MI_2622__Plans_&_Drawings_#26-02A.pdf

PDF 4 MB Posted

Attached to
MI 2622 - Moorpark Storm Drain Pipe (CMP) Lining and Repair at Gainsborough
Solicitation number
2025/2026-26
Issued by
Ventura County, California

About this file

This file consists of construction plans and drawings for the City of Thousand Oaks Public Works Department, prepared by FUSCOE Engineering (Andrew Wilrodt, RCE #C49881), detailing the Moorpark Storm Drain Pipe (CMP) Lining and Repair project at Gainsborough (Project No. MI2622, Specification No. 2025/2026-26). The project involves the rehabilitation of an existing 24-inch Corrugated Metal Pipe storm drain located within Moorpark Road using steam cured-in-place pipe (CIPP) lining, with construction of a new 30-inch storm drain manhole at the east end of the alignment to provide access for CIPP installation. Access at the west end shall be provided through an existing curb inlet catch basin. The scope additionally includes pavement rehabilitation on the west side of Moorpark Road. The plans were issued for construction on June 12, 2026, and include four sheets covering cover sheet information, general notes, demolition details, and pavement and storm drain construction specifications. All work must comply with the City of Thousand Oaks 2018 Road Design and Construction Standard Plates, Standard Plans for Public Works Construction (SPPWC), CalTrans 2022 and 2010 Standard Plans, and applicable California Building Code provisions.

The contractor must possess a valid Class A General Engineering License and is solely responsible for calling USA Underground Alert at 811 no less than two days nor more than seven days prior to construction to locate existing underground utilities. The contractor assumes full responsibility for any damage to existing utilities during construction and must verify all utility locations through potholing prior to commencing work. The project requires compliance with the General Permit for Discharges of Storm Water Associated with Construction and Land Disturbance Activities (Order WQ 2022-0057-DWQ) through implementation of a Storm Water Pollution Prevention Plan (SWPPP). A minimum 10-foot travel lane must be maintained throughout construction, and all work shall be inspected by the City Public Works Department. The contractor must keep the work site clean and free from rubbish and debris throughout all phases of construction, including dust abatement measures as directed by the City Inspector.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET __ OF __

CITY OF THOUSAND OAKS

H. TED GERBER, CITY ENGINEER

DATEENGINEERING DIVISION MANAGER

CITY OF THOUSAND OAKS

DATEDATEREGISTERED ENGINEER

DATE

CHECKED

DATE

DATE

DESIGNED

DRAFTED BY

PREPARED BY

C.T.O.DATER.C.E. DATEREV. SYMBOL DESCRIPTION

Know what'sbelow.Callbefore you dig.

REVIEWED BY:

APPROVED BY:

DATEPROJECT ENGINEER

REVIEWED BY:

CITY OF THOUSAND OAKS DWG. _________26-02A

MOORPARK STORM DRAIN PIPE (CMP)

LINING AND REPAIR AT GAINSBOROUGH

ISSUED FOR CONSTRUCTION 06/12/26

06/12/26

BP

AW

06/12/26ANDREW WILRODT

fuscoe.com213.988.8802

600 Wilshire Blvd, Suite 1470 Los Angeles, Ca 90017

06/12/26

06/12/26

CC

AW

SITE MAP

SCALE: NTS

SHEET INDEX

SHT. NO. DESCRIPTION

NOTICE TO CONTRACTOR:

NOTICE TO CONTRACTOR:

CONTRACTOR SHALL POSSES A VALID CLASS "A" GENERAL ENGINEERING LICENSE

IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO CALL THE USA UNDERGROUND

ALERT FOR LOCATION OF EXISTING UNDERGROUND UTILITIES NO LESS THAN TWO DAYS NOR

MORE THAN SEVEN DAYS PRIOR TO CONSTRUCTION.

THE CONTRACTOR SHALL ASSUME SOLE RESPONSIBILITY FOR ANY DAMAGE DONE TO

EXISTING UTILITIES DURING CONSTRUCTION

1 COVER SHEET

VICINITY MAP

NO SCALE

PUBLIC WORKS DEPARTMENT

PROJECT SITE

CERTIFICATE OF "RECORD DRAWINGS"

I _____ANDREW WILRODT_____ HEREBY CERTIFY, BASED ON MY FIELD OBSERVATION OR

INFORMATION PROVIDED BY THE OWNER AND GENERAL CONTRACTORS THAT THE WORK ON SHEET

NO'S ___1___ THROUGH ____4__ MARKED AS "RECORD DRAWING" HAS BEEN CONSTRUCTED IN

SUBSTANTIAL COMPLIANCE WITH THESE PLANS, SPECIFICATIONS, REVISIONS, CHANGE ORDERS, AND FIELD CHANGES.

_____________________________ ___C49881_____ ____09/30/2028__

REGISTERED CIVIL ENGINEER RCE NUMBER EXP. DATE

(SIGNATURE)

DATE

MOORPARK STORM DRAIN PIPE (CMP) LINING

AND REPAIR AT GAINSBOROUGH

PROJECT NO. MI2622

SPECIFICATION NO. 2025/2026-26

CITY COUNCIL

CITY ENGINEER

H. TED GERBER

NADER HEYDARI

PUBLIC WORKS DIRECTOR

AL ADAMBOB ENGLER

DAVID NEWMAN

CITY MANAGER

ANDREW P. POWERS

MIKEY TAYLOR, MAYOR

C. TIE GUTIERREZ

PUBLIC UTILITIES WITHIN CITY OF THOUSAND OAKS

CITY OF THOUSAND OAKS

2100 EAST THOUSAND OAKS BOULEVARD

THOUSAND OAKS, CA 91362

BRET SHERMAN

805-376-5050

CALIFORNIA AMERICAN WATER COMPANY

2439 W. HILLCREST DRIVE

NEWBURY PARK, CA 91320

EMANUEL BARAJAS

805-432-5750

805-376-5033

BRET SHERMAN

THOUSAND OAKS, CA 91362

2100 EAST THOUSAND OAKS BOULEVARD

CITY OF THOUSAND OAKS

WATER:

WASTEWATER:

SPECTRUM

5142 CLARETON DRIVE

AGOURA HILLS, CA 91301

805-494-7013

THOUSAND OAKS, CA 91361

3589 FOOTHILL DRIVE

SOUTHERN CALIFORNIA EDISON COMPANY

BOB MIGLIORE

GAS:

CABLE TV:

ELECTRICITY:

TELEPHONE:

THOMAS MINTER

818-575-7064

JASON EISEL

201 FLYNN ROAD

CAMARILLO, CA 93012

805-233-1472

SOUTHERN CALIFORNIA GAS COMPANY

9400 OAKDALE AVENUE

CHATSWORK, CA 91311

805-795-4593

FRONTIER

FRONTIER

201 FLYNN ROAD

CAMARILLO, CA 93010

THOMAS PEARSON

805-445-9116

ELISABETH PANIAGUA

CALLEGUAS MUNICIPAL WATER DISTRICT

2100 EAST OLSEN ROAD

THOUSAND OAKS, CA 91360

KRISTINE MCCAFFREY

805-579-7128

COVER SHEET

SF. DWG. NO. A101

2 GENERAL NOTES

3 DEMOLITION

4 PAVEMENT AND STORM DRAIN CONSTRUCTION

N M

O O

RP

AR

K

RD

101 FREEWAY

F

RE

EW

AY

E JANSS RD

E GAINSBOROUGH RD

805-376-5095

MICHAEL FAHRENKOPF

THOUSAND OAKS, CA 91362

2100 EAST THOUSAND OAKS BOULEVARD

CITY OF THOUSAND OAKS

STORMWATER:

626-664-5649

MOORPARK/SENIOR PATROLMAN

SHANE OLESEN

CONTACT FOR 66KV LINE

NORTH COAST TRANSMISSION

06/16/2026

Shamir Shahamiri 6/16/2026

06-18-2026

H. TED GERBER, CITY ENGINEER

DATEENGINEERING DIVISION MANAGER

CITY OF THOUSAND OAKS

DATEDATEREGISTERED ENGINEER

DATE

CHECKED

DATE

DATE

DESIGNED

DRAFTED BY

PREPARED BY

C.T.O.DATER.C.E. DATEREV. SYMBOL DESCRIPTION

Know what'sbelow.Callbefore you dig.

REVIEWED BY:

APPROVED BY:

DATEPROJECT ENGINEER

REVIEWED BY:

CITY OF THOUSAND OAKS DWG. _________26-02A

MOORPARK STORM DRAIN PIPE (CMP)

LINING AND REPAIR AT GAINSBOROUGH

ISSUED FOR CONSTRUCTION 06/12/26

06/12/26

BP

AW

06/12/26ANDREW WILRODT

fuscoe.com213.988.8802

600 Wilshire Blvd, Suite 1470 Los Angeles, Ca 90017

06/12/26

06/12/26

CC

AW 2

GENERAL NOTES

ABBREVIATIONS

CB CATCH BASIN

COM COMMUNICATIONS

E EAST

N NORTH

SCE SOUTHERN CALIFORNIA EDISON

SD STORM DRAIN

STA STATION

TC TOP OF CURB

SURVEY MAPPING NOTES INFORMATION

HORIZONTAL DATUM (BASIS OF BEARINGS AND MEASUREMENTS)

ALL DISTANCES, BEARINGS, AND COORDINATES ARE BASED ON ZONE 5 OF THE CALIFORNIA COORDINATE SYSTEM (CCS), NAD83 (2011), EPOCH 2017.50. THE HORIZONTAL ADJUSTMENT WAS PERFORMED BY UTILIZING 3 CONTINUOUS GLOBAL POSITIONING SYSTEM (CGPS) STATIONS. THE PUBLISHED VALUES FOR THE CGPS STATIONS WERE PROVIDED BY THE CALIFORNIA SPATIAL REFERENCE CENTER (CSRC). THE MEASURED DISTANCES FOR THE PROJECT ARE GROUND DISTANCES. GROUND DISTANCES WERE OBTAINED BY DIVIDING THE GRID DISTANCES USING THE COMBINED FACTOR OF 0.9999441871 CALCULATED AT CONTROL POINT 52.

VERTICAL DATUM

COUNTY OF VENTURA - PUBLIC WORKS AGENCY BENCHMARK 33-10 (VCPID 1677).

ELEV 239.701m (NAVD 88, NGS PUB 1995 EPOCH) AT THE SOUTHWEST CORNER OF THE INTERSECTION OF MOORPARK ROAD WITH GAINSBOROUGH ROAD, 10.3 FEET SOUTHEASTERLY OF A TRAFFIC SIGNAL STANDARD, 7.7 FEET EASTERLY FROM THE FACE OF A 3" BLOCKWALL, 7.5 FEET NORTHEASTERLY FROM A MAN HOLE,

2.7 FEET EASTERLY FROM A POWER POLE, 0.2 FEET SOUTHERLY FROM A CURB RETURN.

MONUMENTATION PRESERVATION

CONTRACTOR SHALL LOCATE, PROTECT, AND SAVE ANY AND ALL SURVEY MONUMENTS THAT WILL BE OR MAY BE DAMAGED OR DESTROYED BY THEIR OPERATIONS. ONCE FOUND, THE CONTRACTOR SHALL THEN NOTIFY THE CITY ENGINEER. THE CITY SHALL RESET ALL SAID MONUMENTS. EXISTING SURVEY MONUMENTS THAT WILL BE IMPACTED SHALL BE IDENTIFIED BY THE CONTRACTOR FOR THE CITY TO ESTABLISH TIES PRIOR TO AND AFTER CONSTRUCTION. THESE SURVEY MONUMENTS ARE NOTED AS ON THE PLANS.

GENERAL NOTES

1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CITY OF THOUSAND OAKS 2018 ROAD DESIGN AND CONSTRUCTION STANDARD PLATES, STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION (SPPWC) LATEST EDITION AND SUPPLEMENTS, STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) 2022 AND 2010 STANDARD PLANS, CALIFORNIA LAW GOVERNMENT CODE - GOV TITLE 1 100-7914 (4215), THE CALIFORNIA BUILDING CODE (EXCAVATION AND GRADING), AND IN

ACCORDANCE WITH THE PROJECT SPECIFICATIONS.

2. UTILITIES HAVE BEEN LOCATED TO THE BEST OF THE ENGINEER'S ABILITY AND FROM DATA AND RECORDS FURNISHED BY THE REPRESENTATIVES OF THE VARIOUS UTILITIES. IT SHALL BE THE SOLE DUTY AND RESPONSIBILITY OF THE CONTRACTOR TO ASCERTAIN THE TRUE LOCATION OF AND IDENTIFY ANY/ALL UNDERGROUND UTILITIES AND VERIFY ALL CONDITIONS ON THE JOB SITE. CONTRACTOR SHALL POTHOLE TO VERIFY THE LOCATION OF EACH AND COORDINATE WITH RESPECTIVE OWNERS FOR

RELOCATION IF NECESSARY. HAND DIG EXCAVATIONS UNTIL CLEAR OF OBSTRUCTIONS.

3. CONTRACTOR SHALL FIELD VERIFY ALL CONTROLLING DIMENSIONS PRIOR TO ORDERING MATERIALS AND COMMENCING WORK.

4. CONTRACTOR SHALL MAKE EXPLORATION EXCAVATIONS AND LOCATE EXISTING UNDERGROUND FACILITIES SUFFICIENTLY AHEAD OF CONSTRUCTION TO PERMIT REVISIONS TO PLANS IF REVISIONS ARE NECESSARY BECAUSE OF ACTUAL LOCATION OF EXISTING

FACILITIES.

5. ALL UTILITY LATERALS ARE NOT SHOWN. CONTRACTOR TO VERIFY ALL LATERAL LOCATIONS PRIOR TO BEGINNING WORK.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO ANY PUBLIC OR PRIVATE UTILITIES AND/OR STRUCTURES SHOWN ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES OR STRUCTURES FOUND AT THE SITE, ANY PIPES DAMAGED SHALL BE REPLACED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE OWNERS OF THE UTILITIES OR STRUCTURES BEFORE STARTING WORK (SEE PROJECT SPECIFICATIONS FOR

MINIMUM NOTICE).

7. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE DIVISION OF INDUSTRIAL RELATIONS (CAL/OSHA OR DOSH) SAFETY STANDARDS, IN ACCORDANCE WITH SECTION 5-7 OF THE SSPWC. CONTRACTOR SHALL PROVIDE PROOF OF A PERMIT FROM

CAL/OSHA IF REQUESTED BY THE INSPECTOR.

8. CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT (USA) AT 811 AT LEAST TWO (2) WORKING DAYS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION TO ALLOW UTILITY OWNERS TO MARK THE LOCATION OF THEIR RESPECTIVE UNDERGROUND FACILITIES/UTILITIES, PUBLIC OR PRIVATE, SHOWN OR NOT SHOWN ON THESE PLANS.

9. THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO OR

USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE APPROVED BY THE ENGINEER.

10. WORK IN PUBLIC STREETS AND RIGHT-OF-WAY, ONCE BEGUN, SHALL BE PERFORMED TO COMPLETION WITHOUT DELAY SO AS TO

PROVIDE MINIMUM INCONVENIENCE TO ADJACENT PROPERTY OWNERS AND TO THE PUBLIC.

11. CONTRACTOR SHALL DESIGN, CONSTRUCT, AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE, AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS, AND

REGULATIONS.

12. ALL WORK SHALL BE INSPECTED BY THE CITY PUBLIC WORKS DEPARTMENT.

13. THROUGHOUT ALL PHASES OF CONSTRUCTION, INCLUDING SUSPENSION OF WORK, UNTIL FINAL ACCEPTANCE OF THE PROJECT, THE CONTRACTOR SHALL KEEP THE WORK SITE CLEAN AND FREE FROM RUBBISH AND DEBRIS. THE CONTRACTOR SHALL ALSO ABATE DUST NUISANCE BY CLEANING, SWEEPING, VACUUMING AND SPRINKLING WITH WATER AND USING DUST FENCES OR

OTHER METHODS AS DIRECTED BY THE CITY THROUGHOUT THE CONSTRUCTION OPERATION.

14. SAWCUTTING OF EXISTING PAVEMENT SHALL BE TO A CLEAN STRAIGHT EDGE AS DIRECTED BY THE CITY INSPECTOR.

15. THE CONTRACTOR SHALL MAINTAIN A MINIMUM 10' OF TRAVEL LANE AT ALL TIMES DURING CONSTRUCTION.

16. ALL CONSTRUCTED SIDEWALKS AND WALKWAYS SHALL REQUIRE A NON-SLIP FINISH AS DESCRIBED IN SECTION 303-5.5.3 OF THE

STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION.

STORMWATER POLLUTION CONTROL NOTES

1. THE CONTRACTOR SHALL COMPLY WITH THE GENERAL PERMIT FOR DISCHARGES OF STORM WATER ASSOCIATED WITH CONSTRUCTION AND LAND DISTRUBANCE ACTIVITIES, (GENERAL PERMIT) ORDER WQ 2022-0057-DWQ, BY IMPLEMENTING THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP). THE CONTRACTOR HAS A NUMBER OF RESPONSIBILITIES AS DELINEATED IN THE GENERAL PERMIT, INCLUDING, BUT NOT LIMITED TO, THE PROVISION OF EROSION CONTROL AND POLLUTION CONTROL MEASURES AND MANAGEMENT, LOG-KEEPING, TRAINING, AND AMENDING AND UPDATING THE SWPPP AS CALLED FOR DUE TO SITE CONDITIONS WHICH CAN VARY THROUGHOUT THE

DURATION OF CONSTRUCTION.

