Newtown Estates Park Asphalt Trail
Closed State & local contract opportunity Posted
- Solicitation number
- 2025-QQ-564
- State
- Florida
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 08585 Soil Erosion Sheeting Material (To Include Silt Fencing): Asphalt, Biodegradable Paper, Burlap, Excelsior, Jute, Straw, Etc.
- 21055 Paving And Stepping Blocks
- 36075 Tile, Asphalt
- 63012 Coatings, Protective, Asphalt Based (Also See Class 770-26)
- 63112 Coatings, Protective, Asphalt Based (Also See Class 770-26), Environmentally Certified Products
- 74502 Asphalt, Ac (Asphalt/Cement)
- 74504 Asphalt, Ac (With Latex/Polymer)
- 75051 Fabric, Pavement
- 75530 Asphalt Pavers, Self-Propelled Type
- 75535 Asphalt Pavers, Towed Type
- UNSPSC codes
- Point of contact
-
- Destiny Gonzalez degonzalez@scgov.net (941) 415-4085
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
Sarasota County is seeking quotes for the Newtown Estates Park Asphalt Trail project through a Quick Quote (QQ) procurement solicitation numbered 2025-QQ-564. The project involves installing a new 1,600 linear foot, 8-foot wide asphalt trail connecting Martin Luther King Jr. Way and Newtown Boulevard within the Newtown Estates Park. Specific requirements include widening an existing 5-foot gravel and shell trail, using FDOT-approved Hot Mix Asphalt with a thickness of 1.5 to 2 inches, and compacting the surface using a minimum 3-ton vibratory roller. Trail ends will be flared to 16 feet wide, extending 12 feet from sidewalk connections. The contractor must reuse existing trail materials where feasible, relocate excess materials onsite as directed by the county, and ensure complete site cleanup and disposal of construction debris. The solicitation was released on October 20, 2025, with questions due by October 28, 2025, and final responses required electronically by October 30, 2025, at 2:30 pm through the ProcureNow electronic portal.
The procurement includes a maximum quote threshold of $50,000, with the award to be made to the responsive and responsible bidder providing the lowest total bid price. No specific set-aside designations or restrictions for disadvantaged enterprises are explicitly mentioned in the documentation. The contractor is prohibited from subcontracting any part of the work and must perform all tasks directly. Vendors must comply with state regulations, including E-Verify employment eligibility and specific insurance and cybersecurity standards. The project will be managed by the Parks, Recreation, and Natural Resources Department. Materials provided will be warranted for one year from the county's acceptance or the standard manufacturer's warranty, whichever is longer. Bidders are required to submit three references demonstrating similar service experience through the OpenGov Procurement platform, though no specific licensing requirements are detailed in the solicitation documents.
Opportunity text
Sarasota County is requesting quotes from bidders to install a new asphalt trail connecting Martin Luther King Jr. Way and Newtown Boulevard, as illustrated in Attachment 1 (marked in yellow).
Trail Widening and Grading
i. The Contractor shall widen the existing 5-foot gravel and shell trail to a finished width of 8 feet. Existing material shall be reused for grading and contouring where feasible. Any excess material not suitable for reuse shall be relocated onsite as directed by the County.
Asphalt Installation
i. The Contractor shall furnish and install 1,600 linear feet of trail, 8 feet wide, using FDOT-approved Hot Mix Asphalt (HMA). Asphalt thickness shall be 1.5 to 2 inches and compacted using a minimum 3-ton vibratory roller to achieve a smooth, uniform surface. Trail ends shall be flared 16 feet wide, extending 12 feet from the sidewalk connections at each end.
Site Cleanup and Disposal
i. The Contractor shall remove and properly dispose of all construction debris, trash, and excess materials at an approved offsite disposal location. The site shall be left clean, graded, and free of obstructions upon project completion.
The Contractor shall perform all work under this agreement and shall not subcontract any part thereof.
Files
| File | Type | Posted |
|---|---|---|
| Newtown_Estates_Park_Asphalt_Trail.pdf | ||
| 2025-QQ-564_Requirements.pdf | ||
| Attachment_1.pdf | ||
| Attachment_6.jpg | JPG image | |
| Attachment_10.jpg | JPG image | |
| Attachment_5.jpg | JPG image | |
| Attachment_2.jpg | JPG image | |
| Attachment_3.jpg | JPG image | |
| Attachment_4.jpg | JPG image | |
| Attachment_7.jpg | JPG image | |
| Attachment_8.jpg | JPG image | |
| Attachment_9.jpg | JPG image |
Show all 12
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity