MI 2622 - Moorpark Storm Drain Pipe (CMP) Lining and Repair at Gainsborough

Closed State & local contract opportunity

Solicitation number
2025/2026-26
State
California
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The City of Thousand Oaks Public Works Department is requesting sealed bids for rehabilitation of a 24-inch corrugated metal pipe storm drain on Moorpark Road using steam cured-in-place pipe (CIPP) lining, with bids due July 29, 2026 at 3:30 p.m. Pacific Time and questions due July 22, 2026 at 5:30 p.m.

The scope includes steam CIPP lining of the existing 24-inch CMP storm drain, construction of a new 30-inch storm drain manhole at the east end for CIPP access, and asphalt and concrete pavement rehabilitation on the west side of Moorpark Road. Work is organized into two bid schedules: Schedule A covers the primary storm drain lining and repair; Schedule B addresses pavement depression repair on southbound Moorpark Road. The project site is located at Moorpark Road approximately 550 feet north of Gainsborough Road in Thousand Oaks. Contract completion time is 60 calendar days from Notice to Proceed. All work must comply with the City of Thousand Oaks 2018 Road Design and Construction Standard Plates, Standard Plans for Public Works Construction, CalTrans 2022 and 2010 Standard Plans, and applicable California Building Code provisions. Contractors must maintain active California Department of Industrial Relations registration, provide current California Air Resources Board compliance certificates for all equipment and subcontractors, and hold a current California Class A contractor's license. Work is subject to California prevailing wage requirements.

The Engineer's Estimate is $140,000. Bid security equal to 10 percent of total bid price is required in the form of an electronic bid bond via Surety2000, a hard copy bid bond, certified check, cashier's check, or cash. Performance and Payment Bonds equal to 100 percent of the contract price are due within 10 calendar days of award. Liquidated damages are $750 per calendar day for contractor-caused delays and $750 per day as reverse liquidated damages for city-caused delays. The City will award the contract to the lowest responsive, responsible bidder based on combined totals of both schedules. Bids are submitted electronically through https://procurement.opengov.com/portal/toaks. Site visits are encouraged but not required; no pre-bid meeting is scheduled. Questions should be directed to Mario Mazed, Engineering Assistant, at mmazed@toaks.gov or (805) 449-2477.

Opportunity text

The proposed improvements include the rehabilitation of an existing 24-inch Corrugated Metal Pipe (CMP) storm drain located within Moorpark Road using steam cured-in-place pipe (CIPP) lining. A new 30-inch storm drain manhole shall be constructed at the east end of the alignment to provide access for CIPP lining installation. Access at the west end shall be provided through an existing curb inlet catch basin. The scope of work also includes pavement rehabilitation on the west side of Moorpark Road, directly across from the primary scope of work.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors