15-Attachment G - Contractor Profile.pdf

PDF 161 KB Posted

Attached to
ITB – Drainage Improvements in the Barwood Subdivision (2018) for Harris County Precinct 3 (CDBG-MIT / GLO)
Solicitation number
25/0227
Issued by
Harris County, Texas

About this file

The document is Attachment G, a Contractor Profile form designed to be submitted within 15 working days after being identified as the apparent low bidder for a project. The form requires comprehensive company information including basic contact details, contract type, ownership characteristics, and financial scope. Contract types can be selected from various categories such as Construction, Professional Services, Non-professional Services, Supplies, Equipment, or Architectural/Engineering work.

The form captures critical business identification details including federal tax ID, unique entity identifier (UEI), trade category, principal ownership status, and minority/women-owned business designation. Contractors must provide their estimated contract or subcontract amount and indicate whether they are women-owned or minority-owned by checking the appropriate boxes. The document concludes with a space for the contractor's signature and date, serving as an official submission of the company's profile for a specific project procurement process.

View the file

Other files

File Type Posted
34-BidOpeningSummaryReport 2025-08-04.pdf PDF
11-Attachment W - GLO Compliance Package.pdf PDF
1-Attachment A - Bid Addenda Acknowledgement.pdf PDF
21-Attachment V - Project Signs and Plaques.pdf PDF
13-Attachment CC – MWBE Utilization Plan Commitment Form.pdf PDF
9-Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
17-Attachment L - Certification of Compliance with Federal Standards Requirements.pdf PDF
10-Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf PDF
33-25 0227 - Bid Submissions.zip ZIP file
2-Attachment B - Bid Schedule - Pricing Form.pdf PDF
32-Addendum No. 1 - General Notices, Notes and Information.pdf PDF
16-Attachment Q - Section 3 Bid Requirements.pdf PDF
18-Attachment P - Required Contract Provisions.pdf PDF
30-Addendum No. 1 - Plans and Drawings (Index Sheet).pdf PDF
27-Attachment S - Plans and Drawings.pdf PDF
19-Attachment T - General Conditions.pdf PDF
12-Attachment FF - Heat Protection Safety Requirements.pdf PDF
22-Attachment Z - Policy for Payment.pdf PDF
23-Attachment AA - Report File.pdf PDF
7-Attachment K - Payment Bond.pdf PDF
3-Attachment C - Certification Regarding Lobbying.pdf PDF
29-Addendum No. 1 - 250227.pdf PDF
20-Attachment U - General Notices, Notes and Information.pdf PDF
24-Attachment BB - MWBE Goal Participation Information Packet.pdf PDF
35-25-5445 Award Job No. 250227 - C.E. Barker, Ltd.pdf PDF
31-Addendum No. 1 - Plans and Drawings (Proposed Typical Sections).pdf PDF
8-Attachment M - Minimum Insurance Requirements for Harris County.pdf PDF
25-Federal IFB General Conditions and Specifications - Construction.docx DOCX document
5-Attachment F - References.pdf PDF
28-Pre Bid Sign-in Sheet 250227.pdf PDF
14-Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf PDF
4-Attachment D - Statement of Bidder Qualifications.pdf PDF
26-Attachment O - Davis Bacon Wage Decision.pdf PDF
6-Attachment I - Performance Bond for Public Works over 100,000.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment G

CONTRACTOR PROFILE

(To be submitted within fifteen (15) working days after being notified as apparent low bidder.)

Project Name: _________________________________________________ Project No. _______

Name of Contractor ______________________ FED Tax ID#_____________ UEI # ___________

Name of Subcontractor ___________________ FED Tax ID#_____________ UEI # ___________

Category of Trade (e.g. Carpentry, Electrical, Plumbing, etc.)

Type of Contract:

□ Construction □ Professional □ Non-professional Services □ Supplies □ Equipment

□ Architectural / Engineering

Name of Principal Owner(s) ______________________________________________________________

Name of Contact Person _________________________________________________________________

Company Address ______________________________________________________________________

Phone ______________________________________________________________________________

Email _______________________________________________________________________________

Estimated Amount of Contract or Subcontract:

Women Owned: Yes No

Minority Owned: Yes No

Signature of Contractor Date

File details come from the government source that posted it. Updated .