GSC J-432-BID Campuswide HVAC and Electrical Systems Renewal

Awarded State & local contract opportunity Posted

Solicitation number
PE-47200-RFQ-2025-000000092
State
Georgia
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 36
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

Gordon State College, located in Barnesville, Georgia and operated through the Board of Regents of the University System of Georgia, is procuring general contracting services for a Design-Bid-Build campuswide HVAC and electrical systems renewal project (GSC J-432) through a sealed competitive bidding process. The scope encompasses comprehensive demolition and replacement of heating, ventilation, air conditioning, and electrical infrastructure across three major campus buildings: the Instructional Complex, Russell Hall, and the Student Center. Key deliverables include new variable air volume (VAV) units, air handling units (AHUs), cooling towers, three new condensing hot water boilers for system redundancy, chiller systems, and complete electrical system upgrades including new control panels, lighting fixtures with LED technology, wiring infrastructure, and building automation systems utilizing direct digital control (DDC) technology. The project requires integration with existing Johnson Controls systems and compliance with the 2023 National Electrical Code and Georgia State Minimum Standard codes. Qualified bidders must possess a Georgia General Contractor license, demonstrate financial responsibility with a current ratio of 1.0 or higher, maintain a Workers' Compensation Experience Modification Rate (EMR) not exceeding an average of 1.2 over three years, provide evidence of successful completion of prior public works projects, and ensure all surety and insurance companies are listed in the U.S. Department of Treasury's Circular 570 with an A.M. Best Financial Strength Rating of "A-" or better and Financial Size Category of Class V or larger. Bids must include a bid bond equal to not less than five percent of the bid amount, with performance and payment bonds each equal to 100 percent of the contract sum required prior to contract execution. A mandatory pre-bid conference was held on July 3, 2025, at 10:00 A.M., a second mandatory site visit occurred on July 22, 2025, from 9:00 A.M. to 11:00 A.M., written questions were due by July 10, 2025, with formal responses posted by July 14, 2025, and sealed bids were due on August 14, 2025, at 2:00 P.M. Eastern Time in the Bid Room in Building #5 (Facilities), with public bid opening and announcement following immediately thereafter. The contract requires completion of preconstruction activities upon the effective date and physical work completion within 270 consecutive calendar days from issuance of a Proceed Order, with work to occur primarily during normal business hours (6:00 A.M. to 5:00 P.M., Monday-Friday) while maintaining occupied building operations.

The procurement contains no specific set-aside designations for disadvantaged enterprises or restrictions limiting bidder eligibility beyond standard contractor licensing and bonding requirements under Georgia law and Board of Regents regulations. Incumbent contractor information indicates that John F. Pennebaker Co., Inc. was selected as the low bidder and awarded the contract in the amount of $2,850,498.00, representing the base bid less deductive alternates 1 through 8, establishing the contract value for this project. The existing infrastructure requiring integration includes the current Johnson Controls building automation system, which will be replaced with one of four approved control vendors (Distech by Hoffman Building Technologies, Delta by CCI, KMC by ESS, or CMS controls), all integrating into a Niagara N4 front-end system, and existing electrical panels that are to remain and be reused for new work with no new panel installations anticipated. The bid includes six electrical lighting alternates (E1-E6) and two mechanical alternates (M1-M2), all structured as deductive options to be taken in numerical sequence if needed to remain within budget, allowing flexibility in project scope based on final funding availability. Contractors must comply with the Georgia Security and Immigration Compliance Act, the Immigration Reform and Control Act of 1986, and certify non-debarment status, with the Owner reserving the right to reject all bids, waive technicalities, and negotiate with the lowest responsive and responsible bidder if all bids exceed the established budget.

Opportunity text

** PLEASE SEE ADDENDUM 4 FOR BID OPENING UPDATE. ** Please review the Invitation to Bid for Gordon State College, Campuswide HVAC and Electrical Systems Renewal project. The Owner will receive sealed bids from Contractors. Bids must be physically on the table in the Bid Room in Lambdin Hall by Two (2:00 PM), at the time legally prevailing in Atlanta, Georgia on August 14, 2025, all bids will be publicly opened and announced. See the attached documents for the location and further details.

Files

File Type Posted
GSC J_432 Project Manual.pdf PDF
Bid Tab.pdf PDF
GSC J_432 DBB Award.docx DOCX document
J_432 GSC GC _ ADDENDUM 2.pdf PDF
Sample Contract.pdf PDF
GSC J_432 DBB_Award.docx DOCX document
GSC J_432 Drawings.pdf PDF
J_432 GSC _ GC ADDENDUM 3.pdf PDF
J432 2025_07_14_GSC_Hvac_ElecRenewal_Add_2_NB.pdf PDF
J_432 GSC GC _ ADDENDUM 1.pdf PDF
GSC J_432 Bid Package.pdf PDF
J_432 GSC GC _ ADDENDUM 4.pdf PDF
Show all 12

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors