ITB – Drainage Improvements in the Barwood Subdivision (2018) for Harris County Precinct 3 (CDBG-MIT / GLO)
Closed State & local contract opportunity Posted
- Solicitation number
- 25/0227
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 91223 Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, Etc.)
- 91244 Excavation Services
- 91339 Construction, Pipe Culvert
- 91345 Construction, Sewer And Storm Drain
- 91350 Construction, Street (Major And Residential)(Includes Reconstruction)
- 91377 Maintenance And Repair, Pipe Culvert
- 91381 Maintenance And Repair, Sewer And Storm Drain (Including Removal)
- 91384 Maintenance And Repair, Street (Major And Residential)
- 96833 Ditch Maintenance
- UNSPSC codes
- 72141123 Manhole construction service
- 72141511 Digging services
- 72141504 Timber removal service
- 72101515 Subsidence service work
- 72141130 Ornamental fountain construction and or remodelling service
- 72141503 Rock removal service
- 73151801 Sheeting services
- 72101512 Hoist construction service
- 72101513 Offsite construction service
- 72101514 Refuse area construction service
Opportunity details come from harriscountytx.bonfirehub.com. Updated .
About this opportunity
Harris County Precinct 3 is procuring a drainage improvements project for the Barwood Subdivision, utilizing Community Development Block Grant - Mitigation (CDBG-MIT) funding from the General Land Office (GLO). The project involves constructing 8,600 linear feet of storm sewer drainage infrastructure using open cut construction methods to convey drainage from the Barwood Subdivision to the HCFCD Unit E132-00-00 drainage channel. Key deliverables include street paving demolition, storm sewer reconstruction, traffic control, stormwater pollution prevention, replacement paving, and pavement markings. The contract has a 360-working day completion timeline, with a pre-bid conference held on July 22, 2025, and bid submissions due on August 4, 2025, at 2:00 p.m. local time. Bidders must provide comprehensive documentation including bid bonds, insurance certificates, and compliance forms related to federal grant requirements. The project requires contractors to perform a minimum of 25% of the work themselves and adhere to specific technical specifications for storm sewer elements, utility relocations, and site restoration.
The procurement emphasizes participation from Minority and Women-Owned Business Enterprises (M/WBE), with specific goals for engaging certified local businesses. Historically Underutilized Businesses (HUBs), Small Business Enterprises, Women Business Enterprises, and Section 3 Business Concerns are encouraged to participate. The county requires bidders to make good faith efforts to engage minority and women-owned businesses, with detailed documentation of outreach and utilization plans. Eight vendors submitted bids, with C.E. Barker, Ltd. being the lowest bidder at $10,975,787.90. The project has extensive compliance requirements, including adherence to Davis-Bacon wage rates, Section 3 Act of 1968, and various federal, state, and local regulatory standards. Funding sources include federal grants from GLO, FEMA, and HUD, with potential administrative remedies for non-performance. The contract will be awarded to the lowest responsive and responsible bidder, with a focus on comprehensive regulatory compliance and local business participation.
Opportunity text
Drainage Improvements in the Barwood Subdivision (2018) for Harris County Precinct 3 - UPIN 19103MF12H01
Files
Show all 35
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity