Attachment_6.jpg

JPG image 39 KB Posted

Attached to
Newtown Estates Park Asphalt Trail
Solicitation number
2025-QQ-564
Issued by
Sarasota County, Siesta Key CDP, Florida

About this file

The file Attachment_6.jpg is a government document related to a Sarasota County, Florida infrastructure project for a new asphalt trail project connecting Martin Luther King Jr. Way and Newtown Boulevard. The project involves widening an existing 5-foot gravel and shell trail to an 8-foot wide asphalt trail, with a total length of 1,600 linear feet. The trail will be constructed using FDOT-approved Hot Mix Asphalt (HMA) with a thickness of 1.5 to 2 inches, compacted using a minimum 3-ton vibratory roller. Trail ends will be flared to 16 feet wide, extending 12 feet from sidewalk connections at each terminus.

The project specification requires the contractor to complete all work directly, with no subcontracting permitted. Site preparation includes reusing existing materials for grading where feasible, with excess unsuitable materials to be relocated onsite as directed by the county. Upon completion, the contractor must remove all construction debris and leave the site clean, graded, and free of obstructions. The project appears to be fully funded by Sarasota County and will be disposed of at an approved offsite location, with all work to be performed under the direct agreement with the county.

View the file

Other files

File Type Posted
Newtown_Estates_Park_Asphalt_Trail.pdf PDF
Attachment_10.jpg JPG image
Attachment_9.jpg JPG image
Attachment_8.jpg JPG image
Attachment_7.jpg JPG image
Attachment_5.jpg JPG image
Attachment_4.jpg JPG image
Attachment_3.jpg JPG image
Attachment_2.jpg JPG image
Attachment_1.pdf PDF
2025-QQ-564_Requirements.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .