3-RFQ Phase1 CMAR Attacchments A-F 18NOV2026.pdf

PDF 244 KB Posted

Attached to
Request for Pre-Qualifications | Phase 1 | MP12 B and C - 500 South Capacity Upgrades - CMGC
Solicitation number
525003195
Issued by
Salt Lake County, Salt Lake City, Utah

About this file

This is a Request for Statements of Qualifications (RFQ) for Construction Manager/General Contractor (CM/GC) services issued by the Salt Lake City Department of Public Utilities for the MP12B and C - 500 South Capacity Upgrades project. The project involves the construction of force main sewer lines extending from Gladiola Street to a discharge point near Orange Street upstream of the 500 South Lift Station, including two of three planned 24-inch diameter force mains with provisions for future installation of a third line. Major construction elements include crossings of the Surplus Canal, railroad corridors (one SLG & W track and three UPRR tracks), and I-215. The Statements of Qualifications must be submitted through the Utah Public Procurement Place (U3P) website no later than 2:00 PM Mountain Standard Time on Wednesday, December 9, 2026. The anticipated contract price ranges from $25 million to $35 million, with the procurement phase extending from October 2026 through March 2027, followed by a 60% design phase from January 2026 through April 2027.

Proposers must demonstrate qualifications across three primary areas: pipeline projects (minimum three projects valued at $20 million or greater with at least 10,000 linear feet of pressurized pipeline and 5,000 linear feet of 20-inch or larger HDPE pipe with fusion certification), water-tight shaft projects (minimum two projects with depths of at least 30 feet in soft clays and water-bearing soils), and microtunnel installation projects (minimum two projects of at least 60-inch diameter and 500 feet in length in soft clays or loose sands). Contractors must maintain comprehensive liability insurance including general liability with limits of $3 million general aggregate and $2 million per occurrence, excess/umbrella liability of $5 million, automobile liability of $2 million combined single limit, environmental liability of $1 million per occurrence and $2 million aggregate, and workers' compensation at statutory levels. All contractors must comply with Utah's E-Verify requirements and certify compliance with the City's ethical standards and confidentiality requirements. The project documents and additional qualifications exhibits are available for review through the RFQ process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Salt Lake City Department of Public Utilities MP12B and C - 500 South Capacity Upgrades Request for Statements of Qualifications

ATTACHMENT A

CONTRACTOR: QUALIFICATIONS AND EXPERIENCE (make copies of this sheet as necessary)

PIPELINE PROJECTS

• List at least three (3) projects between 2016 to 2026 for GCs: with a value of at least $20M within the last 10 years. All reference projects for CM/GCs shall be water or wastewater projects constructed in an urban environment. Reference projects shall show experience with gravity and pressurized sewer, trenchless pipeline installation, shoring, and other requirements to meet the “minimum project requirements” outlined below:

o At least three (3) pipeline projects with a value of $20M USD or greater and constructed within an urban environment.

o Installing at least 10,000 length feet (LF) of pressurized pipeline of similar length and diameter to what is shown on Project

Overview Exhibit.

o Installing 5,000 LF of 20” or larger HDPE pipe where fusion certification requirements were met.

WATER-TIGHT SHAFT PROJECTS

• List at least two (2) projects for water-tight construction shafts used to install tunnels. Previous experience shall include secant pile, grouted sheet pile, or other water-tight alternative with base plug and a minimum depth of 30 feet in soil conditions consisting of soft clays and/or water bearing silts and sands. For each project, provide: a general description of the project, a description of soil conditions, and means and methods of ground support.

MICROTUNNEL INSTALLATION PROJECTS

• List at least two (2) projects for microtunnel installations of at least 60-inch diameter and 500 feet in length in soil conditions consisting of soft clays and/or loose sands. For each project, provide: a general description of the project, a description of soil conditions, and means and methods of ground support.

PROJECT QUALIFICATIONS AND EXPERIENCE - CONTRACTOR

Project Type: Pipeline Project Water-tight Shaft Microtunnel Installation

Project Name and Location:

Owner's Contact Information: Name:

Address:

Telephone:

Email:

Engineer’s Contact Information: Name:

Address:

Telephone:

Email:

Project Manager: Name:

Address:

Telephone:

Email:

Project Superintendent: Name:

Address:

Telephone:

Email:

Project Contracted Value:

Change Orders: # of change orders:

Total $ amount:

Project Completed: (Y/N)

Date Completed or Date of Expected Completion:

CM/GC Project? (Y/N)

Project Description (include minimum project specific requirements described above):

ATTACHMENT B

CONSTRUCTION MANAGER / GENERAL CONTRACTOR (CM/GC) PROJECT EXPERIENCE (make copies of this sheet as necessary)

• Submit a list of the five (5) most recent CM/GC projects where the Proposer functioned as a CM/GC (CMAR).

PROJECT REFERENCE – CM/GC

Project Name:

Project Location:

Project Description:

Owner Contact Information: Name:

Address:

Telephone:

Email:

Project Cost: $

Date Completed:

ATTACHMENT C

Required Contractor’s Liability Insurance and Bonds

The requirements for insurance to be purchased and maintained by the CONTRACTOR and any renewals thereof, are as follows:

A. All liability insurance policies for the project shall include an endorsement naming the OWNER, ARCHITECT AND ENGINEER as additional insureds.

B. The CONTRACTOR General Liability Insurance shall be comprehensive form and shall include the following coverages;

o Auto Liability Insurance shall be comprehensive form and shall cover owned, hired and non-owned vehicles.

o The limits of liability for the insurance required by the General Conditions and Supplementary General Conditions shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations. Contractor shall procure and maintain for the duration of the contract, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the contracting party, his agents, representatives, employees or subcontractors. The cost of such insurance shall be included in the Contracting party’s proposal.

o Contractor (the Contractor) shall maintain or cause to be maintained on its behalf insurance policies of the types required below with insurance companies authorized to do business in the State of Utah, (i) having a Best Insurance Reports rating of "A" or better and a financial size category of "X" or higher, or (ii) otherwise being acceptable to the District with coverage limits and provisions at least sufficient to satisfy the requirements set forth below. All sureties shall be listed in the Department of the Treasury Circular 570, with bond amounts not exceeding those listed.

a. Workers’ Compensation required by the General Conditions and the Supplementary General Conditions.

State Statutory Applicable Federal Statutory Statutory workers' compensation insurance (Part A).

Such insurance shall also include employer’s liability (Part B) insurance for each: accident, disease, employee.

No owner or officer may be excluded. $1,000,000

For work performed in monopolistic states, stop-gap liability coverage shall be endorsed to either the worker’s compensation or commercial general liability policy with a minimum limit of: $1,000,000

Foreign Voluntary Worker Compensation Statutory

b. Contractor’s Commercial General Liability Insurance required by the General conditions and Supplementary General Conditions:

General Aggregate

(Except Products- Completed Operations) $3,000,000

Products – Completed Operations Aggregate $3,000,000 Personal and Advertising Injury

(Per Person/Organization) $2,000,000

Each Occurrence (Bodily Injury and Property Damage) $2,000,000

Such insurance shall provide coverage for ongoing operations and products-completed operations, blanket contractual, broad form property damage, personal and advertising injury, independent contractors and sudden and accidental pollution liability [pollution liability arising out of a hostile fire]

Property Damage Liability Insurance will provide Explosion, Collapse, and Underground coverages where applicable.

Excess Liability in Umbrella Form:

General Aggregate $5,000,000 Each Occurrence $5,000,000

c. Automobile Liability required by the General Conditions and the Supplementary General Conditions:

Bodily Injury:

Each Person $1,000,000 Each Accident $2,000,000

Property Damage:

Each Accident $500,000

Combined Single Limit (Bodily Injury and Property Damage) Each Accident $2,000,000

d. Excess or Umbrella Liability:

Per Occurrence $5,000,000 General Aggregate $5,000,000

e. Contractors Pollution (Environmental) Liability Insurance: Environmental liability insurance for the Contractor’s liability arising out of their operations. Coverage shall apply to all operations untaken by the contractor.

Each Occurrence $1,000,000

General Aggregate $2,000,000

f. Builder’s Risk / Installation Floater: Contractor shall provide optional terms for builder’s risk insurance or installation floater. Contractor agrees to have District approve builder’s risk insurance program including limits, deductibles, terms, etc.

