12-Attachment FF - Heat Protection Safety Requirements.pdf

PDF 43 KB Posted

Attached to
ITB – Drainage Improvements in the Barwood Subdivision (2018) for Harris County Precinct 3 (CDBG-MIT / GLO)
Solicitation number
25/0227
Issued by
Harris County, Texas

About this file

This document is Attachment FF, a Heat Protection Safety Requirement specification for a construction or outdoor work project. The attachment outlines comprehensive safety guidelines for workers exposed to various weather conditions, with a specific focus on extreme heat protection. The requirement mandates that the Prime Contractor include detailed provisions in the project Safety Plan to protect workers from heat-related and cold-related illnesses, ensuring worker safety throughout the project's execution.

The document specifies that when temperatures reach or exceed 90 degrees (either actual temperature or heat index), the contractor must implement a project-specific Heat Awareness Plan. This plan must include provisions for worker acclimatization, access to water, rest periods, and shade. Vendors acknowledge and agree to these safety requirements by signing the Bid Acknowledgement at the time of submission, demonstrating their commitment to maintaining a safe working environment for employees during potentially hazardous weather conditions.

View the file

Other files

File Type Posted
34-BidOpeningSummaryReport 2025-08-04.pdf PDF
11-Attachment W - GLO Compliance Package.pdf PDF
1-Attachment A - Bid Addenda Acknowledgement.pdf PDF
15-Attachment G - Contractor Profile.pdf PDF
21-Attachment V - Project Signs and Plaques.pdf PDF
13-Attachment CC – MWBE Utilization Plan Commitment Form.pdf PDF
9-Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
17-Attachment L - Certification of Compliance with Federal Standards Requirements.pdf PDF
10-Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf PDF
33-25 0227 - Bid Submissions.zip ZIP file
2-Attachment B - Bid Schedule - Pricing Form.pdf PDF
32-Addendum No. 1 - General Notices, Notes and Information.pdf PDF
16-Attachment Q - Section 3 Bid Requirements.pdf PDF
18-Attachment P - Required Contract Provisions.pdf PDF
30-Addendum No. 1 - Plans and Drawings (Index Sheet).pdf PDF
27-Attachment S - Plans and Drawings.pdf PDF
19-Attachment T - General Conditions.pdf PDF
22-Attachment Z - Policy for Payment.pdf PDF
23-Attachment AA - Report File.pdf PDF
7-Attachment K - Payment Bond.pdf PDF
3-Attachment C - Certification Regarding Lobbying.pdf PDF
29-Addendum No. 1 - 250227.pdf PDF
20-Attachment U - General Notices, Notes and Information.pdf PDF
24-Attachment BB - MWBE Goal Participation Information Packet.pdf PDF
35-25-5445 Award Job No. 250227 - C.E. Barker, Ltd.pdf PDF
31-Addendum No. 1 - Plans and Drawings (Proposed Typical Sections).pdf PDF
8-Attachment M - Minimum Insurance Requirements for Harris County.pdf PDF
25-Federal IFB General Conditions and Specifications - Construction.docx DOCX document
5-Attachment F - References.pdf PDF
28-Pre Bid Sign-in Sheet 250227.pdf PDF
14-Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf PDF
4-Attachment D - Statement of Bidder Qualifications.pdf PDF
26-Attachment O - Davis Bacon Wage Decision.pdf PDF
6-Attachment I - Performance Bond for Public Works over 100,000.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment FF

Heat Protection Safety Requirement

Guidance for all weather-related safety of workers, including but not limited to, extreme heat, cold weather or any adverse weather conditions shall be included in the project

Safety Plan. At a minimum, this must include provisions for keeping workers safe from heat related and/or cold related illnesses throughout the execution of their work. During extended periods of adverse weather conditions, the Prime Contractor shall provide accommodations to the workers as deemed necessary. This may include a project specific Heat Awareness Plan when temperatures reach over 90 degrees (temperature or heat index) with provisions for acclimatization, water, rest and shade.

Vendor understands by signing the Bid Acknowledgement at the time of submission that they agree to follow this heat protection safety requirement.

File details come from the government source that posted it. Updated .