EROSION CONTROL NOTES

POLLUTION PREVENTION NOTES

BW BACK OF WALK

RIGHT OF WAY AND CENTERLINE DISCLAIMER

THE RIGHT-OF-WAY LINES SHOWN ON THIS PLAN ARE DEPICTED FOR GRAPHICAL AND INFORMATIONAL PURPOSES ONLY. THEY DO NOT REPRESENT THE RESULTS OF A BOUNDARY SURVEY, ARE NOT INTENDED FOR THE ESTABLISHMENT OF PROPERTY OR BOUNDARY LINES, AND SHALL NOT BE RELIED UPON FOR ANY BOUNDARY DETERMINATION OR LEGAL DESCRIPTION

FL FLOW LINE

AC ASPHALT CONCRETE

LIP LIP OF GUTTER

INV INVERT

CMP CORRUGATED METAL PIPE

RCP REINFORCED CONCRETE PIPE

SPPWC STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION

FS FINISH SURFACE

MH MANHOLE

06/16/2026

N M

OORPA

RK

RD

GAINSBOROUGH RD

APPROX. 470' SOUTH

SHEET __ OF __

CITY OF THOUSAND OAKS

H. TED GERBER, CITY ENGINEER

DATEENGINEERING DIVISION MANAGER

CITY OF THOUSAND OAKS

DATEDATEREGISTERED ENGINEER

DATE

CHECKED

DATE

DATE

DESIGNED

DRAFTED BY

PREPARED BY

C.T.O.DATER.C.E. DATEREV. SYMBOL DESCRIPTION

Know what'sbelow.Callbefore you dig.

REVIEWED BY:

APPROVED BY:

DATEPROJECT ENGINEER

REVIEWED BY:

CITY OF THOUSAND OAKS DWG. _________26-02A

MOORPARK STORM DRAIN PIPE (CMP)

LINING AND REPAIR AT GAINSBOROUGH

ISSUED FOR CONSTRUCTION 06/03/26

06/03/26

BP

AW

06/03/26ANDREW WILRODT

fuscoe.com213.988.8802

600 Wilshire Blvd, Suite 1470 Los Angeles, Ca 90017

06/03/26

06/03/26

CC

AW 3

DEMOLITION

DEMOLITION LEGEND

DEMOLITION NOTES

NOTICE TO CONTRACTOR

EXISTING UTILITIES

06/16/2026

H. TED GERBER, CITY ENGINEER

DATEENGINEERING DIVISION MANAGER

CITY OF THOUSAND OAKS

DATEDATEREGISTERED ENGINEER

DATE

CHECKED

DATE

DATE

DESIGNED

DRAFTED BY

PREPARED BY

C.T.O.DATER.C.E. DATEREV. SYMBOL DESCRIPTION

Know what'sbelow.Callbefore you dig.

REVIEWED BY:

APPROVED BY:

DATEPROJECT ENGINEER

REVIEWED BY:

CITY OF THOUSAND OAKS DWG. _________26-02A

MOORPARK STORM DRAIN PIPE (CMP)

LINING AND REPAIR AT GAINSBOROUGH

ISSUED FOR CONSTRUCTION 06/12/26

06/12/26

BP

AW

06/12/26ANDREW WILRODT

fuscoe.com213.988.8802

600 Wilshire Blvd, Suite 1470 Los Angeles, Ca 90017

06/12/26

06/12/26

CC

AW 4

PAVEMENT AND STORM DRAIN CONSTRUCTION

785-

790-

800-

785-

790-

800-

0+80 1+00 2+00 2+50

PROFILE SCALE:

HORIZ: 1" = 10'

VERT: 1" = 2'

STORM DRAIN & DUCT BANK DETAIL

NOT TO SCALE

STA1+75.337 - STA1+83.61

SITE LEGEND

NOTICE TO CONTRACTOR CONSTRUCTION NOTES

PAVING GENERAL NOTES

SIDEWALK SLAB REPAIR W/ DOWEL

NOT TO SCALE

N M

OORPA

RK

RD

N M

O O

RP

AR

K

RD

06/16/2026

Shamir Shahamiri 6/16/2026 http://www.brooksproductsnw.com/catalog/catchbasin1212cat.pdf

File details come from the government source that posted it. Updated .