The District shall maintain the right to obtain and implement builder’s risk coverage at their discretion.

g. Other persons or entities (other than those already listed in the General Conditions) to be included on the policy as additional insureds shall include:

Salt Lake City Department of Public Utilities J-U-B Engineers and its subconsultants.

Other engineering or testing groups employed by Owner for work at the site or this project.

ATTACHMENT D

CERTIFICATION OF COMPLIANCE

WITH E-VERIFY PROGRAM OR EQUIVALVENT

This is to certify that _________________________________________________(“Company”) covenants, represents and warrants to Salt Lake City Department of Public Utilities (“SLCDPU”) that Company is and at all time during the performance of any contract with SLCDPU will be in full compliance with the requirements of Utah Code Ann. § 63G-12-302(3) (including amendments and substitutions to the law) relative to the verification of the work eligibility status of employees and, in particular, that Company is registered and participates in a Status Verification system as required by law.

Dated this ______ day of _______________________________, 2026.

Name of Company

By:____________________________________

Title:___________________________________

Printed Name:___________________________

4823-4663-5342, v. 2

ATTACHMENT E

CONFIDENTIALITY AND ETHICS CLAUSES

The following two (2) paragraphs must be included in the response submission as well as the Contractors’ written acknowledgement that they have read the paragraphs and agree to comply with the terms:

1) REPRESENTATION REGARDING ETHICAL STANDARDS FOR CITY OFFICERS AND

EMPLOYEES AND FORMER CITY OFFICERS AND EMPLOYEES. The Proposer represents that it has not: (1) provided an illegal gift or payoff to a City officer or employee or former City officer or employee, or his or her relative or business entity; (2) retained any person to solicit or secure this contract upon an agreement or understanding for a commission, percentage, brokerage or contingent fee, other than bona fide employees or bona fide commercial selling agencies for the purpose of securing business; (3) knowingly breached any of the ethical standards set forth in the City's conflict of interest ordinance, Chapter 2.44, Salt Lake City Code; or (4) knowingly influenced, and hereby promises that it will not knowingly influence, a City officer or employee or former City officer or employee to breach any of the ethical standards set forth in the City's conflict of interest ordinance, Chapter 2.44, Salt Lake City Code.

Pursuant to the foregoing, it is the City’s policy that City employees are prohibited from personally accepting gifts, incentives, and marketing or promotional items from Suppliers and Suppliers shall not offer such items to City employees. Such offers from Suppliers are inappropriate and may result in suspension or debarment of the Supplier from the City's procurement processes.

2) CONFIDENTIALITY

All responses, inquiries, and correspondence relating to this Prequalification Application and all reports, charts, displays, schedules, exhibits, and other documentation produced by the offeror that are submitted to the City, as part of the proposal or otherwise, shall become the property of the City when received by the City and may be considered public information under applicable law. The City is subject to the disclosure requirements of the Government Records Access and Management Act, Title 63G, Chapter 2, Utah Code Annotated (“GRAMA”). The City generally considers proposals and all accompanying material to be public and subject to disclosure. Any material considered by the offeror to be proprietary must be accompanied by a written claim of business confidentiality containing a concise written statement of reasons supporting the claim. Blanket claims that the entire Prequalification Application is confidential will be denied. The City cannot guarantee that any information will be held confidential. If the offeror makes a claim of business confidentiality, the City, upon receipt of a request for disclosure, will determine whether the material should be classified as public or nonpublic, and will notify the offeror of such determination. The offeror is entitled under GRAMA to appeal an adverse determination. The City is not obligated to notify the offeror of a request to see the offeror’s proposal, and will not consider a claim of confidentiality, unless the offeror's claim of confidentiality is made in a timely basis and in accordance with GRAMA.

The City reserves the right to request a contractor to clarify any part of their statement.

Response to such requests must be made in writing and will become part of the statement of qualifications. Unsolicited supplementary information and materials received after the deadline will not be considered in the evaluation.

Each submittal package for the Offeror's Prequalification must be signed by an individual who has the legal authority to bind the applicant on whose behalf that person is signing (Use Application Certification Form in Appendix B). If any information provided by the applicant is inaccurate, the applicant must immediately notify the City and provide updated, accurate information in writing and under penalty of disqualification prior to the date and time set for the close of the prequalification process.

ATTACHMENT F

RFQ Criteria (for information only)