proposals and will submit a detailed Proposal for the CMGC Contract for the Owner's consideration. The Proposal and the previously submitted Statement of Qualifications will be used together to determine the final ranking of Proposers for award of the CMAR Contract. The Request for Qualifications includes details on the selection criteria and selection process. Schedule: Item RFQ Milestone Estimated Date 1 RFQ Advertisement Wednesday, Nov 18, 2026 2 RFQ Question and Answer period ends Wednesday, December 2, 2026 (2:00 PM) 3 Final Addendum Release Monday, Dec 7, 2026 4 SOQs Due Wednesday, Dec 9, 2026 (2:00 PM) 5 Review SOQs Thursday, Dec 10, 2026 - Thursday, Dec 17, 2026 6 List of Qualified Contractors Released Friday, Dec 18, 2026 Proposal Documents: The Request for Qualifications includes details on the selection criteria and selection process. Refer to the Proposal Documents for all further requirements regarding Statements of Qualifications, Proposals, CMGC selection, and other Proposal submittals, qualifications, and procedures. Download and read the following document attachments in the following order: Document 1: Advertisement Document 2: Request for Qualifications Document 3: Statement of Qualifications Certification Document 4: Attachments A-F Document 5: Appendix A-B Document 6: Cover Page